25 awards on this page · sorted by amount · page 1
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 47PK0123C0003 | CEBUANA CONSTRUCTION INC | General Services Administration | $12.84M | 2023-09-25 | 2026-01-24 | 236220 | "11000 WILSHIRE 24/7 HVAC", 11000 WILSHIRE FEDERAL BUILDING, LOS ANGELES, CA |
| 47PK1723C0020 | CEBUANA CONSTRUCTION INC | General Services Administration | $3.52M | 2023-09-01 | 2024-10-25 | 236220 | AWARD OF CONTRACT NO. 47PK1723C0020 "LOBBY ROOF REPLACEMENT" WILSHIRE FEDERAL BUILDING, 11000 WILSHIRE BLVD., LOS ANGELES, CA |
| 47PK1724C0017 | CEBUANA CONSTRUCTION INC | General Services Administration | $3.23M | 2024-09-09 | 2027-01-14 | 236220 | AWARD OF CONTRACT NO. 47PK1724C0017, "LONG BEACH ELEVATOR MODERNIZATION PHASE 1," GLENN M. ANDERSON FEDERAL BUILDING, 501 W. OCEAN BLVD., LONG BEACH, CA |
| 47PD5426C0001 | CEBUANA CONSTRUCTION INC | General Services Administration | $2.2M | 2025-12-10 | 2026-10-23 | 236220 | AWARD OF CONTRACT NO. 47PD5426C0001 - FBI CHILLER REPLACEMENT |
| W912PL25FA032 | CEBUANA CONSTRUCTION INC | Department of Defense | $2.06M | 2025-09-25 | 2027-03-20 | 236220 | POCA TASK ORDER TO CEBUANA CONSTRUCTION, INC FOR REPLACE MULTIPLE GENERATORS AT MARCH ARB |
| 1305M425C0028 | CEBUANA CONSTRUCTION INC | Department of Commerce | $1.6M | 2025-09-25 | 2027-03-31 | 238210 | THE EXISTING EPG SYSTEMS LOCATED AT THE WFO LOS ANGELES/OXNARD (LOX) AND THE WFO SAN JOAQUIN VALLEY / HANFORD LOCATION (HNX) HAVE SURPASSED THEIR LIFE EXPECTANCY WITH AVAILABILITY OF PARTS AND REPAIRS BECOMING INCREASINGLY DIFFICULT TO MAINTAIN. AT E |
| 47PK0523C0012 | CEBUANA CONSTRUCTION INC | General Services Administration | $1.48M | 2023-07-19 | 2024-02-24 | 236220 | VAN NUYS CHILLERS REPLACEMENT: JAMES CORMAN FEDERAL BUILDING - 6230 VAN NUYS BLVD, VAN NUYS, CA 91401 |
| 47PK1725C0001 | CEBUANA CONSTRUCTION INC | General Services Administration | $1.1M | 2024-10-21 | 2025-08-28 | 236220 | AWARD OF CONTRACT NO. 47PK1725C0001, VAN NUYS COOLING TOWER REPLACEMENT |
| 47PK1722C0031 | CEBUANA CONSTRUCTION INC | General Services Administration | $879.08K | 2022-08-01 | 2024-12-16 | 236220 | AWARD OF CONTRACT NO 47PK1722C0031, DESIGN BUILD ATS REPLACEMENT, WILSHIRE FEDERAL BUILDING, 11000 WILSHIRE BLVD., LOS ANGELES, CA |
| 47PK1723C0016 | CEBUANA CONSTRUCTION INC | General Services Administration | $679.65K | 2023-05-26 | 2024-06-23 | 236220 | CONTRACT 47PK1723C0016 IS FORDESIGN BUILD SERVICES FOR T1 ROOM RENOVATIONS FOR FBI AT WILSHIRE FEDERAL BUILDING11000 WILSHIRE BLVD, LOS ANGELES, CA 90024 |
| 47PK0724C0004 | CEBUANA CONSTRUCTION INC | General Services Administration | $249.1K | 2023-11-29 | 2024-12-31 | 236220 | DESIGN BUILD SERVICES FOR AN INTRUSION DETECTION SYSTEM AT THE PRINDLE SEIZED FACILITY AT 9020 AIRWAY ROAD, SAN DIEGO, CALIFORNIA. |
| 47PK0625C0008 | CEBUANA CONSTRUCTION INC | General Services Administration | $197.49K | 2025-07-02 | 2026-04-30 | 238990 | 350 W 1ST STREET ELECTRICAL POWER QUALITY STUDY, 350 W. 1ST ST., LOS ANGELES, CA. |
| 12905B22P0230 | CEBUANA CONSTRUCTION INC | Department of Agriculture | $176.13K | 2022-09-14 | 2022-12-23 | 237130 | REPLACEMENT OF TRANSFORMERS AND SWITCHES |
| 47PK0624C0031 | CEBUANA CONSTRUCTION INC | General Services Administration | $174.96K | 2024-08-07 | 2025-02-21 | 236220 | PASSPORT MINI SPLIT, 11000 WILSHIRE BLVD, LOS ANGELES, CA |
| 47PK1722C0034 | CEBUANA CONSTRUCTION INC | General Services Administration | $128.99K | 2022-10-03 | 2023-01-31 | 238210 | CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EXPERTISE AND SUPERVISION TO INSTALL AC UNIT INSTALLATION AT WILSHIRE FB, 11000 WILSHIRE BLVD., LOS ANGELES, CA |
| 47PK1823C0007 | CEBUANA CONSTRUCTION INC | General Services Administration | $122.04K | 2023-04-19 | 2023-12-15 | 238210 | CONTRACTOR TO PROVIDE LABOR AND MATERIALS TO INSTALL 2 DUAL EV CHARGING STATIONS AT THE RONALD REAGAN FEDERAL BUILDING AND UNITED STATES COURTHOUSE LOCATED AT 411 W 4TH ST., SANTA ANA, CA 92701 |
| 47PK0624C0026 | CEBUANA CONSTRUCTION INC | General Services Administration | $119.05K | 2024-04-26 | 2024-10-31 | 238210 | CHFB USCIS OIT TEMPORARY GENERATOR |
| 47PD5426C0003 | CEBUANA CONSTRUCTION INC | General Services Administration | $79.57K | 2026-03-03 | 2026-06-01 | 236220 | ASSESS AND TROUBLESHOOT THE MAIN SWITCH GEAR AND BUSDUCT. PROVIDE REPAIRS TO RESTORE POWER TO THE BUILDING AT LOS ANGELES FEDERAL COURTHOUSE. |
| 47PK0625C0009 | CEBUANA CONSTRUCTION INC | General Services Administration | $72.04K | 2025-07-28 | 2025-09-30 | 238210 | WLA FBI 17TH FL TRANSFORMER REPLACEMENT |
| 47PK0824C0001 | CEBUANA CONSTRUCTION INC | General Services Administration | $59.39K | 2024-01-22 | 2024-07-22 | 238220 | CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EXPERTISE AND SUPERVISION FOR THE MECHANICAL REPAIRS LOCATED AT LAFO, US PASSPORTS, 11000 WILSHIRE BLVD., LOS ANGELES, CA. |
| 47PK0625C0004 | CEBUANA CONSTRUCTION INC | General Services Administration | $54K | 2024-11-25 | 2025-11-01 | 238220 | WLA WILSHIRE GARAGE 2 TANKLESS WATER HEATERS, 11000 WILSHIRE BLVD., LOS ANGELES, CA |
| 47PK1820P0031 | CEBUANA CONSTRUCTION INC | General Services Administration | $30.05K | 2020-07-14 | 2020-11-29 | 238210 | CEBUANA CONSTRUCTION IS TO PROVIDE LABOR AND MATERIALS TO PROVIDE AND INSTALL RELOCATE THE SERVER ROOM UPS WIRES FROM A AND B. WORK TO TAKE PLACE AT CHFB |
| 47PK1723C0008 | CEBUANA CONSTRUCTION INC | General Services Administration | $26.24K | 2023-02-15 | 2023-03-31 | 236220 | CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS AND EXPERTISE FOR WILSHIRE FB EXCAVATION FOR WATERPROOFING STUDY LOCATED AT WILSHIRE FB, 11000 WILSHIRE BLVD., LOS ANGELES, CA 90024. |
| 47PK1819P0001 | CEBUANA CONSTRUCTION INC | General Services Administration | $25.58K | 2018-10-16 | 2019-06-17 | 238320 | PROVIDE ALL NECESSARY SUPERVISION COORDINATION PLANNING LABOR AND MATERIALS TO ACCOMPLISH THE FOLLOWING A. MEETING ROOM 3110 1. MOVE EXISTING OFFICE FURNITURE AND PLACE IN STORAGE DESIGNATED BY U.S. TRUSTEES. OFFICE FURNITURE WILL BE MOVED BACKED TO ROOM 3110 AT THE COMPLETION OF WORK. 2. PATCH AND REPAIR DRYWALL TO INCLUDE HOLES DENTS AND TEARS. TOUCH UP WALLS AS REQUIRED. 3. PAINT ALL INTERIOR WALLS LOCATED IN MEETING ROOM. SURFACE WILL INCLUDE PREP PRIMER AND TWO COATS OF PAINT. COLOR TO BE MATCHED WITH EXISTING BUILDING STANDARD. 4. REMOVE EXISTING BASEBOARDS IN MEETING ROOMS. FURNISH AND INSTALL NEW COVE BASE TO MATCH COLOR AND SPECIFICATION OF EXISTING BUILDING STANDARD. 5. REMOVE AND DISPOSE OF EXISTING CARPET TILE IN MEETING ROOM. 6. REPLACE CARPET TILE WITH THE FOLLOWING SPECIFICATION A. MANUFACTURER SHAW B. STYLE NAME TECHNIQUE TILE C. STYLE NUMBER 5T022 D. COLOR NAME MAPLE E. COLOR NUMBER 22761 F. TUFTED WEIGHT 34.00 OZ. G. CONSTRUCTION MULTI LEVEL PATTERN CUT LOOP 7. INSTALL CHAIR RAILS ON ALL EXISTING INTERIOR WALLS AT 30IN HEIGHT WITH THE FOLLOWING THE SPECIFICATION PAGE 2 OF 2 8. PROPERLY DISASSEMBLE AND REMOVE WALL FIXTURES FOR THE INSTALLATION OF CHAIR RAILS. WALL FIXTURES WILL BE RELOCATED IN CLOSE VICINITY OF ORIGINAL LOCATION. |
| 47PK1819P0008 | CEBUANA CONSTRUCTION INC | General Services Administration | $24.92K | 2019-02-25 | 2019-06-26 | 238210 | PROVIDE UPGRADED OR ENHANCED LED LIGHTING AT THE FIRST AND SECOND FLOOR LOADING DOCK. 2. INCLUDE ALL ELECTRICAL WIRING, TERMINATIONS, LOW VOLTAGE CABLING, SAFETY DEVICES, ETC FOR A COMPLETE OPERATIONAL SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR EXTENDING POWER TO ALL REQUIRED COMPONENTS. 3. CONTRACTOR SHALL SUPPLY ALL REQUIRED MISCELLANEOUS AND INCIDENTAL EQUIPMENT, INCLUDING WIRE, NUTS, BOLTS, ANCHORS, SUPPORTS, CLIPS, SHIMS, AND OTHER REQUIREMENTS FOR INSTALLATION. 4. THE CONTRACTOR TO FIND THE MOST COST EFFECTIVE AND ENERGY EFFICIENT LIGHT SOURCE. 5. PATCH AND REPAIR ALL AREAS AFFECTED BY WORK. PER THE RFP DATED: FEBRUARY 1, 2019 AMENDMENT NO. 1&AMENDMENT NO. 2 |