FedTALLY

Award search

Awards for “CONSTRUCTICON CORP

25 awards on this page · sorted by amount · page 1

Federal prime contract awards for CONSTRUCTICON CORP
Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
W9123817C0030CONSTRUCTICON CORPDepartment of Defense$7.13M
2017-09-202019-11-06236220IGF::OT::IGF STANDARD MAGAZINE REHABILITATION SIERRA ARMY DEPOT, HERLONG, CA L2M0240
SP330020F0951CONSTRUCTICON CORPDepartment of Defense$5.01M
2020-07-152022-11-142362208507520697!LIGHTING AND ACOUSTICAL CEILI
W9123816C0035CONSTRUCTICON CORPDepartment of Defense$3.3M
2016-09-302017-10-31236220IGF::OT::IGF W91238-16-C-0035 BUILDING 366 ENVELOPE AND OTHER REPAIRS, HERLONG, CA
47PK1722F0071CONSTRUCTICON CORPGeneral Services Administration$3.23M
2022-09-012024-11-24236220LOW-RISE ELEVATOR 1-3 MODERNIZATION, PHILIP BURTON FEDERAL BUILDING, 450 GOLDEN GATE AVE, SAN FRANCISCO, CA
47PK1724F0004CONSTRUCTICON CORPGeneral Services Administration$2.59M
2023-10-112026-09-22236220AWARD OF THE DESIGN/BUILD CONSTRUCTION OF THE APPRAISERS BLDG ELEVATOR MOD PROJECT LOCATED AT 630 SANSOME STREET, SF, CA. THE SUBSTANTIAL COMPLETION IS DUE 520 CALENDAR DAYS AFTER AWARD.
47PK1724F0038CONSTRUCTICON CORPGeneral Services Administration$2.23M
2024-09-122025-09-24236220TASK ORDER AWARD OF THE DB SANSOME ST ROOF PROJECT LOCATED IN SF, CA. THE TOTAL PERIOD OF PERFORMANCE IS 324 CD AFTER NOTICE TO PROCEED.
47PK1725F0027CONSTRUCTICON CORPGeneral Services Administration$2.1M
2025-09-252027-02-27236220DESIGN BUILD R9 IDIQ REPAIR AND ALTERATION PROJECT- DELLUMS LOW RISE PASSENGER ELEVATOR MODERNIZATION TO BE PERFORMED AT RONALD V. DELLUMS FEDERAL BUILDING AND U.S. COURTHOUSE 1301 CLAY ST, OAKLAND, CA 94612
W9123815C0024CONSTRUCTICON CORPDepartment of Defense$2.01M
2015-09-292016-09-30236220IGF::OT::IGF BUILDINGS 353 AND 365 REPAIRS
W9123819C0046CONSTRUCTICON CORPDepartment of Defense$2.01M
2019-09-282020-12-15236220BUILDING REPAIRS AT SIERRA ARMY DEPOT
47PK1323F0011CONSTRUCTICON CORPGeneral Services Administration$1.99M
2023-08-302026-01-15236220OAKLAND FREIGHT ELEVATOR MODERNIZATION AT THE RONALD V. DELLUMS FEDERAL BUILDING, 1301 CLAY ST, OAKLAND, CA 94612.
0001CONSTRUCTICON CORPDepartment of Defense$1.98M
2016-09-302017-10-12236220IGF::OT::IGF W91238-16-D-0011 TASK ORDER 0001 BUILDING 365 ENVELOPE AND OTHER REPAIRS SIERRA ARMY DEPOT, HERLONG, CA
W912GY18C0002CONSTRUCTICON CORPDepartment of Defense$1.91M
2018-03-192019-08-20236210RPR FLOOR COVERINGS FOR MULTIPLE BUILDINGS: 51,74,79,150,201,207,520,671,672,143&145
47PK1322F0015CONSTRUCTICON CORPGeneral Services Administration$1.87M
2022-09-082024-06-30236220AWARD OF TASK ORDER FOR DESIGN BUILD CONSTRUCTION SERVICES OF THE NARA ELEVATOR MODERNIZATION PROJECT LOCATED AT 1000 COMMODORE ST, SAN BRUNO, CA. THE POP IS 240 CD AFTER AWARD.
W56HZV16C0224CONSTRUCTICON CORPDepartment of Defense$1.4M
2016-09-262017-09-28236210IGF::OT::IGF C-TYPE CONTRACT AWARDED TO CIC FOR THE BUILDING REPAIRS AT SIAD.
47PK1321F0011CONSTRUCTICON CORPGeneral Services Administration$1.25M
2021-08-032023-05-15236220REPLACEMENT OF UNDERGROUND STORAGE TANK (UST) AT THE RONALD V. DELLUMS FEDERAL BUILDING AND U.S. COURTHOUSE, 1301 CLAY STREET, OAKLAND, CA 94612-5217
47PK0121F0023CONSTRUCTICON CORPGeneral Services Administration$1.22M
2021-09-202022-12-19236220FIRE PUMP ROOM & FIRE RISERS 1221 NEVIN AVE SSA FRANK HAGEL FB RICHMOND, CA
W912GY15C0012CONSTRUCTICON CORPDepartment of Defense$1.18M
2015-09-302016-07-18238990IGF::OT::IGF REPAIR BLDG 27 EXTERIOR ENVELOPE- ELECTRICAL, MECHANICAL, SIDING, DOWNSPOUTS, GUTTERS, J-CHANNEL, CLADDING&INSULATION, PREP&PAINT; REPAIR ROOF 1600SF BLDG 142; REPAIR ROOF AND PARAPET, SHOWER FLOORS BLDG 143; REPAIR BATHROOMS, FLOORS AND ENTRY WAY BLDG 145; REPAIR BATHROOMS, KITCHEN, PAIN AND CEILING BLDG 146; REPAIR SNACK AREA- ELECTRICAL, HEATING/COOLING, WALL STUDS&DOORS, INSULATION, DRYWALL AND T-BAR CEILING, FIRE SUPPRESSION, ADA ENTRANCE, RAMP, DEMOLITION BLDG 58;PEST CONTROL BLDG 58; CONSTRUCT TOOL STORAGE AREA BLDG 53 DUTCH DOORS, RESTROOM RENOVATION ADA COMPLIANT, SINK, ROLL UP DOOR,FIRE SPRINKLER; REPAIR BEAM SUPPORT BLDG 53; UPGRADE BREAK ROOM BLDG 150- ELECTRICAL, FLOORING, CABINETS, CEILING
47PK0524F0148CONSTRUCTICON CORPGeneral Services Administration$1.18M
2024-06-202026-11-07236220COURTHOUSE HARDENING, ROBERT MATSUI COURTHOUSE, 501 I STREET, SACRAMENTO, CA
47PK1725F0022CONSTRUCTICON CORPGeneral Services Administration$1.11M
2025-07-282026-12-28236220AWARD OF 47PK1725F0022 - BROWNING FIRE ALARM REPLACEMENT
47PK1322F0013CONSTRUCTICON CORPGeneral Services Administration$1.06M
2022-08-312024-05-31236220AWARD OF DESIGN BUILD CONSTRUCTION SERVICES FOR THE PECKHAM UNDERGROUND STORAGE TANK PROJECT LOCATED IN SAN JOSE, CA. THE POP IS 210 CALENDAR DAYS UNTIL SUBSTANTIAL COMPLETION. ULTIMATE COMPLETION IS 30 DAYS LATER.
SP330019F1166CONSTRUCTICON CORPDepartment of Defense$921.99K
2019-09-172020-10-302362208506801094!REPLACEMENT OF ROOF OF BUILDI
47PK1724F0031CONSTRUCTICON CORPGeneral Services Administration$879.1K
2024-08-062025-08-31236220AWARD OF THE DESIGN BUILD CONSTRUCTION SERVICES TASK ORDER FOR THE COTTAGE WAY CHILLERS OVERHAUL PROJECT LOCATED IN SACRAMENTO, CA. THE PERIOD OF PERFORMANCE IS 160 CALENDAR DAYS FROM ISSUANCE OF THE NOTICE TO PROCEED.
47PK1323F0002CONSTRUCTICON CORPGeneral Services Administration$817.64K
2023-01-112025-05-31236220AWARD CONTRACT FOR THE DESIGN BUILD CONSTRUCTION OF THE BURTON CH HARDENING PROJECT LOCATED IN SF, CA 94102. THE PERIOD OF PERFORMANCE IS 180 CALENDAR DAYS FROM ISSUANCE OF THE NOTICE TO PROCEED.
SP330021F1180CONSTRUCTICON CORPDepartment of Defense$765K
2021-09-222022-09-102362208508503833!AC
47PK1320C0015CONSTRUCTICON CORPGeneral Services Administration$759.56K
2020-07-312022-03-23236220AWARD OF THE 9TH CIRCUIT COURT OF APPEALS SECURITY FENCE PROJECT LOCATED AT STEVENSON STREET, SF, CA 94102. THE PERIOD OF PERFORMANCE IS 120 CALENDAR DAYS AFTER ISSUANCE OF THE NOTICE TO PROCEED.