Awards for “SERCO INC”
25 awards on this page · sorted by amount · page 61
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| OPM020700008O0777 | SERCO SERVICES INC | Office of Personnel Management | $619.18K | 2011-07-25 | 2012-04-07 | 611430 | TRAINING |
| N6600122F0079 | SERCO INC | Department of Defense | $618.81K | 2021-11-18 | 2022-10-31 | 541330 | PIERS EPCA 2.0 DESIGN AT NAVBASE VENTURA AND VIGOR SHIPYARDS |
| 0001 | SERCO INC | Department of Defense | $618.3K | 2009-09-30 | 2010-09-29 | 541611 | PROFESSIONAL SUPPORT SERVICES |
| 0224 | SERCO INC | Department of Defense | $615K | 2012-02-23 | 2013-02-22 | 541330 | LOT IV - THIRD OPTION YR - CPFF SERVICES |
| 0005 | SERCO INC | Department of Defense | $612.11K | 2013-08-13 | 2014-08-13 | 541511 | IGF::OT::IGF TASK ORDER FOR PROCESS ENGINEERING GROUP PROCESSING ASSURANCE AND MEASUREMENT SUPPORT |
| N6660425FR313 | SERCO INC | Department of Defense | $611.31K | 2025-03-19 | 2025-07-23 | 334419 | ANTENNA ASSEMBLIES |
| 0124 | SERCO INC | Department of Defense | $610.5K | 2011-09-23 | 2012-11-30 | 541330 | JOINT PERIMETER SURVEILLANCE COMMAND&CONTROL / SENSOR MANAGEMENT SYSTEM / ACCESS CONTROL SYSTEM (JPSCS2/SMS/ACS) UPGRADE. |
| 0107 | SERCO INC | Department of Defense | $610.31K | 2013-12-10 | 2015-07-31 | 541330 | IGF::OT::IGF THIS PERFORMANCE-BASED EFFORT ENCOMPASSES THE NMT INSTALLATION AT SSC PACIFIC, BUILDING 600 SEASIDE. INSTALLATION INCLUDES, BUT NOT LIMITED TO, TWO AS-4667/WSC-9 ANTENNAS WITH RADOMES, TWO ANTENNA PLATFORMS, TWO CY-8942/WSC-9(V)2 COMMUNICATIONS GROUP RACKS, ONE EQUIPMENT RACK, AND ONE EXTREMELY HIGH FREQUENCY (EHF) MEDIUM DATA RATE (MDR) |
| N6600124F0467 | SERCO INC | Department of Defense | $609.24K | 2024-05-09 | 2025-12-31 | 541330 | CUE PRODUCTION FOR SCN VIRGINIA CLASS SSN-810, 811 AND OBRP FOR SSN-807, 808 |
| 0050 | SERCO INC | Department of Defense | $605.65K | 2012-03-21 | 2013-06-14 | 541330 | TECHNICAL, ANALYTICAL, ENGINEERING SERVICES |
| 0031 | SERCO INC | Department of Defense | $605.28K | 2011-03-28 | 2012-07-31 | 541611 | PROFESSIONAL SUPPORT SERVICES |
| W9124J21C0007 | SERCO INC | Department of Defense | $604.56K | 2021-03-15 | 2025-05-14 | 541519 | TMS: SUPPORT SERVICES |
| N6600125F0406 | SERCO INC | Department of Defense | $603.92K | 2025-04-15 | 2026-11-30 | 541330 | CUE PRODUCTION AND ENGINEERING SUPPORT FOR NEW SHIPS CONSTRUCTION (SCN) VIRGINIA CLASS SHIPSETS AND ON-BOARD REPAIR PARTS (OBRP) SPARES KITS |
| N0017421F0032 | SERCO INC | Department of Defense | $603.91K | 2020-11-25 | 2022-12-23 | 541990 | CIWS SUPPORT SERVICES |
| 0077 | SERCO INC | Department of Defense | $603.41K | 2013-09-12 | 2014-09-11 | 541330 | TECHNICAL, ANALYTICAL, ENGINEERING SERVICES. IGF::OT::IGF OTHER FUNCTIONS |
| N6600119F0497 | SERCO INC | Department of Defense | $603.27K | 2019-03-21 | 2020-06-07 | 541330 | USS ILLINOIS ADNS INC III SP4 SA 4905 |
| 0002 | SERCO INC | Social Security Administration | $603.12K | 2010-09-30 | 2011-09-29 | 541519 | CONTRACTOR SERVICES FOR IMPLEMENTING TRIRIGA MODULES AS DEFINED IN THE GAP ANALYSIS AND IMPLEMENTATION PLAN COMPLETED UNDER CONTRACT SS00-09-31615. |
| N6600122F0993 | SERCO INC | Department of Defense | $602.74K | 2022-08-23 | 2024-02-04 | 541330 | HARDWARE INSTALLATION OF C4ISR AND NETWORK RELATED SYSTEMS ONBOARD USS CURTIS WILBUR (DDG 54), SAN DIEGO CA |
| N6600119F0177 | SERCO INC | Department of Defense | $602.47K | 2018-12-14 | 2019-12-13 | 541330 | SUSTAINMENT SUPPORT IN COMMANDER NAVY REGION EUROPE |
| 0016 | SERCO INC | Department of Defense | $601.94K | 2015-08-13 | 2016-08-13 | 541511 | IGF::OT::IGF PROCESS ENGINEERING GROUP (PEG) PROCESSING ASSURANCE AND MEASUREMENT SUPPORT TASK ORDER. |
| 0020 | SERCO INC | Department of Defense | $601.63K | 2016-08-04 | 2017-08-31 | 541511 | IGF::OT::IGF CONFIGURATION MANAGEMENT/LIBRARY SYSTEM MANAGEMENT SUPPORT |
| NNG08CA03C | SERCO INC. | National Aeronautics and Space Administration | $600K | 2008-01-07 | 2010-04-06 | 541712 | AN INTERFACE BETWEEN THE PARAMESH COMPUTATIONAL LIBRARIES AND THE CACTUS COMPUTATIONAL FRAMEWORK WILL BE DESIGNED AND IMPLEMENTED. THE PARAMESH COMPUTATIONAL LIBRARIES WERE DEVELOPED BY GROUPS AT NASA GSFC. THE CACTUS COMPUTATIONAL FRAMEWORK WAS DEVELOPED PRIMARILY BY SCIENTISTS AT LOUISIANA STATE UNIVERSITY, WHICH IS THE RESEARCH INSTITUTION (RI) ON THIS PROPOSAL. THIS INNOVATION FALLS IN THE DOMAIN OF ADAPTIVE MESH REFINEMENT (AMR), A TECHNIQUE TO FOCUS COMPUTATIONAL RESOURCES IN REGIONS OF SMALL SCALE DYNAMICS. THIS INNOVATIVE APPROACH BRINGS TOGETHER ONE OF THE LEADING AMR PACKAGES (PARAMESH) WITH CACTUS, A WIDELY USED MODULAR, PARALLEL PROBLEM SOLVING ENVIRONMENT THAT IS SUPPORTED ON MULTIPLE COMPUTING ARCHITECTURES. THIS INNOVATION WILL OFFER THE FOLLOWING: 1) REDUCE COSTS FOR CURRENT PARAMESH USERS AT GODDARD, BY PROVIDING ACCESS TO THE WIDE VARIETY OF VALIDATED TOOLS ALREADY AVAILABLE THROUGH CACTUS AND WHICH WOULD OTHERWISE NEED TO BE REDEVELOPED AT NASA; 2) FACILITATE SHARING OF NOVEL ALGORITHMS BETWEEN PARAMESH AND CACTUS USERS WORLDWIDE THROUGH THE EXISTING AND PROVEN INTEROPERABILITY FEATURES PROVIDED BY CACTUS; 3) POSITION PARAMESH USERS TO BENEFIT FROM THE MANY NEXT-GENERATION COMPUTER SCIENCE INNOVATIONS THAT ARE ACTIVELY RESEARCHED BY THE CORE CACTUS DEVELOPMENT TEAM (SUCH AS GRID COMPUTING) AND OTHER CACTUS CONTRIBUTORS. |
| 0269 | SERCO INC | Department of Defense | $600K | 2013-02-01 | 2013-11-20 | 541330 | LOT V - FOURTH OPT YR - SERVICES |
| 0033 | SERCO INC | Department of Defense | $599.36K | 2013-09-12 | 2014-09-13 | 561210 | IGF::OT::IGF NEW HAZMAT TASK ORDER UNDER N00189-10-D-Z029 - PERIOD OF PERFORMANCE: 14 SEPTEMBER 2013 THROUGH 13 SEPTEMBER 2014 |
| W15QKN18F0269 | SERCO INC | Department of Defense | $599.13K | 2018-09-20 | 2020-09-19 | 541511 | TASK ORDER FOR SPIDER SUSTAINMENT TASK- OMNIBUS 6, FUNCTIONAL AREA 2 |