FedTALLY

Awards for “HDR ENGINEERING, INC.

25 awards on this page · sorted by amount · page 53

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
DTFH6806D00007T10045HDR ENGINEERING, INC.Department of Transportation$30K
2010-08-192011-06-30541330AZ BOR CIBR 900(1) CIBOLA BRIDGE DECK REPLACEMENT POST DESIGN.
0071HDR ENGINEERING, INC.Department of Transportation$29.91K
2015-11-242016-07-31541330IGF::CT::IGF AZ FLAP 234(3) LAKE MARY ROAD DTFH68-12-D-00013 3R+4R IMPROVEMENTS
DTFH6806D00007T10041HDR ENGINEERING, INC.Department of Transportation$29.59K
2010-06-242011-12-31541330POST DESIGN SERVICES FOR TAJIQUE-TORREON
AG82X9D080086HDR ENGINEERING, INC.Department of Agriculture$29.58K
2008-06-102010-09-16541330BRIDGE INSPECTIONS AND RATINGS ON GMUG TASK ORDER 01-08 ON IDIQ CONTRACT AT RO
AG82X9D140031HDR ENGINEERING, INC.Department of Agriculture$29.57K
2014-07-212015-02-27541310IGF::CT::IGF
0015HDR ENGINEERING, INC.Department of Defense$29.56K
2013-04-302013-05-21541330IGF::OT::IGF ALGIERS BOUNDARY SURVEY, NAS NEW ORLEANS, LA
FA489719FA010HDR ENGINEERING, INC.Department of Defense$29.53K
2019-03-202019-09-23541330DEMO BUILDING 1229
0016HDR ENGINEERING, INC.Department of Defense$29.48K
2009-01-222009-02-21541310SCOPING CONFERENCE FOR DESIGN EFFORT.
6982AF19F000110HDR ENGINEERING, INC.Department of Transportation$28.7K
2019-08-122019-12-27541330NM FLAP TRAIL 52000(2) 2ND STREET SW CORRIDOR PHASE 2 AE SCOPING EFFORT FOR NM FLAP TRAIL 52000(2)
0010HDR ENGINEERING, INC.Department of Defense$28.67K
2011-08-172012-02-13541310TASKS TO PREPARE A DESIGN-BUILD REQUEST FOR PROPOSAL AND CHARRETTE (D-B RFPC).
69056725F00024NHDR ENGINEERING, INC.Department of Transportation$28.39K
2025-05-012025-12-04541330ID FLAP CANYON MULTI(1), INDIANA AND ORCHARD SHARED ROADWAY THIS TASK ORDER IS FOR CONSULTANT PROJECT ENGINEER SERVICES, PER THE ATTACHED STATEMENT OF WORK (SOW). THE FIRM-FIXED-PRICE FOR THE TASK ORDER IS $360,456.21. FINAL COMPLETION DATE FOR T
AG8371D140068HDR ENGINEERING, INC.Department of Agriculture$28.29K
2014-09-262014-12-20541310SCOUR EVALUATIONS NEEDED FOR VARIOUS FORESTS WITHIN THE SOUTHWEST REGION. PLEASE SEE ATTACHED STATEMENT OF WORK FOR DETAILS; IN ADDITION THE CORRESPONDING BRIDGE INVENTORY'S AND INSPECTIONS. ESTIMATED TOTAL COST, PER HDR QUOTE DATED SEPT 18, 2014, IS NTE $28,294.00. PERIOD OF PERFORMANCE 1 OCT 2014 THRU 7 FEB 2015, THESE DATES SUBJECT TO CHANGE DEPENDING ON ISSUANCE OF NOTICE TO PROCEED. FPDS CODE - IGF::OT::IGF
DTFH6806D4TO10038HDR ENGINEERING, INC.Department of Transportation$28.07K
2010-06-032010-12-31541330CONSTRUCTION INPSECTION SERVICES FOR CA PRA REDW 102(1) ALDER CAMP WITH HDR ENGINEERING - RICK MOORE
140P2021F0112HDR ENGINEERING, INC.Department of the Interior$27.94K
2021-03-172021-07-09541330JOMU 311591APROJECT SCOPING MOUNT WANDA
W912GB19F0266HDR ENGINEERING, INC.Department of Defense$27.94K
2019-09-142020-09-13541330USAREUR 1391 PROGRAMMING POWIDZ_ POZNAN
0014HDR ENGINEERING, INC.Department of Transportation$27.38K
2017-09-112019-04-30541330IGF::CT::IGF SOIL SLOPE STABILIZATION USING FLEXIBLE FACING DTFH6816D00006/0014 HDR REPORT AND 508 COMPLIANCE
DTFH6806D00007T12074HDR ENGINEERING, INC.Department of Transportation$27.34K
2011-10-272012-09-28541330HFPM-12-0006; AZ PRA GLCA 1(1)&3(1), WAHWEAP MARINA ACCESS RD; TASK ORDER# DTFH68-06-D-00007 / T-12-074; SCOPING; HDR ENGINEERING
INF10PD79180HDR ENGINEERING, INC.Department of the Interior$27.31K
2010-07-192011-10-30541330CA INSPECTIONS FOR VARIOUS LOCATIONS
0022HDR ENGINEERING, INC.Department of Transportation$27.22K
2017-08-252018-12-31541330IGF::CT::IGF NM FLAP TRAIL52000(1) 2ND STREET SW CORRIDOR DTFH6816D00006/0022 POST DESIGN SERVICES
0095HDR ENGINEERING, INC.Department of Transportation$26.81K
2017-04-052017-08-26541330IGF::CT::IGF NM FLAP US60(1) OLD US60 BRIDGE DTFH6812D00013/0095 CULTURAL AND BIOLOGICAL SURVEYS
DTFH6806D00007T10035HDR ENGINEERING, INC.Department of Transportation$26.62K
2010-05-202012-12-31541330NM PFH 12(6), CUBA LA CUEVA WETLAND MITIGATION
DTFH6812D00013T13008HDR ENGINEERING, INC.Department of Transportation$26.43K
2013-01-282013-12-31541330IGF::CT::IGF POST DESIGN SERVICES FOR AZ FTNP/PLHD/NPS GLCA 5(2)&99(1) LEE'S FERRY ROAD&PARIA RIVER BRIDGE CONTRACT# -12-D-00013 TASK ORDER # T-13-008
DTFH6806D00004T09025HDR ENGINEERING, INC.Department of Transportation$26.11K
2009-09-092009-10-19541330CONSTRUCTION INSPECTION SERVICES
INP14PB00366HDR ENGINEERING, INC.Department of the Interior$25.74K
2014-06-192014-07-31541330IGF::OT::IGF GATE-SAHO; PMIS 201061B; SCOPING SITE VISIT&REPORTS FOR HURRICANE SANDY REPAIRS TO VARIOUS BUILDINGS AT GATEWAY N.R.A. - SANDY HOOK
0049HDR ENGINEERING, INC.Department of Transportation$25.57K
2014-10-302014-12-19541330IGF::CT::IGF WY FLAP 129(1) SAND CREEK ROAD DTFH68-12-D-00013/0049 FUNDING FOR CULTURAL SURVEY