Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 45
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| CK05 | HDR ENGINEERING, INC. | Department of Defense | $60.14K | 2013-09-10 | 2014-12-30 | 541330 | ENGINEERING SERVICES IGF::OT::IGF |
| DTFH6806D00007T08007 | HDR ENGINEERING, INC. | Department of Transportation | $59.92K | 2008-08-05 | 2009-03-16 | 541330 | A/E SERVICES |
| DEDT0004328 | HDR ENGINEERING, INC. | Department of Energy | $59.42K | 2012-08-13 | 2013-06-30 | 541330 | REACTIVE POWER STUDY TO ASSESS THE REACTIVE POWER ADEQUACY OF THE WASN BULK ELECTRIC SYSTEM |
| 140P2022F0038 | HDR ENGINEERING, INC. | Department of the Interior | $59.41K | 2022-03-03 | 2022-04-04 | 541330 | NAMA 318722 SCOPING-KICKOFF MEETING |
| 140P2025F0050 | HDR ENGINEERING, INC. | Department of the Interior | $59.06K | 2025-01-29 | 2025-08-06 | 541330 | ZION 314130 ZION-FLTP-BASE-AE_TITLE III_ |
| 0007 | HDR ENGINEERING, INC. | Department of Transportation | $59K | 2016-09-12 | 2018-09-30 | 541330 | IGF::CT::IGF CA FLAP MER CR337(1) WOLFSEN ROAD DTFH6816D00006/0007 ENV SUPPORT SERV |
| 0020 | HDR ENGINEERING, INC. | Department of Defense | $58.32K | 2009-09-29 | 2010-04-12 | 541330 | REPAIR STORM DRAINAGE BLDG 920 |
| FA489718F0040 | HDR ENGINEERING, INC. | Department of Defense | $58.32K | 2018-08-14 | 2019-04-19 | 541330 | BLDG 1333 HVAC |
| 140P2024F0042 | HDR ENGINEERING, INC. | Department of the Interior | $58.25K | 2023-11-28 | 2024-05-31 | 541330 | IMR F6108-FLTP-BRIDGE PRES PRGM AE SERVI |
| AG82X9D110127 | HDR ENGINEERING, INC. | Department of Agriculture | $57.81K | 2011-09-01 | 2015-12-20 | 541310 | LOWER LAST CHANCE AOP |
| 0021 | HDR ENGINEERING, INC. | Department of Defense | $57.77K | 2011-07-18 | 2012-06-30 | 541310 | PROJECT TITLE AND LOCATION: IMPROVE EMERGENCY DEPARTMENT ACCESS AND SECURITY, VA NORTHERN CALIFORNIA HEALTH CARE SYSTEM SACRAMENTO, CALIFORNIA; THIS TASK ORDER IS TO PROVIDE REVISIONS TO THE DB-RFP PACKAGE. |
| INR08B110677A | HDR ENGINEERING, INC. | Department of the Interior | $57.69K | 2009-09-08 | 2010-03-31 | 541330 | TASK ORDER FOR PREPARING DESIGNER'S OPERATING CRITERIA (O&M MANUALS) FOR IMPROVEMENTS MADE TO METHOW VALLEY IRRIGATION DISTRICT EAST'S FACILITIES NEAR TWISP, WA. |
| DTFH6812D00013T13007 | HDR ENGINEERING, INC. | Department of Transportation | $57.36K | 2013-03-12 | 2014-09-09 | 541330 | IGF::CT::IGF CA PFH 112-1(3) DTFH68-12-D-00013/T-13-007 THIS SCOPE OF WORK (SOW) IS TO PERFORM CULTURAL RESOURCES STUDIES FOR THE FEDERAL HIGHWAY ADMINISTRATION, CENTRAL FEDERAL LANDS HIGHWAY DIVISION (CFLHD) FOR PROPOSED BRIDGE REPLACEMENT OF THE GEORGE E. TRYON BRIDGE, CA 112-1(3). |
| AG82X9D110199 | HDR ENGINEERING, INC. | Department of Agriculture | $57.36K | 2011-09-20 | 2015-12-20 | 541310 | HDR 07-2011 SANTE FE NF COW CREEK BANK STABILIZATION DESIGN |
| INP12PB11919 | HDR ENGINEERING, INC. | Department of the Interior | $57.3K | 2012-07-27 | 2012-12-21 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - SR. COST ESTIMATING SERVICES FOR THE DENVER SERVICE CENTER, LAKEWOOD, COLORADO. |
| 0020 | HDR ENGINEERING, INC. | Department of Defense | $57.26K | 2010-09-13 | 2011-02-10 | 541310 | REPAIR/REPLACE LIGHTING-OCCUPANCY SENSORS, BEALE AFB, CA: TASKS 1 THRU 3 TO PRODUCE CONCEPT DESIGN READY-TO-ADVERTISE |
| 6982AF22F00110N | HDR ENGINEERING, INC. | Department of Transportation | $56.77K | 2022-06-27 | 2023-06-05 | 541330 | CA FLAP PLU 406(1) QUINCY JUNCTION ROAD DESIGN SERVICES TO FOR SCOPING AND 15% DESIGN |
| DTFH6806D00007T09020 | HDR ENGINEERING, INC. | Department of Transportation | $56.74K | 2009-07-20 | 2010-04-10 | 541330 | ND RRP CLSA 12(1) J. CLARK SALYER NATIONAL WILDLIFE REFUGE WETLAND DELINEATION $44,210.01 |
| HSFEHQ06F0989 | HDR ENGINEERING, INC. | Department of Homeland Security | $56.71K | 2006-09-06 | 2006-10-21 | 541330 | CUMBERLAND RAIL FEASIBILITY STUDY |
| AG82X9D090093 | HDR ENGINEERING, INC. | Department of Agriculture | $56.3K | 2009-07-09 | 2010-06-21 | 541330 | ARCHITECT ENGINEERING SERVICES BRIDGE INSPECTIONS. TASK ORDER 10-2009 NEBRASKA BESSEY PEDESTRIAN BRIDGE. THIS IAS DOCUMENT FOR INTERNAL OBLIGATION AND PAYMENT PURPOSES. CONTRACTOR IS NOT REQUIRED TO SIGN THIS DOCUMENT. ALL PTERINENT INFORMATION FOR THIS TASK ORDER IS ATTACHED TO SF252 |
| DTFH6806D4TO10032 | HDR ENGINEERING, INC. | Department of Transportation | $55.66K | 2010-05-05 | 2010-07-30 | 541330 | CONSTRUCTION INSPECTION SERVICES FOR NM PRA CAVE 10(1) CARLSBAD CAVERNS WITH HDR ENGINEERING - NICLAS |
| 140P2024F0159 | HDR ENGINEERING, INC. | Department of the Interior | $55.64K | 2024-04-01 | 2024-09-27 | 541330 | YELL 338221 - BRIDGE PRESERVATION |
| AG82X9D090006 | HDR ENGINEERING, INC. | Department of Agriculture | $55.36K | 2009-01-30 | 2010-09-30 | 541330 | BESSEY PEDESTRIAN BRIDGE - THE PRELIMINARY DESIGN WORK SHALL INCLUDE THE ANY ADDITIONAL ENGINEERING TO DEVELOP TWO ALTERNATIVES AND COMPLETE THE FINAL DESIGN WORK. THE FINAL DESIGN WORK SHALL INCLUDE SPECIFICATIONS, PLANS, ENGINEER ESTIMATE, AND ENGINEERING DESIGN CALCULATIONS FOR THE SUBSTRUCTURE UNITS SUPPORTING A PREFABRICATED WEATHERING STEEL THROUGH TRUSS TRAIL BRIDGE OVER THE MIDDLE LOUP RIVER ON THE NEBRASKA NATIONAL FOREST. DESIGN CALCULATIONS SHALL INCLUDE STRUCTURAL CALCULATIONS, ESTIMATED QUANTITY CALCULATIONS, AND UNIT COST CALCULATIONS. THE TWO ALTERNATIVES SHALL INCLUDE A SINGLE SPAN BRIDGE AND MULTIPLE SPAN BRIDGE. PIERS SHOULD CONSIST OF DRIVEN PILES WITH A CONCRETE CAP TO REDUCE THE AMOUNT OF WORK IN THE RIVER. ABUTMENTS MAY BE EITHER SPREAD FOOTINGS OR DRIVEN PILES. |
| DOCAB133F07SE4256 | HDR ENGINEERING, INC. | Department of Commerce | $55.26K | 2007-08-23 | 2010-06-30 | 541990 | PROVIDE NMFS RECOVERY PLAN |
| DTFH6812D00013T12001 | HDR ENGINEERING, INC. | Department of Transportation | $54.98K | 2012-09-17 | 2014-09-09 | 541330 | IGF::CT::IGF HFPM-12-0192; TX RRP MULE 10(1)&103(1); A/E TASK ORDER - HDR PE; HDR ENGINEERING CONTRACT# DTFH68-12-D-00013 TASK ORDER# T-12-001 |