Award search
Awards for “CORNELL TECHNICAL SERVICES LLC”
25 awards on this page · sorted by amount · page 7
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 80LARC24F0025 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $207.72K | 2024-07-10 | 2025-09-30 | 541715 | THE IMPACT OF THE SPECTRUM PROCESS ON ANNOUNCEMENT OF OPPORTUNITY (AO) SPACE MISSION DESIGN AND TECHNICAL, MANAGEMENT, AND COST (TMC) EVALUATION |
| 80LARC18F0020 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $205.9K | 2017-12-07 | 2020-09-23 | 541712 | MARS 2020(M2020) STANDING REVIEW BOARDS (SRB) FOR SUPPORT AND ASSOCIATED ACTIVITIES. |
| 80LARC18F0055 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $201.96K | 2018-03-08 | 2020-09-23 | 541712 | SURFACE WATER AND OCEAN TOPOGRAPHY PROJECT STANDING REVIEW BOARD SUPPORT IN CONDUCTING LIFE CYCLE REVIEWS , PREPARE REVIEW DOCUMENTS, PRESENTATIONS, ATTEND SUBSYSTEM REVIEWS AS AN OBSERVER, AND COMPLETE ALL REQUESTED MANAGEMENT OUT-BRIEFS. |
| 80LARC21F0018 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $199.95K | 2020-11-05 | 2023-02-28 | 541715 | THE SUBJECT TASK ORDER IS TO SUPPORT THE SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) STANDING REVIEW BOARD (SRB) IN CONDUCTING SWOT LIFE-CYCLE REVIEWS |
| 80LARC19F0149 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $197.22K | 2019-09-16 | 2020-09-30 | 541712 | INTERNATIONAL SPACE STATION ISS COOPERATIVE AGREEMENT INDEPENDENT REVIEW TEAM |
| NNL13AB84T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $194.49K | 2013-08-12 | 2016-03-31 | 541712 | "IGF::OT::IGF" OTHER FUNCTIONS: TASK ORDER TITLE: TECHNICAL MANAGEMENT COST REVIEW INSTRUMENT AND MISSION TECHNICAL REVIEW SUPPORT PURPOSE: THE CONTRACTOR SHALL SUPPORT THE NASA SOMA BY ATTENDING DESIGN REVIEW MEETINGS (SYSTEM REQUIREMENTS REVIEW (SRR), PRELIMINARY DESIGN REVIEW (PDR), CRITICAL DESIGN REVIEW (CDR)) FOR SELECT SOMA TECHNICAL, MANAGEMENT, AND COST (TMC) EVALUATED MISSIONS AND INSTRUMENTS. THE TASK INCLUDES ATTENDING DESIGN REVIEWS, REPORTING COST AND TECHNICAL PERFORMANCE VERSUS THE TMC ESTIMATES, REPORTING ON TECHNICAL PROBLEMS, ASSESSING WHETHER TMC REPORTED RISKS WERE RESOLVED BY THE PROJECT, DETERMINING IF THERE ARE NEW RISKS THAT WERE NOT IDENTIFIED BY THE TMC AND, IF SO, WHETHER THE TMC COULD HAVE IDENTIFIED THEM DURING THE EVALUATION AND HOW THEY COULD HAVE BEEN IDENTIFIED. |
| 80LARC20F0007 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $193.13K | 2019-11-06 | 2020-04-30 | 541712 | INDEPENDENT EXTERNAL REVIEW OF THE NASA ASTROPHYSICS DATA ARCHIVES |
| 80LARC19F0128 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $191.49K | 2019-08-26 | 2021-07-31 | 541712 | SPECTRO-PHOTOMETER FOR THE HISTORY OF THE UNIVERSE EPOCH OF REIONIZATION AND ICES EXPLORER (SPHEREX) STANDING REVIEW BOARD (SRB) CHAIR MEMBER |
| 80LARC21F0094 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $182.74K | 2021-04-14 | 2021-07-30 | 541715 | REQUIREMENTS IDENTIFICATION FOR SIMPLIFIED STANDARD ANNOUNCEMENT OF OPPORTUNITY TEMPLATE (SSAOT) DEVELOPMENT AND MISSIONS OF OPPORTUNITY (MOS) SIMPLIFICATION |
| 80LARC20F0014 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $179.88K | 2019-12-04 | 2020-10-31 | 541712 | MARS ARCHITECTURE STRATEGY WORKING GROUP |
| 80LARC21F0068 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $179.38K | 2021-01-19 | 2025-09-30 | 541715 | SMALL INNOVATIVE MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) STANDING REVIEW BOARD (SRB) SUPPORT |
| 80LARC23F0020 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $175.23K | 2023-03-27 | 2025-03-31 | 541715 | SPECTRO-PHOTOMETER FOR THE HISTORY OF THE UNIVERSE, EPOCH OF REIONIZATION AND ICES EXPLORER (SPHEREX) STANDING REVIEW BOARD (SRB) SUPPORT |
| NNL15AA00T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $172.94K | 2014-11-21 | 2016-03-31 | 541712 | "IGF::OT::IGF" TASK ORDER TITLE EVALUATION OF HANDS-ON PROJECT EXPERIENCE (HOPE) 2015 PROPOSALS THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE TECHNICAL EXPERTISE TO THE SCIENCE OFFICE OF MISSION ASSESSMENTS (SOMA) AT NASA/LARC TO ASSIST SOMA IN THE EVALUATION OF HANDS-ON PROJECT EXPERIENCE (HOPE) PROPOSALS. CTS S TECHNICAL SUPPORT WILL INCLUDE PARTICIPATION BY CTS STAFF AND EXPERT CONSULTANTS. |
| NNL16AA17T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $169.67K | 2016-04-13 | 2016-09-30 | 541712 | "IGF::OT::IGF" STRATOSPHERIC OBSERVATORY FOR INFRARED ASTRONOMY (SOFIA) SCIENCE INSTRUMENT CONCEPT STUDY REPORTS (CSRS) TECHNICAL, MANAGEMENT, AND COST (TMC) EVALUATION THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE TECHNICAL EXPERTISE AND ADMINISTRATIVE SUPPORT TO THE NASA SCIENCE OFFICE FOR MISSION ASSESSMENTS (SOMA) (LOCATED AT NASA LARC) ON THE TMC FEASIBILITY OF THE INSTRUMENT, INCLUDING COST RISK EVALUATION OF CSRS SUBMITTED AS A RESULT OF THE SOFIA THIRD GENERATION SCIENCE INSTRUMENT SOLICITATION. FOR EACH CSR EVALUATED, THE CONTRACTOR SHALL PROVIDE THREE FORMS. THE FORMS THAT SHALL BE PROVIDED ARE: AN EVALUATION FORM FOR THE SCIENCE IMPLEMENTATION MERIT AND FEASIBILITY OF THE INVESTIGATION (FORM B), AN EVALUATION FORM FOR THE FEASIBILITY OF THE MISSION IMPLEMENTATION INCLUDING COST RISK (FORM C), AND AN EVALUATION FORM FOR THE COST RISK (COST EVALUATION SUMMARY [CES]). THE CONTRACTOR SHALL PERFORM ONE INDEPENDENT COST ESTIMATE FOR EACH CSR. |
| NNL17AA14T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $169.55K | 2017-03-17 | 2018-08-07 | 541712 | "IGF::OT::IGF: TASK ORDER TITLE: COST AND SCHEDULE EVALUATION SUPPORT EARTH SYSTEM SCIENCE PATHFINDER OFFICE (ESSPO) THE PURPOSE OF THIS TASK IS TO PROVIDE SUPPORT FOR THE PROGRAMMATIC COST AND SCHEDULE ASSESSMENTS FOR EARTH SYSTEM SCIENCE PATHFINDER OFFICE (ESSPO) AND OTHER EARTH SCIENCES DIRECTORATE (ESD) MISSIONS. |
| 80LARC17F0011 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $167.47K | 2017-07-12 | 2020-12-30 | 541712 | IGF::OT::IGFPRINCIPAL INVESTIGATOR (PI) MASTERS FORUM WORKSHOPS 2017: THE MASTERS FORUM WORKSHOP CONCEPT INCLUDES HAVING RECENT PIS, PROJECT MANAGERS (PM), PROJECT SYSTEM ENGINEERS (PSE) OR OTHER KEY LEADERS OF RECENT PAST SUCCESSFUL SMD MISSIONS AND INSTRUMENT INVESTIGATIONS SHARE KEY LESSONS LEARNED WITH THE NEWLY SELECTED TEAMS IN A WORKSHOP FORMAT WHICH MAY INCLUDE BRIEFINGS AND PANEL DISCUSSIONS. THIS TASK INCLUDES PLANNING THE WORKSHOP AGENDAS, IDENTIFYING THE MASTERS FORUM SPEAKERS, PRESENTERS, AND PANELISTS AND ARRANGING THEIR PARTICIPATION AT THE PI MASTERS FORUM WORKSHOP. |
| NNL17AA16T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $167.01K | 2017-04-03 | 2020-09-23 | 541712 | "IGF::OT::IGF: PLANETARY DATA SYSTEM (PDS) CHIEF SCIENTIST SUPPORT THE CONTRACTOR SHALL SUPPORT THE PDS PROGRAM EXECUTIVE AND PDS PROGRAM SCIENTIST IN ACHIEVING AN OBJECTIVE, NON-ADVOCATE COMMUNITY ASSESSMENT OF A TEN-YEAR PDS ROADMAP. THE TASK INCLUDES REVIEWING THE MATERIAL PROVIDED, PARTICIPATION IN TELECONFERENCES AND SEVERAL FACE-TO-FACE PLENARY MEETINGS OF THE PDS ROADMAP STUDY TEAM (RST). THE CONTRACTOR SHALL PROVIDE AN INDEPENDENT SERVICES OF CONSULTANT TO SERVE AS A CHAIR FOR THE PDS MANAGEMENT COUNCIL (PDSMC) FACE-TO-FACE MEETINGS, WHICH INCLUDES SUPPORT TO MANAGE THE AGENDA WITH THE PDS PROJECT MANAGER, MONITORING OF ACTION ITEMS FROM ALL PDSMC MEETINGS, AND COORDINATION OF PDS SCIENCE-RELATED TOPICS. THE PDS CHIEF SCIENTIST IS NOT A GOVERNMENT POSITION. HISTORICALLY, IT HAS BEEN HELD BY ACTIVE PLANETARY SCIENTISTS FROM A BROAD RANGE OF RESEARCHERS AT ACADEMIC RESEARCH INSTITUTIONS, OR SCIENCE CONSULTANTS, WHO CAN DEEPLY INTERACT WITH THE PLANETARY SCIENCE COMMUNITY AT LARGE. |
| 80LARC17F0006 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $161.7K | 2017-06-28 | 2018-04-30 | 541712 | IGF::OT::IGF SURFACE WATER AND OCEAN TOPOGRAPHY SWOT PROJECT STANDING REVIEW BOARD SRB SUPPORT. SWOT SURFACE WATER AND OCEAN TOPOGRAPHY IS A NASA INTERNATIONAL PARTNERS SCIENCE MISSION DESIGNED TO PROVIDE OCEAN TOPOGRAPHY MEASUREMENTS FOR DETERMINING OCEAN CIRCULATION, SEA LEVEL RISE AND CLIMATE CHANGE. IT IS DESIGNATED AS A CATEGORY 2 SPACE FLIGHT PROJECT. INTERNATIONAL PARTNERS INCLUDE CENTRE NATIONAL DETUDES SPATIALES CNES AND CANADIAN SPACE AGENCY CSA. SWOT IS A PROJECT WITHIN THE EARTH SCIENCE DIVISION OF NASAS SCIENCE MISSION DIRECTORATE. IT IS MANAGED OUT OF THE EARTH SYSTEMATIC MISSIONS PROGRAM OFFICE AT GSFC. 3.2 A STANDING REVIEW BOARD SRB IS RESPONSIBLE FOR INDEPENDENTLY ASSESSING THE HEALTH OF THE PROJECT. INDEPENDENT REVIEWS OF PROJECTS ARE CONDUCTED AT DEFINED LIFECYCLE MILESTONES AND ARE USED TO OBJECTIVELY ASSESS THE PROJECTS PROGRESS AGAINST THE PROJECT PLAN, ITS READINESS TO PROCEED TO THE NEXT LIFECYCLE PHASE, COMPLIANCE WITH NPR 7120.5 AND NPR 7123.1 REQUIREMENTS, AND THE INTEGRATED BASELINE. 3.3. THE PURPOSE OF THIS TASK IS TO OBTAIN SRB SUPPORT IN CONDUCTING SWOT LIFE CYCLE REVIEWS LCR, PREPARE REVIEW DOCUMENTS&PRESENTATIONS, ATTEND SUBSYSTEM REVIEWS AS AN SRB OBSERVER, AND COMPLETE ALL REQUESTED MANAGEMENT OUT-BRIEF |
| 80LARC24F0002 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $159.97K | 2023-10-12 | 2024-12-31 | 541715 | NASA SCIENCE MISSION DIRECTORATE PHASE E COST STUDY INDEPENDENT STUDY TEAM |
| NNL14AA09T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $159.54K | 2014-03-19 | 2016-06-30 | 541712 | "IGF::OT::IGF" OTHER FUNCTIONS: IONOSPHERIC CONNECTION EXPLORER (ICON) AND TRANSITING EXOPLANET SURVEY SATELLITE (TESS)PROGRAMMATIC (COST, SCHEDULE AND RISK) ASSESSMENTS CTS SHALL ATTEND TESS AND ICON REVIEWS AS REQUIRED BY THE SCHEDULE PARAGRAPH 7. CTS SHALL ALSO ASSESS THE INFORMATION TO BE PROVIDED BY THE PROJECT AND FROM THOSE REVIEWS, AND SHALL DELIVER RELEVANT ANALYTICAL ASSESSMENTS OF THE PROJECT S COST, SCHEDULE, AND TECHNICAL PERFORMANCE TO NASA HQ SMD, AND SHALL BRIEF THE RESULTS OF THE ANALYSES TO THE RELEVANT PROGRAM EXECUTIVES (PE), PROGRAM AND COST ANALYSIS TEAM (PCAT), SMD MANAGEMENT, AND OTHERS UPON REQUEST. 4.1.1 PRELIMINARY DESIGN REVIEW (PDR), PRE-KEY DECISION POINT (KDP) C: THE ASSESSMENT FUNCTIONS ADDRESS THE GOALS OF ESTABLISHING A CREDIBLE TECHNICAL BASELINE WITH SUFFICIENT FIDELITY AND CONFIDENCE THAT THE PROJECT CAN BE IMPLEMENTED WITHIN THE ALLOCATED BUDGET AND SCHEDULE. THE CONTRACTOR SHALL SUMMARIZE THE DATA AND FINDINGS IN A REPORT, WHICH SHALL INCLUDE 1. ASSESSMENT OF THE PROJECT S COST AND SCHEDULE ESTIMATE 2. IDENTIFICATION AND QUANTIFICATION OF ALL THE KNOWN RISKS TO MISSION SUCCESS AS WELL AS THE GENERIC UNCERTAINTIES THAT MIGHT BE AFFECTING THE PROJECT COST AND SCHEDULE 3. DEVELOPMENT OF INDEPENDENT COST ESTIMATE (ICE) AND INDEPENDENT SCHEDULE ESTIMATE (ISE) PROBABILISTIC ANALYSES TO ACCURATELY REFLECT THE PROJECT S RISK POSTURE, WHICH PROVIDE SMD A CREDIBILITY OF THE COST AND SCHEDULE ESTIMATES. CTS SHALL ALSO PROVIDE AN ANALYSIS OF JOINT COST AND SCHEDULE CONFIDENCE LEVEL (JCL) UPON REQUEST. |
| NNL13AA57T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $159.41K | 2013-01-30 | 2016-06-30 | 541712 | "IGF::OT::IGF" OTHER FUNCTIONS: THE PURPOSE OF THIS TASK IS TO OBTAIN STANDING REVIEW BOARD (SRB) CHAIR AND TECHNICAL EXPERT SUPPORT FOR ALL INDEPENDENT REVIEW ACTIVITIES CONCERNING THE SPACE NETWORK GROUND SEGMENT SUSTAINMENT (SGSS) PROJECT: (CRITICAL DESIGN REVIEW (CDR), SYSTEM INTEGRATION REVIEW (SIR) AND OPERATIONAL READINESS (ORR). AN SRB IS RESPONSIBLE FOR INDEPENDENTLY ASSESSING THE HEALTH OF THE PROJECT. INDEPENDENT REVIEWS OF PROJECTS ARE CONDUCTED AT DEFINED LIFECYCLE MILESTONES AND ARE USED TO OBJECTIVELY ASSESS THE PROJECT S PROGRESS AGAINST THE PROJECT PLAN, ITS READINESS TO PROCEED TO THE NEXT LIFECYCLE PHASE, COMPLIANCE WITH NPR 7120.5 AND NPR 7123.1 REQUIREMENTS, AND THE INTEGRATED BASELINE. |
| NNL14AA12T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $157.07K | 2014-07-08 | 2015-09-23 | 541712 | IGF::OT::IGF NASA-ISRO SYNTHETIC APERTURE RADAR MISSION (NI-SAR) PROJECT STANDING REVIEW BOARD (SRB) THE PURPOSE OF THIS TASK IS TO OBTAIN SUPPORT FOR THE HELIOPHYSICS (LIVING WITH A STAR [LWS], SOLAR TERRESTRIAL PROBES [STP], EXPLORERS [EXP] PROGRAMS) COMBINED PROGRAM IMPLEMENTATION REVIEW (PIR) STANDING REVIEW BOARD (SRB) [FROM THIS POINT FORWARD DESIGNATED THE HELIOPHYSICS SRB] ASSOCIATED ACTIVITIES. THE CONTRACTOR(S) SHALL SUPPORT SRB ACTIVITIES ACCORDING TO NPR 7120.5 AND THE SRB HANDBOOK AND PROVIDE CURRENT, KNOWLEDGEABLE, INDEPENDENT SUPPORT TO THE REVIEW PROCESS IN THE AREAS OF 1) ENGINEERING, PROGRAM/PROJECT MANAGEMENT (IN THE SPACE PROGRAM), MANAGEMENT OF COMMUNICATIONS SATELLITE SYSTEMS, AS WELL AS SPACE SCIENCE MISSIONS AND ENVIRONMENTAL SATELLITE PROGRAMS, RISK MANAGEMENT, AND SAFETY AND MISSION ASSURANCE; 2) PROGRAM/PROJECT MANAGEMENT (SPACE FLIGHT PROGRAMS), LAUNCH VEHICLE INTEGRATION AND OPERATIONS, SYSTEMS ENGINEERING, AND HELIOPHYSICS SCIENCE. A STANDING REVIEW BOARD IS RESPONSIBLE FOR INDEPENDENTLY ASSESSING THE HEALTH OF THE PROGRAM. INDEPENDENT REVIEWS OF PROGRAMS ARE CONDUCTED AT DEFINED LIFECYCLE MILESTONES AND ARE USED TO OBJECTIVELY ASSESS THE PROJECT S PROGRESS AGAINST THE PROJECT PLAN, ITS READINESS TO PROCEED TO THE NEXT LIFECYCLE PHASE, COMPLIANCE WITH NPR 7120.5 AND NPR 7123.1 REQUIREMENTS. |
| NNL17AA11T | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $156.68K | 2017-02-28 | 2017-10-17 | 541712 | "IGF::OT::IGF: SENIOR REVIEW FOR PROBABLE EXTENSION OF EARTH SCIENCE OPERATING MISSIONS THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE TECHNICAL EXPERTISE TO THE NASA SCIENCE OFFICE FOR MISSION ASSESSMENTS (SOMA) (LOCATED AT NASA LANGLEY RESEARCH CENTER) ON THE TECHNICAL REVIEWS OF PROPOSALS SOLICITED FOR THE SENIOR REVIEW 2017 FOR EXTENSION OF EARTH SCIENCE OPERATING MISSIONS (REFERRED TO AS THE SENIOR REVIEW FROM HEREON). THE NASA EARTH SCIENCE DIVISION (ESD) OF THE SCIENCE MISSION DIRECTORATE (SMD) IS SUPPORTING SEVERAL EARTH OBSERVING MISSIONS THAT ARE OPERATING BEYOND THEIR PRIME MISSION LIFETIMES. EXTENDED OPERATIONS AND ASSOCIATED DATA ANALYSIS ACTIVITIES REQUIRE A SIGNIFICANT FRACTION OF THE ESD ANNUAL BUDGET. NASA AND THE ESD THUS PERIODICALLY EVALUATE THE ALLOCATION OF MISSION OPERATION AND DATA ANALYSIS (MO&DA) FUNDS WITH THE AIM OF MAXIMIZING WITHIN FINITE RESOURCES THE MISSIONS CONTRIBUTIONS TO NASAS AND THE NATIONS GOALS. THIS PERIODIC NASA COMPARATIVE REVIEW FOR MISSIONS IN EXTENDED OPERATIONS IS KNOWN AS A SENIOR REVIEW. THE SENIOR REVIEW PANEL IS SUPPORTED BY A TECHNICAL SUBPANEL COMPOSED OF TECHNICAL EXPERTS FROM WITHIN AND/OR OUTSIDE NASA TO ASSESS THE HEALTH AND VIABILITY OF THE OPERATING SATELLITES. THE TECHNICAL SUBPANEL ASSESSES EACH MISSION PERFORMANCE AND RELIABILITY PROJECTIONS FOR THE SATELLITE AND INSTRUMENT(S), AS WELL AS THE MISSION OPERATIONS IMPLEMENTATION PLAN. THE TECHNICAL EXPERTS CONSIDER FACTORS INCLUDING THE STATUS OF CONSUMABLES AND PREDICTED UTILIZATION; SPACECRAFT AND INSTRUMENT STATUS, PERFORMANCE DEGRADATION, AND FAILURE RISK; THE PROPOSED MISSION OPERATIONS APPROACH FOR THE EFFECTIVE AND SAFE MANAGEMENT OF AN AGING SATELLITE; AND MISSION AND DATA MANAGEMENT. THIS TECHNICAL REVIEW IS PERFORMED ACCORDING TO CRITERIA STATED IN THE CALL FOR PROPOSALS SENIOR REVIEW 2017 FOR EXTENSION OF EARTH SCIENCE OPERATING MISSIONS. AS THE PRODUCTS OF THE TECHNICAL REVIEW, THE CONTRACTOR SHALL PROVIDE A TECHNICAL REVIEW FORM FOR EACH PROPOSAL, WHICH SERVES AS THE REPORT OF THE TECHNICAL REVIEW RESULTS. THIS TECHNICAL REVIEW FORM CONTAINS NARRATIVE TEXT AS WELL AS A RISK RATING FOR THE FEASIBILITY OF THE EXTENDED MISSION IMPLEMENTATION. |
| 80LARC20F0013 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $153.1K | 2019-11-26 | 2020-09-23 | 541712 | SUNRISE DELTA PHASE A REVIEW |
| 80LARC22F0023 | CORNELL TECHNICAL SERVICES LLC | National Aeronautics and Space Administration | $148.03K | 2022-03-30 | 2023-05-31 | 541715 | INDEPENDENT REVIEW TEAM SUBJECT MATTER EXPERT SUPPORT FOR CRITICAL DESIGN REVIEW OF THE SPACE LAUNCH SYSTEM BLOCK 1B |