Awards for “MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC”
25 awards on this page · sorted by amount · page 6
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| GS11P15YMC0051 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $282.84K | 2015-03-24 | 2015-12-31 | 238220 | DESIGN/BUILD WINDOW WASHING SUPPORT SYSTEM, LIBERTY LOAN BUILDING, 401 14TH STREET, SW, WASHINGTON, DC. IGF::OT::IGF |
| GS11P17MAC0021 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $267.77K | 2017-04-26 | 2018-01-08 | 238220 | IGF::OT::IGF SPRINKLER REPAIRS |
| 47PE0622F0035 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $227.71K | 2022-04-26 | 2022-10-28 | 236220 | JBD COURTHOUSE IT FLOORING REPAIR |
| GS11P16YTC7193 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $227.68K | 2016-09-22 | 2017-05-01 | 236220 | IGF::OT::IGF, OTHER FUNCTION R&A CONSTRUCTION SERVICES- REPLACEMENT OF BROKEN GLASS STOREFRONT AT ORVILLE WRIGHT FEDERAL BUILDING |
| 47PE0223F0033 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $222.47K | 2022-12-14 | 2023-03-14 | 236220 | SEALING EXTERIOR PENETRATION / OPENING AND PAVER REPAIR PROJECT LOCATED AT THE SAM NUNN ATLANTA FEDERAL CENTER, ATLANTA, GA 30303-3490. |
| N6945022F0313 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Defense | $219.69K | 2022-03-15 | 2022-07-25 | 236220 | B-114/B-316 REPLACE DOMESTIC WATER HEATER REPAIRS |
| N6945025F0155 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Defense | $210.76K | 2025-01-13 | 2025-08-07 | 236220 | B446 REPLACE CHILLER |
| N6945019P5208 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Defense | $206.39K | 2019-01-14 | 2019-05-29 | 236220 | SBT TRAINING TANK BOILER |
| 47PE0223F0215 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $205.78K | 2023-09-25 | 2024-09-23 | 236220 | AWARD IS TO REPLACE TWO EXISTING COMPUTER ROOM A/C UNITS LOCATED IN THE 2241 USDC DATA CENTER AND THE 4TH FLOOR USAO'S COMPUTER ROOM. THE PROJECT IS LOCATED IN THE RICHARD B. RUSSELL FEDERAL BUILDING, 75 TED TURNER DRIVE SW, ATLANTA, GA 30303-3315. |
| GS11P15MKC7003 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $200.05K | 2015-09-11 | 2016-05-25 | 238160 | THE PURPOSE OF THIS CONTRACT IS TO PROVIDE A NEW EMS VAV CONTROL SYSTEM FOR THE JUDICIARY SQUARE BUILDING. IGF::OT::IGF |
| 47PM0517C0010 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $197.19K | 2017-08-08 | 2019-03-01 | 236220 | IGF::CL::IGF THIS CONTRACT IS TO REMOVE AN UNDERGROUND FUEL TANK AND INSTALL A NEW ABOVE GROUND FUEL TANK. |
| 1232SC18C0061 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Agriculture | $186.2K | 2018-09-18 | 2019-06-10 | 236220 | IGF::OT::IGF POWER WASH ENTIRE BUILDING, PAINT ALL STUCCO-CANOPY OVERHANGS-PANELS AT CANOPY OVERHANG-7 DOUBLE DOORS AND ONE SINGLE DOOR AND CAULK 400 LF OF PARAPET WALLS TO PAINT BUILDING #11 IN ACCORDANCE WITH THE STATEMENT OF WORK. REPLACE GLAZING PANELS ON ROOF (ONLY) OF EXISTING LUDY STRUCTURE COMPRISED OF ONE (1) 5 FT 10 IN X 50 FT (NOMINAL) CORRIDOR GUTTER CONNECTED TO TWO (2) 25 FT 8 IN X 50 FT (NOMINAL) GREENHOUSES (ALSO, ENTRYWAY ROOF). REMOVE AND REPLACE 16MM (16/32) CLEAR ACRYLIC GLAZING PANELS CONSISTING OF: (A) 48 PANELS IN RIDGE VENTS. SIZES RANGING FROM 47 1/4 IN X 3 FT 0 IN AND 47 1/4 IN X 2 FT 0 IN (B) 100 PIECES IN ROOF SLOPES. SIZES RANGING FROM 47 1/4 IN X 14 FT 3 IN TO 4 1/4 IN X 2 FT 10 IN. REPLACEMENT WILL INCLUDE NEW BAR CAP GASKET AND BAR CAP SCREWS AS NECESSARY. |
| 47PE0624F0037 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $183.05K | 2024-02-26 | 2024-06-25 | 236220 | REQUEST FOR NON-SEVERABLE MINOR ALTERATIONS FOR THE TERRY SANFORD FEDERAL COURTHOUSE, BUILDING # NC0111AB, LOCATED AT 310 NEW BERN AVENUE, RALEIGH, NC 27601 |
| N6945020F1717 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Defense | $180.94K | 2020-05-04 | 2020-11-13 | 236220 | B-470 REPLACE AIR CONDITIONING UNIT AT ROOM 208-209 |
| 47PE0723F0037 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $179.21K | 2023-01-23 | 2023-08-31 | 236220 | THIS REQUIREMENT IS TO RENOVATE THE SENIOR JUDGE'S CHAMBERS LOCATED IN THE USDC FEDERAL BUILDING, 911 JACKSON AVENUE, OXFORD, MS 38655-3632. |
| W912QG19P5029 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Defense | $177.23K | 2019-09-16 | 2019-10-16 | 238220 | REPLACE HVAC SYSTEMS BUILDING 253 |
| 12405B20C0010 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Agriculture | $174.33K | 2020-06-23 | 2020-12-01 | 238220 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO SUPPLY, AND INSTALL A REPLACEMENT BOILER TO GENERATE HOT WATER AT THE USDA, ARS, CENTER FOR MEDICAL, AGRICULTURAL AND VETERINARY ENTOMOLOGY, (CMAVE) BU |
| 47PE0624F0002 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $170.97K | 2023-10-19 | 2024-08-09 | 236220 | RENOVATED JUDGES' CHAMBERS |
| N6945018C9218 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of Defense | $168.7K | 2018-09-17 | 2019-03-10 | 238990 | IGF::OT::IGF REPAIR OF SINKHOLES AND CLEAN/VIDEO/INSPEC MULTIPLE STORM DRAINS |
| 47PE0223F0200 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $168.39K | 2023-09-01 | 2024-05-31 | 236220 | AWARD FOR RBR LP PARKING LOT RE-STRIPING & MARKING AT THE RICHARD B. RUSSELL FEDERAL COURTHOUSE 75 TED TURNER DR. SW ATLANTA, GA 30303 |
| GS11P15YTP0251 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $161.95K | 2015-05-26 | 2015-12-31 | 236220 | IGF::OT::IGF VARIABLE FREQUENCY DEVICES FOR ORVILLE WRIGHT BLDG |
| INP17PC00522 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | Department of the Interior | $158.37K | 2017-09-05 | 2018-04-01 | 238390 | IGF::OT::IGF, X:NOGRN, REPLACE CEILING TILES, VINYL FLOORING, INSTALL VAPOR BARRIER AND VENTILATION SYSTEM, REPLACE AUDIO SYSTEM AND INSTALL THERMAL INSTALLATION IN THREE PARK BUILDINGS. |
| GS11P17YMC0029 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $158.13K | 2017-04-13 | 2017-08-14 | 236220 | IGF::CL::IGF THIS PROJECT WILL INVESTIGATE, DESIGN AND REPAIR A SINKHOLE THAT IS FORMING. |
| 47PM0817C0009 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $157.87K | 2017-08-18 | 2018-05-11 | 238190 | TO PROVIDE ALL THE LABOR, EQUIPMENT, MATERIALS AND SUPERVISION TO REPAIR THE TRENCH DRAIN AT THE FRONT ENTRANCE DOOR OF THE FAA WILBUR WRIGHT BUILDING LOCATED AT 600 INDEPENDENCE AVENUE, SW, WASHINGTON, DC. "IGF::OT::IGF" |
| 47PE0624F0051 | MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC | General Services Administration | $155.03K | 2024-04-16 | 2024-11-16 | 236220 | SECURITY GATE UPGRADE JOHN H WHEELER USDC NC0017ZZ DURHAM, NC 27702 |