Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 58
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| INF13PX01514 | HDR ENGINEERING, INC. | Department of the Interior | $15.3K | 2013-06-27 | 2014-01-31 | 813312 | IGF::OT::IGF BUTTERFLY SURVEY |
| AG82X9D120095 | HDR ENGINEERING, INC. | Department of Agriculture | $15.21K | 2012-07-27 | 2015-12-20 | 541310 | IGF::CT::IGF CRITICAL FUNCTIONS: ARNF BRIDGE INSPECTIONS - HDR 04-2012 |
| 6982AF21F000014 | HDR ENGINEERING, INC. | Department of Transportation | $15.19K | 2020-12-15 | 2021-04-15 | 541330 | CLIN 00001 - K200 FUNDS NM FLAP 159(1) CATWALK ACCESS ROAD PRELIMINARY ENGINEERING - ROW PLANS BASED ON REVISED DESIGN |
| 6982AF18F000094 | HDR ENGINEERING, INC. | Department of Transportation | $15.17K | 2018-05-10 | 2018-10-15 | 541330 | CA PFH 112-1(2) SOUTH FORK SMITH RIVER ROAD MITIGATION AND MONITORING, WETLAND DELINEATION, AND REPORTING AS REQUIRED BY PERMIT |
| 6982AF20F000013 | HDR ENGINEERING, INC. | Department of Transportation | $15.13K | 2019-12-16 | 2020-02-15 | 541330 | NM FLAP 159(1) CATWALK ACCESS ROAD IMPROVE CATWALK ACCESS ROAD |
| HHSN272201000724P | HDR ENGINEERING, INC. | Department of Health and Human Services | $15K | 2010-07-09 | 2010-08-30 | 541330 | TAS::75 0885::TAS HDR ENGINEERING (AMBIS #1514315) |
| 140P2022F0110 | HDR ENGINEERING, INC. | Department of the Interior | $15K | 2022-05-09 | 2022-09-30 | 541330 | CHRI 217021 AE TITLE III CONSTRUCTION SUPPORT |
| 0089 | HDR ENGINEERING, INC. | Department of Transportation | $15K | 2016-06-28 | 2018-05-31 | 541330 | IGF::CT::IGF TX FLAP RM1431(1) BALCONES CANYON LANDS NWR ENTRANCE 124068-12-D-00013/0089 DTFH68-12-D-00013/0089 POST DESIGN SERVICES |
| 0076 | HDR ENGINEERING, INC. | Department of Transportation | $15K | 2016-01-01 | 2016-12-31 | 541330 | IGF::CT::IGF OK FLAP SH49(1) STATE HIGHWAY 49 DTFH68-12-D-00013/0076 POST DESIGN SUPPORT SERVICES TASK ORDER |
| INF16PX01076 | HDR ENGINEERING, INC. | Department of the Interior | $14.91K | 2016-05-20 | 2017-05-20 | 541611 | IGF::CL::IGF LAMPREY CONSERVATION AGREEMENT COORDINATOR |
| AG82X9D100055 | HDR ENGINEERING, INC. | Department of Agriculture | $14.82K | 2010-06-29 | 2012-07-09 | 541330 | PSI BRIDGE INSPECTIONS |
| DTFH6806D00007T11062 | HDR ENGINEERING, INC. | Department of Transportation | $14.8K | 2011-05-17 | 2011-08-31 | 541330 | DESIGN SERVICES |
| DTFH6806D408T013 | HDR ENGINEERING, INC. | Department of Transportation | $14.8K | 2007-11-29 | 2007-12-31 | 541330 | CONSTRUCTION INSPECTION |
| 6982AF18F000086 | HDR ENGINEERING, INC. | Department of Transportation | $14.75K | 2018-04-26 | 2019-06-01 | 541330 | TX FTFW LAAT 10(2) ENTRANCE ROAD AND WILDLIFE CROSSING POST DESIGN SERVICES |
| 6982AF18F000108 | HDR ENGINEERING, INC. | Department of Transportation | $14.73K | 2018-06-26 | 2020-03-30 | 541330 | TX FTFW LAAT 10(2)ENTRANCE ROAD AND WILDLIFE CROSSING A/E SERVICES FOR WETLAND MITIGATION TASK ORDER |
| DTFH6806D00007T10032 | HDR ENGINEERING, INC. | Department of Transportation | $14.55K | 2010-03-10 | 2010-04-30 | 541330 | AZ BOR SR 24(0) STATE ROUTE 24 SCOPING DTFH68-06-D-00007/T-10-032 |
| AG8371D140067 | HDR ENGINEERING, INC. | Department of Agriculture | $14.41K | 2014-09-26 | 2014-12-20 | 541310 | BRIDGE SCOUR EVALUATIONS. 8 BRIDGE SCOUR EVALUATIONS ARE NEEDED ON THE TONTO NF IN ARIZONA. PLEASE SEE ATTACHED STATEMENT OF WORK FOR DETAILS; IN ADDITION, THE CORRESPONSING BRIDGE INVENORY'S AND INSPECTIONS. ESTIMATED TOTAL COST, PER HDR QUOTE DATED SEPT 18, 2014, IS $14,414.00. PERIOD OF PERFORMANCE 1 OCT 2014 THRU 16 JAN 2015, SUBJECT TO CHANGE DEPENDING ON ISSUANCE OF NOTICE TO PROCEED. FPDS CODE - IGF::OT::IGF |
| AG82X9D110088 | HDR ENGINEERING, INC. | Department of Agriculture | $14.3K | 2011-08-09 | 2015-12-20 | 541310 | GEOTECH VALLECITO |
| 0068 | HDR ENGINEERING, INC. | Department of Transportation | $14.3K | 2015-07-16 | 2015-09-30 | 541330 | IGF::CT::IGF ND FTNP THRO 11(8) CULVERT REPAIR ON SOUTH UNIT LOOP ROAD |
| DEAT6511WC94989 | HDR ENGINEERING, INC. | Department of Energy | $14.29K | 2011-09-20 | 2012-01-28 | 541330 | A&E TITLE III SERVICES |
| 0073 | HDR ENGINEERING, INC. | Department of Transportation | $14.27K | 2015-10-05 | 2015-12-31 | 541330 | IGF::CT::IGF OK ERFO WIMO SH49(1) EASTSIDE ROAD |
| 140P5322F0034 | HDR ENGINEERING, INC. | Department of the Interior | $14.27K | 2022-07-19 | 2022-11-18 | 541330 | A/E SERVICES CUGA HENSLEY WATER SYSTEM |
| DEDT0004683 | HDR ENGINEERING, INC. | Department of Energy | $14.22K | 2012-09-19 | 2013-10-23 | 541330 | CORNING SUBSTATION SECONDARY CONTAINMENT SURVEY, DESIGN, SPCC PLAN |
| DTFH6806D00007T11059 | HDR ENGINEERING, INC. | Department of Transportation | $14.21K | 2011-04-28 | 2011-06-30 | 541330 | AZ PRA GRCA 12(7) CVIP AND MATHER POINT IMPROVEMENTS POST DESIGN DTFH68-06-D-00007/T-11-059 $15,377.21 |
| AG8371P060106 | HDR, INC | Department of Agriculture | $14.2K | 2006-09-11 | 2007-09-30 | 541330 | TASK ORDER NO. 53-8371-6-0051, THE FRACTURE CRITICAL BRIDGE INSPECTION PROJECT ON THE TONTO NATIONAL FOREST |