Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 41
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0016 | HDR ENGINEERING, INC. | Department of Defense | $84.22K | 2009-06-10 | 2009-11-18 | 541330 | REPAIR HVAC BLDG 1013 |
| DTFH6806D4TO9017 | HDR ENGINEERING, INC. | Department of Transportation | $82.94K | 2009-07-06 | 2009-10-09 | 541330 | CONSTRUCTION INSPECTION SERVICES |
| DTFH6812D00013T14024 | HDR ENGINEERING, INC. | Department of Transportation | $82.21K | 2014-03-18 | 2014-08-31 | 541330 | IGF::CT::IGF CO FLAP 5(1) CR5 - CR3 INTERSECTION DTFH68-12-D-00013 A/E ENGINEERING SERVICES FINALIZE PS&E FROM EXISTING 95% PACKAGE. REPACKAGING TO WITH HDR (FLAP PORTION) |
| DTFH6806D4TO8015 | HDR ENGINEERING, INC. | Department of Transportation | $82.06K | 2008-07-28 | 2008-11-21 | 541330 | CONSTRUCTION INSPECTION |
| INP16PB00252 | HDR ENGINEERING, INC. | Department of the Interior | $81.84K | 2016-06-08 | 2016-10-31 | 541330 | IGF::OT::IGF, NOT GREEN, CMR SERVICES FOR FLNI 228324 WALL STABILIZATION |
| 0028 | HDR ENGINEERING, INC. | Department of Defense | $81.61K | 2011-09-13 | 2012-07-02 | 541330 | TAS::57 3400::TAS PROVIDE AN ANALYSIS OF THE WATER DISTRIBUTION SYSTEM, MHAFB, ID |
| DTFH6806D00004T06001 | HDR ENGINEERING, INC. | Department of Transportation | $81.45K | 2006-02-15 | 2006-10-31 | 541330 | CONSTRUCTION MANAGEMENT SERVICES. |
| 0007 | HDR ENGINEERING, INC. | Department of Defense | $81.37K | 2013-08-13 | 2014-07-07 | 541310 | AIR TRAFFIC CONTROL TOWER&ECO ANALYSIS |
| AG82X9D100053 | HDR ENGINEERING, INC. | Department of Agriculture | $81.3K | 2010-07-14 | 2011-07-14 | 541330 | MBR NF GRIZZLY-HELENA TRAILHEAD CROSSING |
| DTFH6806D4TO10046 | HDR ENGINEERING, INC. | Department of Transportation | $81.07K | 2010-09-15 | 2011-02-28 | 541330 | CONST. INSP. SVCS. FOR TX ERFO 16(5) BIBE 2008 SANTA ELENA CANYON RD&TX PRA BIBE 11(2) 13(4) NORTH ENTRANCE VARIOUS RD WITH HDR - GUTIERREZ |
| INR08A710677A | HDR ENGINEERING, INC. | Department of the Interior | $80.73K | 2009-06-05 | 2010-02-02 | 541330 | ASSISTANCE WITH PREPARATION OF ENVIRONMENTAL ASSESSMENT FOR CHANGES IN OPERATION OF THE ROAD ACROSS ANDERSON RANCH DAM NEAR MT. HOME IDAHO. THIS IS PHASE II OF A THREE PHASE REQUIREMENT - SEE FPDS REPORT FOR TASK ORDER 08A510677A, ALSO AWARDED TO HDR ENG. |
| DTFH6806D4TO10039 | HDR ENGINEERING, INC. | Department of Transportation | $79.97K | 2010-06-17 | 2010-10-08 | 541330 | CONSTRUCTION INSP SVCS FOR CA BLM 19006(1), 5403(1), 19043(1), 19041(1) WITH HDR - FANUCCHI |
| DEAT6508WA78960A | HDR ENGINEERING, INC. | Department of Energy | $79.81K | 2008-05-19 | 2009-02-02 | 541330 | TRANSMISSION PLANNING AND OPERATIONS ENGINEERING TITLE I SERVICES. |
| 6982AF20F000090 | HDR ENGINEERING, INC. | Department of Transportation | $79.8K | 2020-08-05 | 2021-04-15 | 541330 | AZ FLAP SR261(1) EAGAR TO CRESCENT LAKE DTFH6816D00006/6982AF20F000090 ENVIRONMENTAL STUDIES TASK ORDER. |
| 0003 | HDR ENGINEERING, INC. | Department of Defense | $79.21K | 2011-09-22 | 2012-04-14 | 541310 | ADP PANZER COMMUNITY DEVELOPMENT STUTTGA |
| 140P2025F0207 | HDR ENGINEERING, INC. | Department of the Interior | $79.09K | 2025-06-10 | 2025-08-29 | 541330 | YELL-338223-FY 26 BRIDGE PRESERVATION-AE - SCOPING |
| 0001 | HDR ENGINEERING, INC. | Department of Defense | $78.81K | 2010-03-12 | 2010-07-05 | 541330 | UTILITY SURVEY FOR SACRAMENTO DEEP WATER SHIP CHANNEL |
| W9123818F0055 | HDR ENGINEERING, INC. | Department of Defense | $78.67K | 2018-02-16 | 2019-11-13 | 541330 | IGF::CT::IGF PROJECT TITLE AND LOCATION: ENGINEERING POST CONSTRUCTION SUPPORT FOR JOINT FEDERAL PROJECT, FOLSOM DAM MODIFICATIONS, FOLSOM, CA. |
| DEAT6511WN93692 | HDR ENGINEERING, INC. | Department of Energy | $78.46K | 2011-10-01 | 2011-12-31 | 541330 | CONSTRUCTION INSPECTION SERVICES ELVERTA MAINTENANCE FACILITY PARKING AND WORKSHOP |
| 0039 | HDR ENGINEERING, INC. | Department of Transportation | $78.16K | 2014-07-03 | 2014-12-31 | 541330 | IGF::CT::IGF OK FLAP CR S4200(1) BELLE STARR PARK ROAD DTFH6812D00013 THIS IS FOR HDR TO DESIGN THE BELLE STARR PROJECT. |
| DTFH7010D00015T11003 | HDR ENGINEERING, INC. | Department of Transportation | $78.04K | 2011-03-29 | 2012-04-23 | 541330 | OR PFH 247(1), SKYLINERS ROAD IMPROVEMENTS |
| 140P2025F0225 | HDR ENGINEERING, INC. | Department of the Interior | $77.54K | 2025-06-26 | 2026-09-30 | 541330 | ROMO 327127 - BRIDGE PRESERVATION - TITLE III |
| 69056722F00120N | HDR ENGINEERING, INC. | Department of Transportation | $77.51K | 2022-08-26 | 2023-01-14 | 541330 | CA NPS PP SEKI 2018(3), PAVEMENT PRESERVATION SEKI PHASE I & II CONSULTANT INSPECTOR II (CI-II) SERVICES TASKS |
| DTFH6806D4TO11053 | HDR ENGINEERING, INC. | Department of Transportation | $77.14K | 2011-03-23 | 2011-07-16 | 541330 | CONST INSP SVCS FOR AZ PRA CACH 10(2) CANYON DE CHELLY USING TONI THOMPSON W/HDR |
| 6982AF22F000035 | HDR ENGINEERING, INC. | Department of Transportation | $76.91K | 2022-02-25 | 2022-06-30 | 541330 | CI SERVICES - RECONSTRUCTION OF THE HANAPEPE RIVER BRIDGE, HANAPEPE, KAUAI, HAWAII HI STP SR50(1) HANAPEPE RIVER BRIDGE ADMIN AND OFFICE SUPPORT |