Awards for “FASONE CONSTRUCTION, INC.”
25 awards on this page · sorted by amount · page 5
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| GS09P13WLC0012 | FASONE CONSTRUCTION, INC. | General Services Administration | $37.52K | 2013-05-14 | 2013-08-09 | 236220 | IGF::OT::IGF COMPLETE U.S. COURT OF APPEALS CONFERENCE ROOM RESTORATION. |
| 127EAW24C0010 | FASONE CONSTRUCTION, INC. | Department of Agriculture | $37.35K | 2024-05-10 | 2024-08-30 | 238910 | BIG PINES TRAILHEAD VAULT TOILET INSTALLATION. ANGELES NATIONAL FOREST. |
| GS09P12WLC0026 | FASONE CONSTRUCTION, INC. | General Services Administration | $36.88K | 2012-09-27 | 2012-12-10 | 236220 | PERFORM SPACE RENOVATIONS FOR DCAA LOCATED @ 16700 VALLEY VIEW, LA MIRADA, CA. |
| 47PK1919F0025 | FASONE CONSTRUCTION, INC. | General Services Administration | $36.76K | 2019-02-05 | 2019-07-31 | 236220 | IGF::OT::IGF REPLACE ALL CEILING TILES IN USMS SPACE ON THE 3RD FLOOR AND REPLACE WINDOW BLINDS FOR GYM AREA AT THE ROYBAL FEDERAL BUILDING, 255 E. TEMPLE ST., LOS ANGELES, CA 90012-3332. |
| 47PK2018F0042 | FASONE CONSTRUCTION, INC. | General Services Administration | $34.9K | 2018-06-13 | 2018-10-31 | 236220 | LABOR AND MATERIALS, EQUIPMENT AND SUPERVISION TO REPAIR CHIPPING/BLISTERING OF GLAZED TERRA COTTA ON NORTH EAST CORNER OF THE US COURTHOUSE AT 312 N. SPRING STREET BUILDING FACADE. |
| GS09P13WPM0006 | FASONE CONSTRUCTION, INC. | General Services Administration | $34.19K | 2012-12-14 | 2013-04-13 | 238330 | IGF::OT::IGF FOR OTHER FUNCTIONS ALL WORK WILL TAKE PLACE ON SATURDAYS DURING THE DAY IN PHASES. PLEASE REFER TO ATTACHMENTS A, B AND C FOR A COMPLETE DESCRIPTION OF WORK. THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, COORDINATION, PLANNING, LABOR AND MATERIALS, AS REQUIRED, TO DEMO EXISTING CARPET, REPLACE EXISTING CARPET FLOORING (GOVERNMENT PROVIDED CARPET TILE), COVE BASE, FURNITURE HANDLING, SUPPLYING BOXES FOR PACKING, MOVING BOXES AS REQUIRED, AND MOVING FILE CABINETS. SYSTEMS FURNITURE WILL NEED TO BE KEPT IN PLACE AND SHOULD NOT REQUIRE DIS/RE-ASSEMBLY OR DISCONNECT/RE-CONNECT FOR ELECTRICAL, HOWEVER THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING, RE-ATTACHING AND LEVELING FURNITURE AS REQUIRED. THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ANY ELECTRICAL DISCONNECT AND RE-CONNECT. THE SPACE IS APPROXIMATELY 13500 SQUARE FEET. THE CONTRACTOR WILL BE REQUIRED TO DO THEIR OWN TAKEOFF PRIOR TO SUBMITTING A PRICE. THE WORK AREA IS LOCATED ON THE 2ND FLOOR AT 24000 AVILA ROAD, LAGUNA NIGUEL, CA 92677. 1.1.2 ALL WORK SHALL BE PERFORMED BY A CALIFORNIA STATE LICENSED CONTRACTOR ABLE TO SHOW PROOF OF WORKERS COMPENSATION AND LIABILITY INSURANCE. 1.1.3 ALL WORK ON THIS PROJECT SHALL BE ACCOMPLISHED ON THE DHS SCHEDULE AND PHASING, AND WILL BE COORDINATED WITH GSA. 1.1.4 THE CONTRACTOR SHALL EXAMINE SITE AND VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING WORK AND NOTIFY THE GOVERNMENT OF ANY DISCREPANCIES. 1.1.5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A COMPLETE AND FINISHED JOB. 1.1.6 REPLACING CARPET TILES SHALL BE COORDINATED TO MINIMIZE TIME AND MOVING FURNITURE |
| 47PK1719C0022 | FASONE CONSTRUCTION, INC. | General Services Administration | $32.15K | 2019-09-04 | 2019-11-17 | 236220 | CONTRACT NO. 47PK1719C0022 |
| GS09P14WPM0007 | FASONE CONSTRUCTION, INC. | General Services Administration | $28.3K | 2014-01-16 | 2014-03-13 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS THE INTENT OF THIS PROJECT IS TO REPLACE THE CEILING TILES, HVAC CONTROLS, AND CEILING LIGHTING IN THE LARGE CONFERENCE ROOM (SUITE 6000A) AND ADJACENT MEDIA CLOSET ON THE 6TH FLOOR. |
| 47PK1720C0004 | FASONE CONSTRUCTION, INC. | General Services Administration | $28.02K | 2019-12-09 | 2020-07-31 | 236220 | AWARD OF CONTRACT NO. 47PK1720C0004 |
| GS09P15WPM0006 | FASONE CONSTRUCTION, INC. | General Services Administration | $27.42K | 2014-11-14 | 2015-03-17 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS CONTRACTOR TO PROVIDE LABOR, MATERIAL AND SUPERVISION TO COMPLETE THE MODIFICATION TO SUITE 6000. |
| 140P8621C0013 | FASONE CONSTRUCTION, INC. | Department of the Interior | $27.37K | 2021-09-22 | 2022-05-21 | 238160 | REPLACE ROOFS OF TWO BUILDINGS AT RANCHO SIERRA VISTA |
| 47PK0022F0025 | FASONE CONSTRUCTION, INC. | General Services Administration | $26.69K | 2022-08-10 | 2023-06-02 | 236220 | USCIS MINOR REPAIRS AT ROYBAL FEDERAL BUILDING, 255 EAST TEMPLE ST., LOS ANGELES, CA. |
| GS09P16WPP7000 | FASONE CONSTRUCTION, INC. | General Services Administration | $25.59K | 2015-10-05 | 2016-09-30 | 238390 | IGF::OT::IGF FOR OTHER FUNCTIONS THE CONTRACTOR SHALL PROVIDE THE NECESSARY SUPERVISION, LABOR AND MATERIAL TO ACCOMPLISH THE FOLLOWING: INSTALL REMOTE LOCKS IN THE SECURE HALLWAYS TO BE ABLE TO LOCK THE FRONT DOORS OF COURTROOMS 301, 302, 303 AND 304. LOCKS TO HAVE CLEAR INDICATION OF "LOCK" AND "UNLOCKED: WITH LIGHTS, OR OTHER CLEAR MARKINGS ON THE PUSH BUTTON. NO OTHER LIGHTS WILL BE NEEDED TO INDICATE EMERGENCY OR OTHER WARNING. COURTS MUST APPROVE PUSH BUTTON SUBMISSION BEFORE INSTALL. NO OTHER LIGHTS WILL BE NEEDED TO INDICATE EMERGENCY OR OTHER WARNING. APPROVAL IS REQUIRED FOR PUSH BUTTON SUBMISSION BEFORE INSTALL. BUTTON SELECTION MUST BE COORDINATED WITH GSA PROJECT MANAGER. WORDING SHOULD READ LOCK OR SOMETHING SIMILAR AND HAVE GREEN LIGHTS FOR UNLOCK, RED LIGHT FOR LOCK. CONTRACTOR SHALL ADHERE TO PUBLIC SAFETY LAWS TO BE ABLE TO EXIT THE DOORS IN CASE OF EMERGENCY WHEN LOCKED. THE WORK SHOULD BE PERFORMED AFTERHOURS OR ON WEEKENDS. COMPLETION DATE: 45 CALENDAR DAYS AFTER NTP. PAYMENT PROTECTION: CONTRACTOR RESPONSIBLE FOR PROVIDING PROPER PAYMENT PROTECTION BY ONE OF THE FOLLOWING: PAYMENT BOND, IRREVOCABLE LETTER OF CREDIT, TRIPARTITE ESCROW OR CERTIFICATE OF DEPOSIT |
| 47PK1919C0007 | FASONE CONSTRUCTION, INC. | General Services Administration | $24.88K | 2019-05-06 | 2019-06-07 | 236210 | IGF::OT::IGF ACM REMEDIATION FOR USCIS ON THE BASEMENT, 1ST, 2ND, 6TH AND 8TH FLOORS, OF THE FEDERAL BUILDING, 300 NORTH LOS ANGELES STREET, LOS ANGELES, CA. 90012 |
| GS09P15WKC7003 | FASONE CONSTRUCTION, INC. | General Services Administration | $24.5K | 2015-06-05 | 2015-09-06 | 236220 | IGF::OT::IGF TEMPLE STREET CORRIDOR WATER DAMAGE REPAIR ROYBAL FEDERAL BUILDING, 255 E TEMPLE ST, LOS ANGELES, CA |
| 47PK2018P0007 | FASONE CONSTRUCTION, INC. | General Services Administration | $21.48K | 2018-06-29 | 2018-09-28 | 238990 | IGF::CT::IGF WINDOW UPGRADE FOR SUITE 204 IN COA PASADENA |
| GS09P15WPM0008 | FASONE CONSTRUCTION, INC. | General Services Administration | $21.13K | 2014-11-21 | 2015-01-23 | 238990 | IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL SUPERVISION, COORDINATION, PLANNING, LABOR AND MATERIAL TO ACCOMPLISH THE FOLLOWING: THE PROJECT SHALL INCLUDE THE FOLLOWING: 1. VENDOR TO PROVIDE LABOR AND MATERIALS FOR TOUCH-UP AND REPAIRS OF THE EXISTING MILLWORK IN EACH OF THE COURTROOMS AND JUDICIAL CHAMBERS NOTED IN FY2014 SANTA ANA FACILITY MAINTENANCE WALK-THRU LIST. 2. WORKING HOURS: ALL WORK TO BE COMPLETED AFTER NORMAL BUSINESS HOURS. IN ADDITION, CONTRACTOR SHALL NOTIFY GSA OF ANY WORK INVOLVING DISRUPTIVE ODORS FOR FUMES BEFORE INITIATING THE WORK AND PROVIDE IN ADVANCE MSDS MANUFACTURES DATA. ACCESS AT OTHER THAN THE NOTED, SHALL BE THROUGH PRIOR ARRANGEMENTS BETWEEN THE CONTRACTOR AND THE COR AND THE AGENCY CONTACT. 3. CONTRACTOR TO DEVELOP PROJECT SCHEDULE FOR THE GOVERNMENT'S APPROVAL. PER THE RFP DATED SEPTEMBER 25, 2014. COMPLETION: 45 CALENDAR DAYS FROM NTP. |
| 47PK1923F0024 | FASONE CONSTRUCTION, INC. | General Services Administration | $19.48K | 2023-04-26 | 2023-08-07 | 236220 | REPLACING MISSING GYPSUM BOARD IN STAIRWELLS AT ROYBAL TO MAINTAIN FIRE RATING AT ROYBAL |
| GS09P17WPP0021 | FASONE CONSTRUCTION, INC. | General Services Administration | $18.16K | 2017-03-14 | 2017-07-12 | 236210 | IGF::OT::IGF FOR OTHER FUNCTIONS CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND SUPERVISION TO COMPLETE ANNUAL FACILITY MAINTENANCE AND MILLWORK REPAIRS AT THE RONALD REAGAN COURTHOUSE AS DESCRIBED IN THE ATTACHED SOW. |
| GS09P15WPM0004 | FASONE CONSTRUCTION, INC. | General Services Administration | $17.67K | 2014-11-03 | 2015-01-09 | 238350 | IGF::OT::IGF FOR OTHER FUNCTIONS THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR AND MATERIAL TO COMPLETE THE USBC JUDGES' CHAMBER MILLWORK TOUCHUP AND REPAIR PROJECT. PER THE RFP DATED SEPTEMBER 23, 2014&AMENDMENT NO. 1 DATED OCTOBER 2, 2014. COMPLETION: 60 CALENDAR DAYS FROM NTP. |
| 70Z03719PPSK23900 | FASONE CONSTRUCTION, INC. | Department of Homeland Security | $16.92K | 2019-06-24 | 2019-07-22 | 237110 | CASREP: REPLACE BLDG 20 FIREMAIN VALVE AT BASE LA/ |
| GS09P14WPM0008 | FASONE CONSTRUCTION, INC. | General Services Administration | $16K | 2014-01-17 | 2014-03-15 | 236220 | IGF::OT::IGF FOR OTHER FUNCTIONS THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR AND MATERIAL TO COMPLETE THE FOLLOWING: 1. ALL WORK MUST CONFORM TO PBS P100 STANDARDS. 2. REMOVAL AND STORAGE OF FURNITURE IN WORKSTATION 24111 AND 24110 (AS REQUIRED). 3. REMOVAL AND STORE EXISTING CARPET FOR REUSE AS REQUIRED. 4. DEMOLISH EXISTING COVE BASE AS REQUIRED. 5. DEMOLITION PARTITION WALL. 6. CONSTRUCT NEW WALLS AS SHOWN. 7. RELOCATE VOICE /DATA/POWER ON NEW N WALL IN OFFICE 24110. 8. RELOCATE EXISTING WOOD DOOR AND METAL FRAME. 9. INSTALL NEW 2X2 RETURN AIR GRILLE 10. INSTALL NEW LIGHT FIXTURE TO MATCH EXISTING IN SUITE24111 11. INSTALL NEW CIRCUIT AND SWITCH WITH MOTION SENSOR IN SUITE 24111. 12. REINSTALL CARPET AND COVE BASE AS REQUIRED. 13. RELOCATE /RE-CENTER EXISTING SPRINKLER IN SUITE 24111. 14. MOVE THE AIR SUPPLY IN SUITE 24111 IN ORDER TO ACCOMODATE THE NEW WALL. 15. INSTALL NEW VERTICAL BLINDS IN SUITE 24111 |
| 47PK2018F0043 | FASONE CONSTRUCTION, INC. | General Services Administration | $15.71K | 2018-06-13 | 2018-10-31 | 236220 | INCLUDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO CLEAN MINERAL BUILD UP ON AREAS ASSIGNED ON GRANITE FACADE OF BUILDING AT THE U.S. COURTHOUSE, 312 N. SPRING ST., LOS ANGELES, CA. |
| 70Z03718PPQQ13600 | FASONE CONSTRUCTION, INC. | Department of Homeland Security | $14.21K | 2018-06-08 | 2018-07-22 | 236220 | IGF::OT::IGF WINDOW REPLACEMENT AT CG BASE LA/LB |
| GS09P17WPP0012 | FASONE CONSTRUCTION, INC. | General Services Administration | $13.3K | 2017-02-08 | 2017-07-13 | 236210 | IGF::OT::IGF FOR OTHER FUNCTIONS CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND SUPERVISION TO TOUCH-UP AND REPAIR/REPLACE THE EXISTING MILLWORK IN EACH OF THE COURTROOMS AND JUDICIAL CHAMBERS AS DESCRIBED IN THE ATTACHED RFP SATED NOVEMBER 21, 2016. |