Awards for “boeing”
25 awards on this page · sorted by amount · page 93
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0125 | BELL BOEING JOINT PROJECT OFFICE | Department of Defense | $14.93M | 2011-02-07 | 2023-03-31 | 541330 | NON RECURRING ENGINEERING (NRE) FOR 13 HARNESS |
| FA868124FB062 | THE BOEING COMPANY | Department of Defense | $14.92M | 2024-09-30 | 2027-09-01 | 332993 | MOP GBU-57 WEAPON SYSTEM COMPONENT TEST ASSET REPLENISHMENT (TAR) WITHOUT TAIL-KITS |
| 0012 | THE BOEING COMPANY (0674) | Department of Defense | $14.89M | 2008-06-25 | 2011-09-30 | 336413 | "I" AND "O" LEVEL PECULIAR SUPPORT EQUIPMENT |
| 0095 | THE BOEING COMPANY | Department of Defense | $14.88M | 2007-09-25 | 2020-09-30 | 336411 | DELIVERY ORDER 0095 CMB |
| N0001923F0523 | INSITU, INC. | Department of Defense | $14.86M | 2023-07-07 | 2024-10-30 | 541330 | SCANEAGLE SPARES, AVS, SITE PREP AND ACTIVATION IN SUPPORT OF IRAQ BPC CASE NV-P-LB. |
| FA821423F0001 | THE BOEING COMPANY | Department of Defense | $14.83M | 2023-02-02 | 2024-02-01 | 541330 | GUIDANCE SUBSYSTEM SUSTAINMENT CONTRACT (GUSSC 2.0) - 2023 TASK ORDER |
| TH20 | THE BOEING COMPANY | Department of Defense | $14.81M | 2012-09-20 | 2015-04-08 | 334519 | STABILIZER,HORIZONT |
| 2063 | THE BOEING COMPANY | Department of Defense | $14.81M | 2015-09-16 | 2017-09-30 | 336411 | ECP AFT FUSELAGE |
| FA852623F0008 | THE BOEING COMPANY | Department of Defense | $14.8M | 2023-09-30 | 2026-09-30 | 336411 | FY23 MATERIAL IMPROVEMENT PROGRAM MATERIAL |
| 865W | THE BOEING COMPANY | Department of Defense | $14.79M | 2013-04-19 | 2019-01-31 | 336413 | 8500185105!SUPPORT,STRUCTURAL |
| 0009 | THE BOEING COMPANY | Department of Defense | $14.77M | 2012-03-14 | 2014-10-31 | 336414 | OPTION PRICING FOR TEST KITS |
| W58RGZ23F0480 | THE BOEING COMPANY | Department of Defense | $14.76M | 2023-10-01 | 2024-03-31 | 336413 | PERFORMANCE BASED LOGISTICS SUPPORT FOR THE H-47 HELICOPTER FORWARD AND AFT BLADES AND ASSOCIATED CONTAINERS. |
| N6134019F0167 | THE BOEING COMPANY | Department of Defense | $14.76M | 2019-09-25 | 2021-11-30 | 333318 | THIS EFFORT IS FOR THE FY17 UPGRADES TO BE MADE TO THE EXISTING F/A-18E/F INTEGRATED VISUAL ENVIRONMENT MAINTENANCE TRAINERS (IVEMTS) AT CNATT UNITS OCEANA, VA., LEMOORE, CA. AND EA-18G IVEMT + G AT WHIDBEY ISLAND. |
| FA810721F5001 | THE BOEING COMPANY | Department of Defense | $14.75M | 2021-01-01 | 2021-12-31 | 336411 | RECURRING TASK ORDER FOR B52 ENGINEERING SERVICES. |
| 0015 | THE BOEING COMPANY (0674) | Department of Defense | $14.73M | 2013-09-19 | 2022-06-30 | 334511 | NAVY AVIATION |
| 0018 | THE BOEING COMPANY | Department of Defense | $14.72M | 2011-09-11 | 2012-04-30 | 541330 | UAS ISR SERVICES |
| SD07 | THE BOEING COMPANY | Department of Defense | $14.72M | 2015-09-29 | 2019-01-25 | 336411 | B-52 LOW RATE INITIAL PRODUCTION AND FULL RATE PRODUCTION |
| M0014605C9004 | BOEING AEROSPACE OPERATIONS, I | Department of Defense | $14.72M | 2005-01-06 | 2009-01-29 | 488190 | 200512!150064!1700!M00146!RECEIVING OFFICER !M0014605C9004 !A!N! !N! ! !20050106!20060201!194293544!085188316!009256819!N!BOEING AEROSPACE OPERATIONS, I!2601 LIBERTY PKWY !MIDWEST CITY !OK!73110!00000! !IZ!* !* !IRAQ !+000003919283!N!N!000013977973!J015!MAINT & REPAIR OF EQ/AIRCRAFT STRUCTURAL COMPS !S1 !SERVICES !000 !* !488190!E! !3! ! ! ! ! !20200930!B! ! !A! !D!U!Y!1!001!N!1A!Z!Y!Z! ! !N!M!N! ! ! ! ! !A!A!000!A!B!N! ! !Y!Y!1727!V09167!0001! ! |
| 0011 | THE BOEING COMPANY | Department of Defense | $14.7M | 2014-07-17 | 2019-06-30 | 336411 | IFG:OT:IFG AIRCRAFT MODE 5 MATERIAL |
| NNL11AA68T | THE BOEING COMPANY | National Aeronautics and Space Administration | $14.7M | 2011-05-17 | 2015-08-31 | 541712 | SMAAART TASK ORDER: STATEMENT OF WORK (SOW.) TASK TITLE: HWB MULTI BAY TEST ARTICLE ANALYSIS AND ASSEMBLY 1.0 INTRODUCTION/BACKGROUND: NASA CREATED THE ENVIRONMENTALLY RESPONSIBLE AVIATION (ERA) PROJECT TO EXPLORE AND DOCUMENT THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES THAT WILL REDUCE THE IMPACT OF AVIATION ON THE ENVIRONMENT. TODAY'S CURRENT GENERATION OF AIRCRAFT HAS BENEFITTED FROM NASA INVESTMENTS IN AERONAUTICAL RESEARCH THAT HAVE IMPROVED FUEL EFFICIENCIES, LOWERED NOISE LEVELS, AND LESSENED HARMFUL EMISSIONS. ALTHOUGH SUBSTANTIAL PROGRESS HAS BEEN MADE, MUCH MORE NEEDS TO BE DONE. THE NATION'S AIR TRANSPORTATION SYSTEM WILL EXPAND BY A FACTOR OF TWO OR THREE WITHIN THE NEXT TWO DECADES, POTENTIALLY INCREASING AVIATION'S CONTRIBUTION TO CLIMATE CHANGE. THE ERA PROJECT WORKS TO REDUCE THE ENVIRONMENTAL HARM THAT COULD RESULT FROM SUCH AN EXPANSION. AMONG THE TECHNOLOGIES TO BE EXPLORED IN THE ERA PROJECT ARE THE FOLLOWING: UNCONVENTIONAL AIRCRAFT CONFIGURATIONS THAT HAVE HIGHER LIFT TO DRAG RATIO, REDUCED DRAG AND REDUCED COMMUNITY NOISE; DRAG REDUCTION THROUGH LAMINAR FLOW; ADVANCED COMPOSITE STRUCTURAL CONCEPTS FOR WEIGHT REDUCTION; LOW NOX COMBUSTORS; AND PROPULSION AND AIRFRAME INTEGRATION FOR NOISE REDUCTION AND FUEL-BURN IMPROVEMENTS. THE ERA PROJECT WILL FOCUS ON ENVIRONMENTAL ISSUES ASSOCIATED WITH AIRCRAFT, INCLUDING FUEL BURN, EMISSIONS, AND NOISE. THE PROJECT WILL EXPLORE AND DOCUMENT THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES IDENTIFIED TO HAVE THE POTENTIAL TO MITIGATE THE IMPACT OF AVIATION ON THE ENVIRONMENT. THIS RESEARCH DIRECTLY SUPPORTS THE NATIONAL AERONAUTICS RESEARCH AND DEVELOPMENT POLICY TO DEVELOP APPROPRIATE ENVIRONMENTAL PROTECTION MEASURES TO ENSURE CONTINUED GROWTH IN AIR TRANSPORTATION. THE PRIMARY STRUCTURAL CONCEPT BEING DEVELOPED UNDER THE ERA PROGRAM IN THE AIRFRAME TECHNOLOGY ELEMENT IS THE PULTRUDED ROD STITCHED EFFICIENT UNITIZED STRUCTURE (PRSEUS) DESIGN. THE PRSEUS DESIGN APPROACH IS PART OF THE ERA EFFORT TO ADDRESS FUEL BURN (C02 EMISSIONS) BY REDUCING THE WEIGHT OF ADVANCED STRUCTURES. REDUCING FUEL BURN REDUCES THE NEED TO USE RESOURCES AND REDUCES POLLUTION TO THE ENVIRONMENT. THE APPROACH MOVES FROM SAFE-LIFE TO FAIL-SAFE DESIGN WITH A LIGHTWEIGHT COMPOSITE STRUCTURE. PRSEUS REPRESENTS A NEW CONCEPT IN COMPOSITE DESIGN THEORY AND MANUFACTURING METHODS. IT IS A CONSCIOUS PROGRESSION AWAY FROM CONVENTIONAL LAMINATED AND BONDED ASSEMBLIES TOWARD LARGER ONE-PIECE PANEL DESIGNS WITH SEAMLESS TRANSITIONS AND DAMAGE-ARREST INTERFACES SUCH AS STITCH ROWS AND TEAR STRAPS. IT FOCUSES ON A NEW STRUCTURAL CONCEPT THAT INTEGRATES SKIN, STRINGERS, AND FRAME ELEMENTS INTO A SINGLE LARGE PANEL IN WHICH ALL ELEMENTS ARE SIMULTANEOUSLY CURED (OR CO-CURED) IN ONE HIGH-TEMPERATURE CURE CYCLE. THE RESULTING STRUCTURE IS A NOVEL SOLUTION FOR ADDRESSING THE DEMANDING FUSELAGE LOADING REQUIREMENTS INHERENT IN A PRESSURIZED SHAPED VEHICLE LIKE THE HYBRID WING BODY (HWB) OR BLENDED WING BODY (BWB) CONCEPT. THE PRSEUS CONCEPT BUILDS UPON, EXTENDS, AND TAILORS THESE STRUCTURAL TECHNOLOGIES IN ORDER TO MEET THE DEMANDING CHALLENGES ASSOCIATED WITH VEHICLES WITH SHAPES AND LOAD PATHS DIFFERENT FROM TODAY S TRADITIONAL WING AND CIRCULAR FUSELAGE STRUCTURES. HAVING DEMONSTRATED THE UNIQUE CAPABILITY OF THE HYBRID WING BODY (HWB) PULTRUDED ROD STITCHED EFFICIENT UNITIZED STRUCTURE (PRSEUS) STRUCTURAL CONCEPT TO ECONOMICALLY PRODUCE LARGE INTEGRATED STRUCTURAL PANELS, THE PRIMARY AIRFRAME DESIGN CHALLENGE NOW BECOMES THE VALIDATION OF THE STRUCTURAL PERFORMANCE IN THE COMBINED LOADING ENVIRONMENT OF THE HWB PRESSURE SHELL. UNDER THESE CONDITIONS, SKIN PANELS MUST NOT ONLY HAVE CONTINUOUS LOAD PATHS IN BOTH DIRECTIONS (I.E., NX AND NY), THEY MUST ALSO BE EFFECTIVE IN TRANSMITTING INTERNAL PRESSURE LOADS (I.E., NZ) FOR THE NEAR-FLAT PANEL GEOMETRY. DEMONSTRATION OF THIS CAP |
| FA865019F2413 | THE BOEING COMPANY | Department of Defense | $14.7M | 2019-01-30 | 2025-12-01 | 541712 | IGF::OT::IGF BOEING LOCKHEED OR NORTHROP DEMONSTRATION INCLUDING ENGINE |
| 0019 | THE BOEING COMPANY | Department of Defense | $14.7M | 2011-09-11 | 2012-04-30 | 541330 | UAS ISR SERVICES |
| N0001923F2630 | THE BOEING COMPANY | Department of Defense | $14.7M | 2023-08-21 | 2028-06-01 | 336412 | EN JOINT COMMON TEST SET |
| 0001 | THE BOEING COMPANY | Department of Defense | $14.69M | 2012-09-28 | 2023-06-30 | 541712 | IGF::OT::IGF EATTS3 TASK ORDER 0001 AH 64D PRIORITY PARTS FATIGUE TESTING - PHASE II |
| 0387 | THE BOEING COMPANY | Department of Defense | $14.69M | 2015-07-16 | 2018-07-31 | 336411 | ECP 6460 "AESA MULTI-MODULE REDESIGN" |