FedTALLY

Awards for “HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.

25 awards on this page · sorted by amount · page 1

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
NNJ10TB01CHAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$1.45B
2010-10-012027-09-30336419EXTRAVEHICULAR SPACE OPERATIONS CONTRACT (ESOC)
0001HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Defense$22.2M
2012-09-262014-08-28334516PRODUCTION OF CHEMICAL BIOLOGICAL MASS
0002HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Defense$20.96M
2013-02-222016-09-30334516FINAL PRODUCTION OF CHEMICAL BIOLOGICAL MASS SPECTROMETER II, 81 UNITS.
80JSC019F0043HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$18.41M
2018-12-062027-09-30541330DELIVER THE UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) FOR TECHNOLOGY DEMONSTRATION TO THE INTERNATIONAL SPACE STATION (ISS). PROVIDE SUSTAINING ENGINEERING SERVICES FOR THREE YEARS OF UWMS OPERATIONS.
0005HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Defense$6.27M
2013-07-122016-05-31334516PURCHASE 14 CBMS II UNITS
80JSC018F0135HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$6.21M
2018-04-022023-09-30541330ADVANCED PORTABLE LIFE SUPPORT SYSTEM (PLSS) LABORATORY SUPPORT(APLS) PLSS APLS
HSHQDC07C00059HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Homeland Security$4.75M
2007-05-312009-12-31541710PHILIS PHASE IV
HDTRA118C0012HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Defense$4.14M
2017-11-202019-11-19541714PERSONAL CHEMICAL HAZARD DETECTOR
80JSC020C0019HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$3.77M
2019-11-042021-08-31541330FLIGHT RELEASABLE ATTACHMENT MECHANISM (FRAM) FOR DELIVERING UNPRESSURIZED CARGO TO THE INTERNATIONAL SPACE STATION (ISS). THIS CONTRACT INCLUDES THE HARDWARE PROCUREMENT, BUILD AND TESTING REQUIRED FOR THREE EXPRES
NAS997143HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$3.46M
2000-07-312005-10-07541330ENVIRONMENTAL CONTROL AND LIFE SUPPORT SERVICES (ECLSS) ENGINEERING SUPPORT
0007HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Defense$3.26M
2013-11-152017-09-24334516RELIABILITY ENGINEERING CHANGE PROPOSAL
80JSC021F0025HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$3.1M
2021-02-262022-09-30541330RCA - SPARE ACTUATOR
FA865017C9101HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.Department of Defense$2.75M
2017-01-312019-01-01541711IGF::OT::IGF TANDEM ION MOBILITY SPECTROMETER FOR MOLECULAR ANALYZER FOR EFFICIENT GAS-PHASE LOW-POWER INTERROGATION
NNJ12HB01DHAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$2.2M
2011-12-022015-06-30541330HAMILTON RAPID CYCLE AMINE PROTOTYPE
80JSC021F0159HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$2.13M
2021-04-212026-09-30541330UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) SUSTAINING SPARES AND CONSUMABLES
80JSC021F0281HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$2.05M
2021-08-232027-03-12541330UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) YEAR 4 QUARTER 1 MILESTONE
80JSC020F0005HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$1.94M
2019-11-122021-01-31541330RAPID AMINE CYCLE (RCA)
80JSC019F0039HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$1.55M
2018-11-202021-11-15541330UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) SUSTAINING ENGINEERING
80JSC022F0024HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$1.51M
2021-11-172026-10-21541330UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) YEAR 4 QUARTER 1 MILESTONE
80JSC018P0050HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$1.4M
2018-03-292020-04-30333914WATER PUMPS FOR SPACE SUIT LIFE SUPPORT SYSTEM
80JSC024F0062HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$1.1M
2024-06-192027-03-31541330UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) SUSTAINING SPARES AND CONSUMABLES TASK ORDER REQUIREMENT
NNJ16HD07DHAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$999.63K
2015-12-012018-11-30541330IGF::OT::IGF THE CREW AND THERMAL SYSTEMS DIVISION AT JSC IS DESIGNING, DEVELOPING, INTEGRATING, AND TESTING AN ADVANCED EXPLORATION SYSTEMS (AES) ADVANCED SPACE SUIT PORTABLE LIFE SUPPORT SYSTEM (PLSS). THE PURPOSE OF THE PLSS IS TO MAINTAIN LIFE SUPPORT SERVICES TO A SUITED CREW-MEMBER DURING AUTONOMOUS AND VEHICLE INTERFACE OPERATIONS. THE PLSS IS DESIGNED WITH FIVE LOOPS THAT WHEN INTEGRATED TOGETHER PROVIDE THE LIFE SUPPORT SERVICES: PRIMARY OXYGEN, SECONDARY OXYGEN, VENTILATION, THERMAL CONTROL, AND A CAUTION AND WARNING SYSTEM (CWS). THE PLSS HAS PROGRESSED THROUGH DESIGN, DEVELOPMENT, INTEGRATION, AND TESTING CULMINATING IN A SCHEMATIC, PLSS 1.0 INTEGRATED SYSTEM (BREAD-BOARD LEVEL WHICH VERIFIED THE SCHEMATIC), PLSS 2.0 INTEGRATED SYSTEM (NITROGEN COMPATIBLE, UNMANNED INITIAL PACKAGED PLSS). THE DESIGN OF A PLSS 2.5 (FINAL PACKAGING WITH ADDED ENVIRONMENTS) IS UNDERWAY. THE PLAN IS TO CONTINUE THE DEVELOPMENT BEYOND PLSS 2.5 TO A PLSS 3.0 (HUMAN-RATED OXYGEN COMPATIBLE). DESIGN, DEVELOPMENT, TEST, AND EVALUATION (DDT&E) OF PLSS COMPONENTS, LABORATORY SUPPORT, AND ANALYSIS WILL BE NEEDED TO COMPLETE THE PLSS 2.5 FULLY INTEGRATED SYSTEM AS WELL AS PROGRESS TOWARD PLSS 3.0.
NNJ12HE86DHAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$949.99K
2012-09-262015-11-30541330THE CREW AND THERMAL SYSTEMS DIVISION AT JSC IS DEVELOPING AND INTEGRATING TECHNOLOGY FOR THE OFFICE OF THE CHIEF TECHNOLOGIST(OCT) AND THE ADVANCED EXPLORATION SYSTEMS EXTRAVEHICULAR ACTIVITY(EVA) SUIT/PORTABLE LIFE SUPPORT SYSTEM PROJECT(PLSS).ENGINEERING DEVELOPMENT, TECHNICIAN SUPPORT, CODE DEVELOPMENT, AND OPERATIONAL CONCEPT DEVELOPMENT FOR PLSS 2.0 HARDWARE IS NEEDED FOR COMPLETING A FULLY INTEGRATED SYSTEM WITHIN FY13. SWME FLUID LOOP MANAGEMENT- TEAM IS UTILIZING THE SPACESUIT WATER MEMBRANE EVAPORATOR AS THE HEAT REJECTION TECHNOLOGY FOR THE AES EVA PLSS. IN ORDER TO ENSURE ADEQUATE PERFORMANCE OF THE SWME, IT WILL REQUIRE A BIOCIDE DELIVERY SYSTEM, ION EXCHANGE BED AND ORGANIC REMOVAL BED. THE REMEDIATION BEDS CONTAIN PROPRIETARY HARDWARE. THE CONTRACTOR SHALL PROVIDE GUIDANCE FOR INTEGRATION OF THE OPA DELIVERY SYSTEM INTO THE THERMAL LOOP TEST BED. ALSO WATER CHEMISTRY AND BIOCIDE DISCUSSION. SPACE SUIT TECHNICIAN SUPPORT- THIS SUPPORT IS CRUCIAL TO THE ON-TIME DELIVERY OF THE ORTHO-PHTHALALDEHYDE (OPA) DELIVERY SYSTEM INTO THE THERMAL LOOP TEST BED. CONTRACTOR SHALL PROVIDE SWME (SPACESUIT WATER MEMBRANE EVAPORATOR) TESTING SUPPORT; PRIMARY OXYGEN REGULATOR/SECONDARY OXYGEN REGULATOR TESTING SUPPORT; PLSS 2.0 CABLE CALIBRATION; GENERAL MAINTENANCE AND CALIBRATION ENGINEERING CONSULT FOR PLSS 2.0 MECHANICAL- CONTRACTOR SHALL REVIEW THE PLSS SCHEMATICS IN CONTEXT TO LESSONS LEARNED FROM DEVELOPMENT OF A SIMILAR SYSTEM AS PART OF THE SHUTTLE/ISS EMU PROGRAM. PLSS 2.0 PNEUMO-HYDRAULIC SCHEMATICS AND TESTS SCHEMATIC REVIEW AND DISCUSSION; PLSS 2.0 TEST OBJECTIVE REVIEW AND DISCUSSION ELECTRICAL- CONTRACTOR SHALL PROVIDE ELECTRICAL HARNESS SCHEMATIC REVIEW; DISTRIBUTED CONTROL REVIEW AND DISCUSSION; CONTROL ALGORITHM REVIEW AND DISCUSSION. AS PART OF THE REVIEWS, THE CONTRACTOR SHALL CONSIDER THE LESSONS LEARNED FROM THE DEVELOPMENT OF THE SHUTTLE/ISS EMU. THAT REVIEW INCLUDES AN ASSESSMENT OF THE PROS/CONS FOR DISTRIBUTED VERSUS CENTRALIZED CONTROL WITH RESPECT TO HARNESS DESIGN AND THE PLANNED CONTROL ALGORITHMS AND OPERATIONS. CONTRACTOR, WILL NOT HOWEVER, BE MAKING NOR PROVIDE ANY TECHNICAL DIRECTION ASSOCIATED WITH THE ULTIMATE TECHNICAL SOLUTION, SPECIFICATIONS, OR DESIGN.
80HQTR19C0011HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$848.91K
2019-02-262022-08-31541715SPACE TRASH COMPACTOR CAPABILITIES, PHASE 1- RESEARCH AND DEVELOPMENT.
80JSC018F0170HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC.National Aeronautics and Space Administration$695.42K
2018-08-012021-12-31541330CREW SURVIVAL ENGINEERING (CSE) LABORATORY AND DEVELOPMENT SUPPORT (CSELDS)