Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 44
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 6982AF20F000051 | HDR ENGINEERING, INC. | Department of Transportation | $64.53K | 2020-04-15 | 2021-05-01 | 541330 | NM FLAP NM152(1) NM 152 BRIDGES CULTURAL RESOURCES MANAGEMENT SERVICES TO SUPPORT 106 MITIGATION FOR FHWA. NM FLAP NM 152(1) BRIDGES CULTURAL RESOURCES MITIGATION TO WITH HDR WORK PERFORMED INCLUDES MITIGATION FOR BRIDGE REMOVAL AND OTHER MOA STIPUL |
| CK06 | HDR ENGINEERING, INC. | Department of Defense | $64.43K | 2013-09-30 | 2014-12-30 | 541330 | IGF::OT::IGF PREPARE DESIGN FOR OFFICE STORAGE |
| 6982AF21F000126 | HDR ENGINEERING, INC. | Department of Transportation | $64.33K | 2021-08-26 | 2022-08-01 | 541330 | CLIN 00001 - ER24 FUNDS CA ERFO BLM 2376(3) BIZZ JOHNSON TRAIL |
| 140A1619P0643 | HDR ENGINEERING, INC. | Department of the Interior | $64.22K | 2019-09-05 | 2019-09-23 | 561210 | FIIP EVALUATION AND REPAIR OF FRPP |
| DTFH6806D7TO8004 | HDR ENGINEERING, INC. | Department of Transportation | $63.87K | 2008-06-25 | 2008-09-19 | 541330 | ENVIRONMENTAL STUDIES |
| INR11PD10090 | HDR ENGINEERING, INC. | Department of the Interior | $63.67K | 2011-09-22 | 2011-12-31 | 541330 | TASK ORDER FOR REVIEW AND UPDATE OF SPILL PREVENTION CONTROL COUNTERMEASURE PLANS FOR GRAND COULEE DAM, WASHINGTON AND HUNGRY HORSE DAM, MONTANA. |
| 0043 | HDR ENGINEERING, INC. | Department of Transportation | $63.32K | 2014-12-17 | 2015-12-31 | 541330 | IGF::CT::IGF OK TRIP WIMO SH49(1) WICHITA MOUNTAINS TRAIL DTFH68-12-D-00013 THIS IS FOR HDR TO DESIGN THIS PROJECT. |
| INF701818Y044 | HDR ENGINEERING, INC. | Department of the Interior | $63.27K | 2008-07-24 | 2009-02-18 | 541330 | A/E SERVICES - KING SALMON MAINTENANCE BLDG |
| 0001 | HDR ENGINEERING, INC. | Department of Defense | $63.1K | 2014-09-26 | 2015-04-06 | 541330 | IGF::OT::IGF REPAIR D CIRCUIT, QYZH 13-0031 A&E SERVICES |
| DTFH6806D00007T11055 | HDR ENGINEERING, INC. | Department of Transportation | $62.9K | 2011-01-19 | 2011-12-31 | 541330 | DESIGN SERVICES FOR MAWELL ROAD |
| 0014 | HDR ENGINEERING, INC. | Department of Transportation | $62.84K | 2017-09-11 | 2018-01-31 | 541330 | IGF::CT::IGF TX FLAP FM409(1) FM 409 REHABILITATION DTFH6816D00003/0014 COTA FOR CONSTRUCTION INSPECTION |
| DTFH6812D00013T14025 | HDR ENGINEERING, INC. | Department of Transportation | $62.51K | 2014-02-04 | 2014-06-15 | 541330 | IGF::CT::IGF CA BLM 1840 (1) BUTTE CREEK BRIDGE DTFH68-12-D-00013/T-14-025 HDR TASK ORDER FOR WEST BRANCH FEATHER RIVER BRIDGE INSPECTION AND LOAD RATING |
| DEDT0005399 | HDR ENGINEERING, INC. | Department of Energy | $62.28K | 2013-03-11 | 2013-07-26 | 541330 | IGF::OT::IGF ASSET MANAGEMENT - TASK ORDER |
| WE03 | HDR ENGINEERING, INC. | Department of Defense | $62.17K | 2011-09-30 | 2015-04-30 | 541330 | MASTER PLAN GRAPHIC SUPPORT |
| 6982AF19F000044 | HDR ENGINEERING, INC. | Department of Transportation | $61.86K | 2019-04-10 | 2019-07-31 | 541330 | NM FTFW RIMO 10(1) ENTRANCE ROAD AND PARKING AREAS SCOPING DESIGN SERVICES THE PROPOSED IMPROVEMENTS ARE TO REHABILITATE THE ROADS AND PARKING AREAS OF THESE SITES. |
| 140P2022F0208 | HDR ENGINEERING, INC. | Department of the Interior | $61.55K | 2022-08-23 | 2022-10-31 | 541330 | CALO 212916 ENGINEERING INSPECTION FOR WARRANTY CAPE LOOKOUT LIGHTHOUSE DOCK |
| HSTO032 | HDR ENGINEERING, INC. | Department of Homeland Security | $61.51K | 2005-09-10 | 2010-12-30 | 541330 | PMR PRELIMINARY DFIRM & FIS AND POST-PRELIMINARY PROCESSING FOR YAVAPAI COUNTY, AZ |
| 0002 | HDR ENGINEERING, INC. | Department of Defense | $61.39K | 2010-04-02 | 2010-06-17 | 541330 | TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::4230::RP# DRY CREEK EMERGENCY WATER SUPPLY LINE REROUTE (# 55) THE CONTRACTOR SHALL GATHER INFORMATION, COLLECT AND REVIEW DATA, AND PERFORM QUALITY CONTROL ANALYSES AS NECESSARY TO ASSURE THE TASKS PERFORMED BY THE ON-SITE COORDINATOR AND PLANNING MANAGEMENT REPRESENTATIVES HAVE BEEN SUCCESSFULLY COMPLETED AS DESCRIBED IN SECTION 5 OF THIS SCOPE OF WORK. |
| 07T004 | HDR ENGINEERING, INC. | Department of Transportation | $60.95K | 2007-03-26 | 2007-08-31 | 541330 | CONSTRUCTIOON INSPECTION |
| INP17PB00495 | HDR ENGINEERING, INC. | Department of the Interior | $60.86K | 2017-09-22 | 2018-08-10 | 541330 | IGF::OT::IGF GREEN INFO: NONE MIMA 189323 - REPAIR AND RESURFACE BATTLE ROAD TRAIL (CM SERVICES) MINUTEMAN NATIONAL HISTORIC PARK, CONCORD MA |
| DTFH6812D00013T14027 | HDR ENGINEERING, INC. | Department of Transportation | $60.73K | 2014-02-18 | 2014-08-31 | 541330 | IGF::CT::IGF SD FTNP BADL 10(8) CLIFF SHELF SLIDE REPAIR DTFH68-12-D-00013/T-14-027 BUTTRESS AND DRAINAGE CONSTRUCTION TO STABILIZE CLIFF SHELF LANDSLIDE. |
| 6982AF19F000098 | HDR ENGINEERING, INC. | Department of Transportation | $60.42K | 2019-07-12 | 2020-06-26 | 541330 | UT FLAP 2500(1) TAYLOR MOUNTAIN ROAD ENVIRONMENTAL COMPLIANCE STUDIES |
| HSTO0023 | HDR ENGINEERING, INC. | Department of Homeland Security | $60.4K | 2005-09-10 | 2008-09-29 | 541330 | MAP MODERIZATION PROGRAM |
| 0101 | HDR ENGINEERING, INC. | Department of Transportation | $60.36K | 2017-08-22 | 2017-12-31 | 541330 | IGF::CT::IGF NM FTFW VAOR 10(1) VALLE DE ORO ENTRANCE ROAD DTFH68-12-D-00013/0101 HDR DESIGN TO |
| INF701817Y021 | HDR ENGINEERING, INC. | Department of the Interior | $60.26K | 2007-04-13 | 2009-09-22 | 541330 | TETLIN SEATON ROADHOUSE |