FedTALLY

Awards for “FASONE CONSTRUCTION, INC.

25 awards on this page · sorted by amount · page 5

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
GS09P13WLC0012FASONE CONSTRUCTION, INC.General Services Administration$37.52K
2013-05-142013-08-09236220IGF::OT::IGF COMPLETE U.S. COURT OF APPEALS CONFERENCE ROOM RESTORATION.
127EAW24C0010FASONE CONSTRUCTION, INC.Department of Agriculture$37.35K
2024-05-102024-08-30238910BIG PINES TRAILHEAD VAULT TOILET INSTALLATION. ANGELES NATIONAL FOREST.
GS09P12WLC0026FASONE CONSTRUCTION, INC.General Services Administration$36.88K
2012-09-272012-12-10236220PERFORM SPACE RENOVATIONS FOR DCAA LOCATED @ 16700 VALLEY VIEW, LA MIRADA, CA.
47PK1919F0025FASONE CONSTRUCTION, INC.General Services Administration$36.76K
2019-02-052019-07-31236220IGF::OT::IGF REPLACE ALL CEILING TILES IN USMS SPACE ON THE 3RD FLOOR AND REPLACE WINDOW BLINDS FOR GYM AREA AT THE ROYBAL FEDERAL BUILDING, 255 E. TEMPLE ST., LOS ANGELES, CA 90012-3332.
47PK2018F0042FASONE CONSTRUCTION, INC.General Services Administration$34.9K
2018-06-132018-10-31236220LABOR AND MATERIALS, EQUIPMENT AND SUPERVISION TO REPAIR CHIPPING/BLISTERING OF GLAZED TERRA COTTA ON NORTH EAST CORNER OF THE US COURTHOUSE AT 312 N. SPRING STREET BUILDING FACADE.
GS09P13WPM0006FASONE CONSTRUCTION, INC.General Services Administration$34.19K
2012-12-142013-04-13238330IGF::OT::IGF FOR OTHER FUNCTIONS ALL WORK WILL TAKE PLACE ON SATURDAYS DURING THE DAY IN PHASES. PLEASE REFER TO ATTACHMENTS A, B AND C FOR A COMPLETE DESCRIPTION OF WORK. THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, COORDINATION, PLANNING, LABOR AND MATERIALS, AS REQUIRED, TO DEMO EXISTING CARPET, REPLACE EXISTING CARPET FLOORING (GOVERNMENT PROVIDED CARPET TILE), COVE BASE, FURNITURE HANDLING, SUPPLYING BOXES FOR PACKING, MOVING BOXES AS REQUIRED, AND MOVING FILE CABINETS. SYSTEMS FURNITURE WILL NEED TO BE KEPT IN PLACE AND SHOULD NOT REQUIRE DIS/RE-ASSEMBLY OR DISCONNECT/RE-CONNECT FOR ELECTRICAL, HOWEVER THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRING, RE-ATTACHING AND LEVELING FURNITURE AS REQUIRED. THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ANY ELECTRICAL DISCONNECT AND RE-CONNECT. THE SPACE IS APPROXIMATELY 13500 SQUARE FEET. THE CONTRACTOR WILL BE REQUIRED TO DO THEIR OWN TAKEOFF PRIOR TO SUBMITTING A PRICE. THE WORK AREA IS LOCATED ON THE 2ND FLOOR AT 24000 AVILA ROAD, LAGUNA NIGUEL, CA 92677. 1.1.2 ALL WORK SHALL BE PERFORMED BY A CALIFORNIA STATE LICENSED CONTRACTOR ABLE TO SHOW PROOF OF WORKERS COMPENSATION AND LIABILITY INSURANCE. 1.1.3 ALL WORK ON THIS PROJECT SHALL BE ACCOMPLISHED ON THE DHS SCHEDULE AND PHASING, AND WILL BE COORDINATED WITH GSA. 1.1.4 THE CONTRACTOR SHALL EXAMINE SITE AND VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING WORK AND NOTIFY THE GOVERNMENT OF ANY DISCREPANCIES. 1.1.5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A COMPLETE AND FINISHED JOB. 1.1.6 REPLACING CARPET TILES SHALL BE COORDINATED TO MINIMIZE TIME AND MOVING FURNITURE
47PK1719C0022FASONE CONSTRUCTION, INC.General Services Administration$32.15K
2019-09-042019-11-17236220CONTRACT NO. 47PK1719C0022
GS09P14WPM0007FASONE CONSTRUCTION, INC.General Services Administration$28.3K
2014-01-162014-03-13236220IGF::OT::IGF FOR OTHER FUNCTIONS THE INTENT OF THIS PROJECT IS TO REPLACE THE CEILING TILES, HVAC CONTROLS, AND CEILING LIGHTING IN THE LARGE CONFERENCE ROOM (SUITE 6000A) AND ADJACENT MEDIA CLOSET ON THE 6TH FLOOR.
47PK1720C0004FASONE CONSTRUCTION, INC.General Services Administration$28.02K
2019-12-092020-07-31236220AWARD OF CONTRACT NO. 47PK1720C0004
GS09P15WPM0006FASONE CONSTRUCTION, INC.General Services Administration$27.42K
2014-11-142015-03-17236220IGF::OT::IGF FOR OTHER FUNCTIONS CONTRACTOR TO PROVIDE LABOR, MATERIAL AND SUPERVISION TO COMPLETE THE MODIFICATION TO SUITE 6000.
140P8621C0013FASONE CONSTRUCTION, INC.Department of the Interior$27.37K
2021-09-222022-05-21238160REPLACE ROOFS OF TWO BUILDINGS AT RANCHO SIERRA VISTA
47PK0022F0025FASONE CONSTRUCTION, INC.General Services Administration$26.69K
2022-08-102023-06-02236220USCIS MINOR REPAIRS AT ROYBAL FEDERAL BUILDING, 255 EAST TEMPLE ST., LOS ANGELES, CA.
GS09P16WPP7000FASONE CONSTRUCTION, INC.General Services Administration$25.59K
2015-10-052016-09-30238390IGF::OT::IGF FOR OTHER FUNCTIONS THE CONTRACTOR SHALL PROVIDE THE NECESSARY SUPERVISION, LABOR AND MATERIAL TO ACCOMPLISH THE FOLLOWING: INSTALL REMOTE LOCKS IN THE SECURE HALLWAYS TO BE ABLE TO LOCK THE FRONT DOORS OF COURTROOMS 301, 302, 303 AND 304. LOCKS TO HAVE CLEAR INDICATION OF "LOCK" AND "UNLOCKED: WITH LIGHTS, OR OTHER CLEAR MARKINGS ON THE PUSH BUTTON. NO OTHER LIGHTS WILL BE NEEDED TO INDICATE EMERGENCY OR OTHER WARNING. COURTS MUST APPROVE PUSH BUTTON SUBMISSION BEFORE INSTALL. NO OTHER LIGHTS WILL BE NEEDED TO INDICATE EMERGENCY OR OTHER WARNING. APPROVAL IS REQUIRED FOR PUSH BUTTON SUBMISSION BEFORE INSTALL. BUTTON SELECTION MUST BE COORDINATED WITH GSA PROJECT MANAGER. WORDING SHOULD READ LOCK OR SOMETHING SIMILAR AND HAVE GREEN LIGHTS FOR UNLOCK, RED LIGHT FOR LOCK. CONTRACTOR SHALL ADHERE TO PUBLIC SAFETY LAWS TO BE ABLE TO EXIT THE DOORS IN CASE OF EMERGENCY WHEN LOCKED. THE WORK SHOULD BE PERFORMED AFTERHOURS OR ON WEEKENDS. COMPLETION DATE: 45 CALENDAR DAYS AFTER NTP. PAYMENT PROTECTION: CONTRACTOR RESPONSIBLE FOR PROVIDING PROPER PAYMENT PROTECTION BY ONE OF THE FOLLOWING: PAYMENT BOND, IRREVOCABLE LETTER OF CREDIT, TRIPARTITE ESCROW OR CERTIFICATE OF DEPOSIT
47PK1919C0007FASONE CONSTRUCTION, INC.General Services Administration$24.88K
2019-05-062019-06-07236210IGF::OT::IGF ACM REMEDIATION FOR USCIS ON THE BASEMENT, 1ST, 2ND, 6TH AND 8TH FLOORS, OF THE FEDERAL BUILDING, 300 NORTH LOS ANGELES STREET, LOS ANGELES, CA. 90012
GS09P15WKC7003FASONE CONSTRUCTION, INC.General Services Administration$24.5K
2015-06-052015-09-06236220IGF::OT::IGF TEMPLE STREET CORRIDOR WATER DAMAGE REPAIR ROYBAL FEDERAL BUILDING, 255 E TEMPLE ST, LOS ANGELES, CA
47PK2018P0007FASONE CONSTRUCTION, INC.General Services Administration$21.48K
2018-06-292018-09-28238990IGF::CT::IGF WINDOW UPGRADE FOR SUITE 204 IN COA PASADENA
GS09P15WPM0008FASONE CONSTRUCTION, INC.General Services Administration$21.13K
2014-11-212015-01-23238990IGF::OT::IGF FOR OTHER FUNCTIONS PROVIDE ALL SUPERVISION, COORDINATION, PLANNING, LABOR AND MATERIAL TO ACCOMPLISH THE FOLLOWING: THE PROJECT SHALL INCLUDE THE FOLLOWING: 1. VENDOR TO PROVIDE LABOR AND MATERIALS FOR TOUCH-UP AND REPAIRS OF THE EXISTING MILLWORK IN EACH OF THE COURTROOMS AND JUDICIAL CHAMBERS NOTED IN FY2014 SANTA ANA FACILITY MAINTENANCE WALK-THRU LIST. 2. WORKING HOURS: ALL WORK TO BE COMPLETED AFTER NORMAL BUSINESS HOURS. IN ADDITION, CONTRACTOR SHALL NOTIFY GSA OF ANY WORK INVOLVING DISRUPTIVE ODORS FOR FUMES BEFORE INITIATING THE WORK AND PROVIDE IN ADVANCE MSDS MANUFACTURES DATA. ACCESS AT OTHER THAN THE NOTED, SHALL BE THROUGH PRIOR ARRANGEMENTS BETWEEN THE CONTRACTOR AND THE COR AND THE AGENCY CONTACT. 3. CONTRACTOR TO DEVELOP PROJECT SCHEDULE FOR THE GOVERNMENT'S APPROVAL. PER THE RFP DATED SEPTEMBER 25, 2014. COMPLETION: 45 CALENDAR DAYS FROM NTP.
47PK1923F0024FASONE CONSTRUCTION, INC.General Services Administration$19.48K
2023-04-262023-08-07236220REPLACING MISSING GYPSUM BOARD IN STAIRWELLS AT ROYBAL TO MAINTAIN FIRE RATING AT ROYBAL
GS09P17WPP0021FASONE CONSTRUCTION, INC.General Services Administration$18.16K
2017-03-142017-07-12236210IGF::OT::IGF FOR OTHER FUNCTIONS CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND SUPERVISION TO COMPLETE ANNUAL FACILITY MAINTENANCE AND MILLWORK REPAIRS AT THE RONALD REAGAN COURTHOUSE AS DESCRIBED IN THE ATTACHED SOW.
GS09P15WPM0004FASONE CONSTRUCTION, INC.General Services Administration$17.67K
2014-11-032015-01-09238350IGF::OT::IGF FOR OTHER FUNCTIONS THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR AND MATERIAL TO COMPLETE THE USBC JUDGES' CHAMBER MILLWORK TOUCHUP AND REPAIR PROJECT. PER THE RFP DATED SEPTEMBER 23, 2014&AMENDMENT NO. 1 DATED OCTOBER 2, 2014. COMPLETION: 60 CALENDAR DAYS FROM NTP.
70Z03719PPSK23900FASONE CONSTRUCTION, INC.Department of Homeland Security$16.92K
2019-06-242019-07-22237110CASREP: REPLACE BLDG 20 FIREMAIN VALVE AT BASE LA/
GS09P14WPM0008FASONE CONSTRUCTION, INC.General Services Administration$16K
2014-01-172014-03-15236220IGF::OT::IGF FOR OTHER FUNCTIONS THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR AND MATERIAL TO COMPLETE THE FOLLOWING: 1. ALL WORK MUST CONFORM TO PBS P100 STANDARDS. 2. REMOVAL AND STORAGE OF FURNITURE IN WORKSTATION 24111 AND 24110 (AS REQUIRED). 3. REMOVAL AND STORE EXISTING CARPET FOR REUSE AS REQUIRED. 4. DEMOLISH EXISTING COVE BASE AS REQUIRED. 5. DEMOLITION PARTITION WALL. 6. CONSTRUCT NEW WALLS AS SHOWN. 7. RELOCATE VOICE /DATA/POWER ON NEW N WALL IN OFFICE 24110. 8. RELOCATE EXISTING WOOD DOOR AND METAL FRAME. 9. INSTALL NEW 2X2 RETURN AIR GRILLE 10. INSTALL NEW LIGHT FIXTURE TO MATCH EXISTING IN SUITE24111 11. INSTALL NEW CIRCUIT AND SWITCH WITH MOTION SENSOR IN SUITE 24111. 12. REINSTALL CARPET AND COVE BASE AS REQUIRED. 13. RELOCATE /RE-CENTER EXISTING SPRINKLER IN SUITE 24111. 14. MOVE THE AIR SUPPLY IN SUITE 24111 IN ORDER TO ACCOMODATE THE NEW WALL. 15. INSTALL NEW VERTICAL BLINDS IN SUITE 24111
47PK2018F0043FASONE CONSTRUCTION, INC.General Services Administration$15.71K
2018-06-132018-10-31236220INCLUDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO CLEAN MINERAL BUILD UP ON AREAS ASSIGNED ON GRANITE FACADE OF BUILDING AT THE U.S. COURTHOUSE, 312 N. SPRING ST., LOS ANGELES, CA.
70Z03718PPQQ13600FASONE CONSTRUCTION, INC.Department of Homeland Security$14.21K
2018-06-082018-07-22236220IGF::OT::IGF WINDOW REPLACEMENT AT CG BASE LA/LB
GS09P17WPP0012FASONE CONSTRUCTION, INC.General Services Administration$13.3K
2017-02-082017-07-13236210IGF::OT::IGF FOR OTHER FUNCTIONS CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND SUPERVISION TO TOUCH-UP AND REPAIR/REPLACE THE EXISTING MILLWORK IN EACH OF THE COURTROOMS AND JUDICIAL CHAMBERS AS DESCRIBED IN THE ATTACHED RFP SATED NOVEMBER 21, 2016.