Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 49
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0018 | HDR ENGINEERING, INC. | Department of Transportation | $43.04K | 2017-08-18 | 2019-12-29 | 541330 | IGF::OT::IGF HDR FWS JOHO DESIGN SCOPING REPORT |
| 0012 | HDR ENGINEERING, INC. | Department of Defense | $42.97K | 2013-04-16 | 2014-10-31 | 541330 | ENG. SUPPORT BUILDING 5&7 |
| DOCAB133F08SE1039 | HDR ENGINEERING, INC. | Department of Commerce | $42.9K | 2008-01-15 | 2008-04-30 | 561990 | RECOVERY PLAN EDITS |
| DTFH68064TO12068 | HDR ENGINEERING, INC. | Department of Transportation | $42.82K | 2012-06-29 | 2012-11-21 | 541330 | IGF::OT::IGF CONSTRUCTION INSPECTION SERVICES |
| 6982AF21F000017 | HDR ENGINEERING, INC. | Department of Transportation | $42.62K | 2020-12-17 | 2021-03-31 | 541330 | CLIN 00001 - D001 FUNDS RA DTFH6814E00052 POP 5/7/2014 - 5/1/2022 HI STP SR30(1) LAHAINA BYPASS 1B-2 DTFH6816D00004/TBD OBLIGATION FOR CLAIM ASSESSMENT SUPPORT POP 12/14/2020 - 3/31/2021 |
| 140P2021F0154 | HDR ENGINEERING, INC. | Department of the Interior | $41.82K | 2021-03-22 | 2021-11-12 | 541330 | YELL F6108 - HDR ENGINEERING - TITLE III |
| 0011 | HDR ENGINEERING, INC. | Department of Defense | $41.51K | 2011-08-19 | 2012-02-15 | 541310 | TASKS TO PREPARE A DESIGN-BUILD REQUEST FOR PROPOSAL CHARRETTE (D_B RFPC). |
| INR08A810677A | HDR ENGINEERING, INC. | Department of the Interior | $41.47K | 2009-08-04 | 2009-12-24 | 541330 | DESIGN SUPPORT BY ENGINEER OF RECORD DURING CONSTRUCTION OF IMPROVEMENTS TO METHOW VALLEY IRRIGATION DISTRICT-EAST DIVERSION FACILITIES NEAR TWISP, WA. |
| 0100 | HDR ENGINEERING, INC. | Department of Transportation | $41.33K | 2017-07-24 | 2018-06-30 | 541330 | IGF::CT::IGF CO FLAP SUM91(1) FREMONT PASS TRAIL DTFH6812D00013/0100 BIOLOGICAL ASSESSMENT AND BIOLOGICAL EVALUATION STUDIES BA/BE RELATED ENV. |
| DTFH6806D00007T10051 | HDR ENGINEERING, INC. | Department of Transportation | $41.08K | 2010-09-03 | 2011-06-30 | 541330 | OK RRP WIMO 10(2)ENTRANCE ROAD FINAL DESIGN DTFH68-06-D-00007/T-10-051 |
| 0091 | HDR ENGINEERING, INC. | Department of Transportation | $41.03K | 2016-09-13 | 2017-01-31 | 541330 | IGF::CT::IGF CA FTFW COLE STUDY TRAFFIC STUDY 124068-12-D-00013/0091 DTFH68-12-D-00013/0091 SCOPING SITE VISIT - TRAFFIC STUDY 551 PE FUNDS |
| 6982AF18F000101 | HDR ENGINEERING, INC. | Department of Transportation | $40.95K | 2018-05-29 | 2019-10-31 | 541330 | ENGINEERING STUDY OF BADLANDS NATIONAL PARK, SD |
| 0012 | HDR ENGINEERING, INC. | Department of Defense | $40.83K | 2009-09-15 | 2010-03-31 | 541310 | AMERICAN RIVER, FOLSOM DAM PERMANENT OPERATIONS STUDY, FOLSOM, CA: TASKS 1 THROUGH 4 |
| WE04 | HDR ENGINEERING, INC. | Department of Defense | $40.43K | 2011-09-30 | 2013-12-31 | 541330 | IAP JEBLC-FS GRAPHICS SUPPORT |
| 0029 | HDR ENGINEERING, INC. | Department of Transportation | $40.02K | 2017-08-17 | 2017-10-20 | 541330 | IGF::CT::IGF HI FTNP HAVO 10(98) CRATER RIM GEOTECH INVESTIGATION GEOTECH INVESTIGATIONS |
| 6982AF26F00025N | HDR ENGINEERING, INC. | Department of Transportation | $40K | 2026-02-17 | 2028-12-30 | 541330 | NV FLAP NYE 10(1) BOB RUUD MEM HWY & BELL VISTA AVE: POST DESIGN SERVICES |
| 6982AF21F000138 | HDR ENGINEERING, INC. | Department of Transportation | $40K | 2021-09-07 | 2023-04-30 | 541330 | NM FLAP SJU 10(1) COTTONWOOD CAMPGROUND BRIDGE POST-DESIGN SERVICES TASK ORDER FOR CONSTRUCTION SUPPORT. |
| 0034 | HDR ENGINEERING, INC. | Department of Defense | $40K | 2013-02-27 | 2013-12-31 | 541330 | ANNUAL STORM WATER SURVEY 2013 |
| INR12PD10183 | HDR ENGINEERING, INC. | Department of the Interior | $39.96K | 2012-09-17 | 2012-12-31 | 541330 | IGF::OT::IGF OTHER FUNCTIONS: DESIGN OF WATERWISE XERISCAPE LANDSCAPING PLANS FOR PROVO AREA OFFICE, PROVO UT |
| DTFH6806D00007TO09015 | HDR ENGINEERING, INC. | Department of Transportation | $39.94K | 2009-04-21 | 2009-12-30 | 541330 | AZ PRA GRCA 12(6), CVIP AND MATHER POINT |
| 0023 | HDR ENGINEERING, INC. | Department of Defense | $39.93K | 2010-07-19 | 2010-12-30 | 541330 | STORM WATER SURVEY 2010 |
| DTFH6806D00007T09015 | HDR ENGINEERING, INC. | Department of Transportation | $39.92K | 2009-04-21 | 2010-10-25 | 541330 | GRCA MATHER POINT PHASE 1 DESIGN |
| 0014 | HDR ENGINEERING, INC. | Department of Defense | $39.85K | 2009-05-12 | 2009-12-30 | 541330 | STORM WATER SITE COMPLIANCE EVALUATION |
| 6982AF20F000054 | HDR ENGINEERING, INC. | Department of Transportation | $39.78K | 2020-04-23 | 2021-09-30 | 541330 | TX ERFO SAM HOUSTON 215(1) STUBBLEFIELD ROAD THIS IS FOR POST-DESIGN SERVICES FOR THE PROPOSED REPLACEMENT OF THE STUBBLEFIELD LAKE ROAD BRIDGE IN WALKER COUNTY TEXAS. |
| INR10PD10036 | HDR ENGINEERING, INC. | Department of the Interior | $39.71K | 2010-03-24 | 2010-04-30 | 541330 | TASK ORDER FOR A 1-DAY SCOPING WORKSHOP ON THE UPCOMING YAKIMA RIVER BASIN STORAGE STUDY. THE WORKSHOP WILL BE HELD IN YAKIMA, WA. |