Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 46
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| AG05K3D100011 | HDR ENGINEERING, INC. | Department of Agriculture | $54.64K | 2010-03-29 | 2010-07-28 | 541330 | 2010 BRIDGE LOAD RATING TASK ORDER |
| 0003 | HDR ENGINEERING, INC. | Department of Defense | $54.31K | 2016-07-25 | 2017-01-12 | 541330 | IGF::OT::IGF DESIGN REPAIR ASPHALT RECYCLE CENTER MOUNTAIN HOME AFB ID |
| 6982AF19F000079 | HDR ENGINEERING, INC. | Department of Transportation | $54.2K | 2019-06-06 | 2020-12-31 | 541330 | CLIN 00001 - K200 FUNDS CA FLAP DN 511(1) KLAMATH BEACH ROAD CULTURAL, BIOLOGICAL, AND WETLANDS STUDIES AND REPORTS |
| DTFH6812D00013T13015 | HDR ENGINEERING, INC. | Department of Transportation | $54.12K | 2013-09-19 | 2014-09-09 | 541330 | IGF::CT::IGF GEOTECHNICAL FIELD INVESTIGATION (G2 ACTIVITY), INCLUDING SUBSURFACE INVESTIGATION, GEOPHYSICAL SURVEY, ROCK OUTCROP MAPPING, AND CONCRETE CORING AT BRIDGE PIER. FOR PROJECT CA BLM 1840(1) BUTTE CREEK RIVER BRIDGE CONTRACT NUMBER DTFH68-12-D-00013/T-13-015 |
| DEAT6509WA83285 | HDR ENGINEERING, INC. | Department of Energy | $54.01K | 2009-06-08 | 2009-10-30 | 541330 | PINNACLE PEAK-ROGERS TRANSMISSION LINE APPRAISAL SERVICES. |
| DEDT0005996 | HDR ENGINEERING, INC. | Department of Energy | $54K | 2013-07-18 | 2013-11-22 | 541330 | IGF::OT::IGF COMPOSITE CONDUCTOR TESTING, TE78C |
| N4008520F5274 | HDR ENGINEERING, INC. | Department of Defense | $53.8K | 2020-05-06 | 2020-12-31 | 541330 | X058 THIS CONTRACT WILL REVIEW AND STUDY OCEANA NON-MISSION USES |
| DTFH6806D00004TO100047 | HDR ENGINEERING, INC. | Department of Transportation | $53.44K | 2010-09-07 | 2010-11-13 | 541330 | CONST. INSP. SVCS. FOR CO NPS/PRA CO IMR PRES 1(10) COLORADO PARKS PAVEMENT PRESERVATION WITH HDR - HOLSOPPLE |
| DEAT6511WA47412 | HDR ENGINEERING, INC. | Department of Energy | $53.43K | 2011-04-06 | 2012-02-29 | 541330 | ARCHITECT - ENGINEERING SERVICES FOR WESTERN REGIONS - MATERIAL TESTING |
| DEDT0003815 | HDR ENGINEERING, INC. | Department of Energy | $52.91K | 2012-05-03 | 2013-04-30 | 541330 | COMPOSITE CONDUCTOR TESTING, TE78C |
| 140P2023F0087 | HDR ENGINEERING, INC. | Department of the Interior | $52.87K | 2023-02-02 | 2023-08-30 | 541330 | MEVE-317500 WETLAND DELINATION AND IMPACT ASSESSMENT SERVICES, MESA VERDE NATIONAL PARK, CORTEZ, CO |
| INP17PB00471 | HDR ENGINEERING, INC. | Department of the Interior | $52.82K | 2017-09-22 | 2018-09-21 | 541330 | IGF::OT::IGF, X:NOGRN, ASIS - 193234 - CONSTRUCTION MANAGEMENT SERVICES FOR PAVEMENT REHABILITATION |
| 140P2025F0263 | HDR ENGINEERING, INC. | Department of the Interior | $52.71K | 2025-07-24 | 2026-06-30 | 541330 | NACE 325019 FLTP - BRIDGE PRESERVATION S |
| 6982AF18F000085 | HDR ENGINEERING, INC. | Department of Transportation | $52.62K | 2018-04-26 | 2019-09-06 | 541330 | NM FLAP NM152(1) NM 152 BRIDGES SURVEY AND CREATION OF STAMPED ROW PLANS FOR ACQUISITION OF ROW. |
| DEAT6510WA44362 | HDR ENGINEERING, INC. | Department of Energy | $52.49K | 2010-04-08 | 2011-02-08 | 541330 | MATERIAL TESTING SERVICES - TESTING ALUMINUM COMPOSITE CORE CONDUCTORS |
| INF701817Y066 | HDR ENGINEERING, INC. | Department of the Interior | $52.14K | 2007-09-21 | 2007-03-31 | 541330 | DESIGN SERVICES FOR A TRAIL SYSTEM ON THE TETLIN NWR IN TOK, AK |
| AG82X9D070112 | HDR ENGINEERING, INC. | Department of Agriculture | $52.04K | 2007-07-13 | 2007-11-14 | 541330 | DESIGN OF REMOVAL OF SWEETWATER BRIDGES AND CONSTRUCTION OF FORDS ON THE SHOSHONE NF. |
| DTFH6806D00007T11057 | HDR ENGINEERING, INC. | Department of Transportation | $52K | 2011-02-09 | 2011-07-31 | 541330 | CAPULIN VOLCANO FINAL DESIGN |
| 140FGA26F0007 | HDR ENGINEERING, INC. | Department of the Interior | $51.99K | 2026-05-12 | 2027-05-12 | 541330 | VA-DAM BRG-DSAT FOR CASH LAKE DAM |
| 140P5422F0057 | HDR ENGINEERING, INC. | Department of the Interior | $51.94K | 2022-08-04 | 2023-12-31 | 541330 | AE SERVICES, REPLACE WASTE WATER SYSTEM AT LYNE HOUSE, VIRGIN ISLANDS NATIONAL PARK |
| 07T011 | HDR ENGINEERING, INC. | Department of Transportation | $51.84K | 2007-09-01 | 2007-11-30 | 541330 | CONSTRUCTION INSPECTION SERVICES |
| 0057 | HDR ENGINEERING, INC. | Department of Transportation | $51.28K | 2016-04-05 | 2018-03-31 | 541330 | IGF::CT::IGF TX FTFW LAAT 10(2) ENTRANCE ROAD AND WILDLIFE CROSSING 124068-12-D-00013/T-15-0057 DTFH68-12-D-00013/T-15-0057 POST DESIGN CONSTRUCTION SUPPORT TASK ORDER |
| 6982AF19F000076 | HDR ENGINEERING, INC. | Department of Transportation | $51.21K | 2019-05-28 | 2020-04-15 | 541330 | CA FTBR PONDEROSA BRIDGE(1) PONDEROSA BRIDGE REPLACEMENT PROJECT SCOPING AND COMPLETION OF A PROJECT DELIVERY PLAN, INCLUDING MEETINGS AND TRAVEL. THIS TASK ORDER IS FOR THE DESIGN TO REPLACEMEN THE PONDEROSA WAY BRIDGE AND REHABILITATION OF THE MOUNTAIN QUARRIES BRIDGE WITHIN THE BUREAU OF RECLAMATION (BOR) PROPERTY NEAR AUBURN, CA |
| AG82X9D110126 | HDR ENGINEERING, INC. | Department of Agriculture | $51.15K | 2011-09-01 | 2015-12-20 | 541310 | AOP DESIGN MUDDY PASS&RED SANDSTONE |
| 140P5323F0011 | HDR ENGINEERING, INC. | Department of the Interior | $51.13K | 2023-02-01 | 2023-09-29 | 541330 | REPLACE HENSLEY WATER SYSTEM A&E DESIGN |