FedTALLY

Awards for “THE BOEING COMPANY

25 awards on this page · sorted by amount · page 85

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
FA852623F0008THE BOEING COMPANYDepartment of Defense$14.8M
2023-09-302026-09-30336411FY23 MATERIAL IMPROVEMENT PROGRAM MATERIAL
865WTHE BOEING COMPANYDepartment of Defense$14.79M
2013-04-192019-01-313364138500185105!SUPPORT,STRUCTURAL
0009THE BOEING COMPANYDepartment of Defense$14.77M
2012-03-142014-10-31336414OPTION PRICING FOR TEST KITS
W58RGZ23F0480THE BOEING COMPANYDepartment of Defense$14.76M
2023-10-012024-03-31336413PERFORMANCE BASED LOGISTICS SUPPORT FOR THE H-47 HELICOPTER FORWARD AND AFT BLADES AND ASSOCIATED CONTAINERS.
N6134019F0167THE BOEING COMPANYDepartment of Defense$14.76M
2019-09-252021-11-30333318THIS EFFORT IS FOR THE FY17 UPGRADES TO BE MADE TO THE EXISTING F/A-18E/F INTEGRATED VISUAL ENVIRONMENT MAINTENANCE TRAINERS (IVEMTS) AT CNATT UNITS OCEANA, VA., LEMOORE, CA. AND EA-18G IVEMT + G AT WHIDBEY ISLAND.
FA810721F5001THE BOEING COMPANYDepartment of Defense$14.75M
2021-01-012021-12-31336411RECURRING TASK ORDER FOR B52 ENGINEERING SERVICES.
0015THE BOEING COMPANY (0674)Department of Defense$14.73M
2013-09-192022-06-30334511NAVY AVIATION
0018THE BOEING COMPANYDepartment of Defense$14.72M
2011-09-112012-04-30541330UAS ISR SERVICES
SD07THE BOEING COMPANYDepartment of Defense$14.72M
2015-09-292019-01-25336411B-52 LOW RATE INITIAL PRODUCTION AND FULL RATE PRODUCTION
0011THE BOEING COMPANYDepartment of Defense$14.7M
2014-07-172019-06-30336411IFG:OT:IFG AIRCRAFT MODE 5 MATERIAL
NNL11AA68TTHE BOEING COMPANYNational Aeronautics and Space Administration$14.7M
2011-05-172015-08-31541712SMAAART TASK ORDER: STATEMENT OF WORK (SOW.) TASK TITLE: HWB MULTI BAY TEST ARTICLE ANALYSIS AND ASSEMBLY 1.0 INTRODUCTION/BACKGROUND: NASA CREATED THE ENVIRONMENTALLY RESPONSIBLE AVIATION (ERA) PROJECT TO EXPLORE AND DOCUMENT THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES THAT WILL REDUCE THE IMPACT OF AVIATION ON THE ENVIRONMENT. TODAY'S CURRENT GENERATION OF AIRCRAFT HAS BENEFITTED FROM NASA INVESTMENTS IN AERONAUTICAL RESEARCH THAT HAVE IMPROVED FUEL EFFICIENCIES, LOWERED NOISE LEVELS, AND LESSENED HARMFUL EMISSIONS. ALTHOUGH SUBSTANTIAL PROGRESS HAS BEEN MADE, MUCH MORE NEEDS TO BE DONE. THE NATION'S AIR TRANSPORTATION SYSTEM WILL EXPAND BY A FACTOR OF TWO OR THREE WITHIN THE NEXT TWO DECADES, POTENTIALLY INCREASING AVIATION'S CONTRIBUTION TO CLIMATE CHANGE. THE ERA PROJECT WORKS TO REDUCE THE ENVIRONMENTAL HARM THAT COULD RESULT FROM SUCH AN EXPANSION. AMONG THE TECHNOLOGIES TO BE EXPLORED IN THE ERA PROJECT ARE THE FOLLOWING: UNCONVENTIONAL AIRCRAFT CONFIGURATIONS THAT HAVE HIGHER LIFT TO DRAG RATIO, REDUCED DRAG AND REDUCED COMMUNITY NOISE; DRAG REDUCTION THROUGH LAMINAR FLOW; ADVANCED COMPOSITE STRUCTURAL CONCEPTS FOR WEIGHT REDUCTION; LOW NOX COMBUSTORS; AND PROPULSION AND AIRFRAME INTEGRATION FOR NOISE REDUCTION AND FUEL-BURN IMPROVEMENTS. THE ERA PROJECT WILL FOCUS ON ENVIRONMENTAL ISSUES ASSOCIATED WITH AIRCRAFT, INCLUDING FUEL BURN, EMISSIONS, AND NOISE. THE PROJECT WILL EXPLORE AND DOCUMENT THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES IDENTIFIED TO HAVE THE POTENTIAL TO MITIGATE THE IMPACT OF AVIATION ON THE ENVIRONMENT. THIS RESEARCH DIRECTLY SUPPORTS THE NATIONAL AERONAUTICS RESEARCH AND DEVELOPMENT POLICY TO DEVELOP APPROPRIATE ENVIRONMENTAL PROTECTION MEASURES TO ENSURE CONTINUED GROWTH IN AIR TRANSPORTATION. THE PRIMARY STRUCTURAL CONCEPT BEING DEVELOPED UNDER THE ERA PROGRAM IN THE AIRFRAME TECHNOLOGY ELEMENT IS THE PULTRUDED ROD STITCHED EFFICIENT UNITIZED STRUCTURE (PRSEUS) DESIGN. THE PRSEUS DESIGN APPROACH IS PART OF THE ERA EFFORT TO ADDRESS FUEL BURN (C02 EMISSIONS) BY REDUCING THE WEIGHT OF ADVANCED STRUCTURES. REDUCING FUEL BURN REDUCES THE NEED TO USE RESOURCES AND REDUCES POLLUTION TO THE ENVIRONMENT. THE APPROACH MOVES FROM SAFE-LIFE TO FAIL-SAFE DESIGN WITH A LIGHTWEIGHT COMPOSITE STRUCTURE. PRSEUS REPRESENTS A NEW CONCEPT IN COMPOSITE DESIGN THEORY AND MANUFACTURING METHODS. IT IS A CONSCIOUS PROGRESSION AWAY FROM CONVENTIONAL LAMINATED AND BONDED ASSEMBLIES TOWARD LARGER ONE-PIECE PANEL DESIGNS WITH SEAMLESS TRANSITIONS AND DAMAGE-ARREST INTERFACES SUCH AS STITCH ROWS AND TEAR STRAPS. IT FOCUSES ON A NEW STRUCTURAL CONCEPT THAT INTEGRATES SKIN, STRINGERS, AND FRAME ELEMENTS INTO A SINGLE LARGE PANEL IN WHICH ALL ELEMENTS ARE SIMULTANEOUSLY CURED (OR CO-CURED) IN ONE HIGH-TEMPERATURE CURE CYCLE. THE RESULTING STRUCTURE IS A NOVEL SOLUTION FOR ADDRESSING THE DEMANDING FUSELAGE LOADING REQUIREMENTS INHERENT IN A PRESSURIZED SHAPED VEHICLE LIKE THE HYBRID WING BODY (HWB) OR BLENDED WING BODY (BWB) CONCEPT. THE PRSEUS CONCEPT BUILDS UPON, EXTENDS, AND TAILORS THESE STRUCTURAL TECHNOLOGIES IN ORDER TO MEET THE DEMANDING CHALLENGES ASSOCIATED WITH VEHICLES WITH SHAPES AND LOAD PATHS DIFFERENT FROM TODAY S TRADITIONAL WING AND CIRCULAR FUSELAGE STRUCTURES. HAVING DEMONSTRATED THE UNIQUE CAPABILITY OF THE HYBRID WING BODY (HWB) PULTRUDED ROD STITCHED EFFICIENT UNITIZED STRUCTURE (PRSEUS) STRUCTURAL CONCEPT TO ECONOMICALLY PRODUCE LARGE INTEGRATED STRUCTURAL PANELS, THE PRIMARY AIRFRAME DESIGN CHALLENGE NOW BECOMES THE VALIDATION OF THE STRUCTURAL PERFORMANCE IN THE COMBINED LOADING ENVIRONMENT OF THE HWB PRESSURE SHELL. UNDER THESE CONDITIONS, SKIN PANELS MUST NOT ONLY HAVE CONTINUOUS LOAD PATHS IN BOTH DIRECTIONS (I.E., NX AND NY), THEY MUST ALSO BE EFFECTIVE IN TRANSMITTING INTERNAL PRESSURE LOADS (I.E., NZ) FOR THE NEAR-FLAT PANEL GEOMETRY. DEMONSTRATION OF THIS CAP
FA865019F2413THE BOEING COMPANYDepartment of Defense$14.7M
2019-01-302025-12-01541712IGF::OT::IGF BOEING LOCKHEED OR NORTHROP DEMONSTRATION INCLUDING ENGINE
0019THE BOEING COMPANYDepartment of Defense$14.7M
2011-09-112012-04-30541330UAS ISR SERVICES
N0001923F2630THE BOEING COMPANYDepartment of Defense$14.7M
2023-08-212028-06-01336412EN JOINT COMMON TEST SET
0001THE BOEING COMPANYDepartment of Defense$14.69M
2012-09-282023-06-30541712IGF::OT::IGF EATTS3 TASK ORDER 0001 AH 64D PRIORITY PARTS FATIGUE TESTING - PHASE II
0387THE BOEING COMPANYDepartment of Defense$14.69M
2015-07-162018-07-31336411ECP 6460 "AESA MULTI-MODULE REDESIGN"
0009THE BOEING COMPANYDepartment of Defense$14.69M
2010-02-232011-11-30334511JDAM PRODUCTION
FA821324F0002THE BOEING COMPANYDepartment of Defense$14.69M
2023-12-012026-11-30541330UPGRADE CURRENT JDAM OPERATIONAL FLIGHT PROGRAM (OFP) SOFTWARE TO BECOME JDAM BLOCK 14 OFP RELEASE
FA821426FB007THE BOEING COMPANYDepartment of Defense$14.65M
2026-02-022027-02-01541330ENGINEERING SUPPORT FOR MINUTEMAN III MISSILE
0005THE BOEING COMPANYDepartment of Defense$14.63M
2010-05-182011-02-11334511MINIEODBOT
0002THE BOEING COMPANYDepartment of Defense$14.63M
2008-08-052009-09-01541712COST PLUS INCENTIVE FEE CONTRACT TYPE
FA810722F5001THE BOEING COMPANYDepartment of Defense$14.63M
2022-01-012022-12-31336411B-52 ENGINEERING SERVICES
N0001913C0019THE BOEING COMPANYDepartment of Defense$14.62M
2012-12-202016-05-31336414HARPOON SHIPBOARD COMMAND AND LAUNCH
FA300218F0101THE BOEING COMPANYDepartment of Defense$14.58M
2018-05-012019-08-06611519FMS RSAF F-15SA OEM TRAINING - OCONUS
0089THE BOEING COMPANYDepartment of Defense$14.58M
2010-01-142013-10-30541330POST PRODUCTION SUST