Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 39
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0003 | HDR ENGINEERING, INC. | Department of Defense | $95.98K | 2012-09-13 | 2013-08-30 | 541310 | KC-MRPMP |
| 6982AF21F000002 | HDR ENGINEERING, INC. | Department of Transportation | $95.73K | 2020-10-20 | 2021-07-30 | 541330 | UT FTFW JOHO 10(1)-CFL GUARDRAIL AND SAFETY IMPROVEMENTS FINAL DESIGN FOR GUARDRAIL AND SAFETY IMPROVEMENTS |
| 0007 | HDR ENGINEERING, INC. | Department of Defense | $95.68K | 2007-11-08 | 2008-01-08 | 541310 | CY2005 TECH REVIEW, RD 524 & 544 |
| INF70181AY043 | HDR ENGINEERING, INC. | Department of the Interior | $95.49K | 2010-08-16 | 2011-06-30 | 541330 | DRAFTING AND DESIGN SERVICES FOR CASWELL/CROOKER CREEK FISH PASSAGE PROJECT |
| 6982AF21F000028 | HDR ENGINEERING, INC. | Department of Transportation | $94.48K | 2021-02-01 | 2022-03-31 | 541330 | NM FLAP SIE 10(1) LAKESHORE ROAD - STATE ROUTE 195 ELEPHANT BUTTE LAKE STATE PARK, NEW MEXICO ENVIRONMENTAL FIELD STUDY FOR THE NM FLAP SIE 10(1), LAKESHORE ROAD PROJECT |
| 140P2021F0146 | HDR ENGINEERING, INC. | Department of the Interior | $94.46K | 2021-08-03 | 2023-04-28 | 541330 | LAKE 158678 - TITLE III SERVICES FOR CONSTRUCT STRUCTURAL FLOOD MITIGATION FOR VISITOR & EMPLOYEE SAFETY AT COTTONWOOD COVE, LAKE MEAD NATIONAL RECREATION AREA, COTTONWOOD COVE, SEARCHLIGHT, NEVADA. |
| DTFH6806D4TO9023 | HDR ENGINEERING, INC. | Department of Transportation | $93.93K | 2009-08-06 | 2009-12-11 | 541330 | CONSTRUCTION INSPECTION SERVICES FOR CA PRA SEKI 10(9) GENERALS HIGHWAY WITH HDR - STOKES |
| DTFH6812D00013T14028 | HDR ENGINEERING, INC. | Department of Transportation | $93.87K | 2014-03-24 | 2014-12-31 | 541330 | IGF::CT::IGF OK FLAP CR E953(1) RIDGE ROUTE ROAD DTFH68-12-D-00013/T-14-028 THIS IS FOR AN A/E TO DESIGN THE PROJECT. |
| 0022 | HDR ENGINEERING, INC. | Department of Defense | $93.18K | 2016-03-15 | 2016-11-24 | 541310 | IGF::CT::IGF PROJECT TITLE AND LOCATION: ENGINEERING DESIGN AND REVIEW, SUPPORT FOR DAM RAISE GATE MODIFICATION PROJECT, FOLSOM, CA |
| INP14PB00292 | HDR ENGINEERING, INC. | Department of the Interior | $93.09K | 2014-05-19 | 2014-09-30 | 541330 | IGF::OT::IGF ELWHA WTP OPERATIONS TECHNICAL AND ESTIMATING SERVICES FOR FOLLOW-ON CONTRACT |
| 6982AF20F000004 | HDR ENGINEERING, INC. | Department of Transportation | $92.8K | 2019-10-22 | 2020-12-31 | 541330 | CLIN 00001 - K710 FUNDS NM FTFW LAVE 10(1) ENTRANCE ROAD AND VISITOR PARKING FINAL DESIGN PS&E PREPARATION |
| DTFH6806D00007T10036 | HDR ENGINEERING, INC. | Department of Transportation | $92.67K | 2010-05-05 | 2011-10-30 | 541330 | ND RRP OURA 10(2) ENTRANCE ROAD FINAL DESIGN DTFH68-06-D-00007/T-10-036 |
| DTFH6806D00007T12078 | HDR ENGINEERING, INC. | Department of Transportation | $91.65K | 2012-08-28 | 2013-09-30 | 541330 | IGF::CT::IGF HFPM-12-0177; NM RRP BILA 11(1)&12(1); A/E TASK ORDER - |
| INR09PD10R04 | HDR ENGINEERING, INC. | Department of the Interior | $91.15K | 2009-08-03 | 2010-01-31 | 541330 | TAS::14 0681::TAS THIS TASK ORDER HAS BEEN FUNDED WITH MONIES MADE AVAILABLE TO THE BUREAU OF RECLAMATION UNDER THE AMERICAN RECOVERY & REINVESTMENT ACT (ARRA). THIS TASK ORDER IS FOR CONSTRUCTION OBSERVATION ASSISTANCE DURING CONSTRUCTION OF IMPROVEMENTS TO FACILITIES OF THE THE METHOW VALLEY IRRIGATION DISTRICT EAST (MVID-E) IN THE METHOW RIVER SUBBASIN NEAR TWISP, WA. THE BUREAU PROJECT NUMBER IS 98.000. |
| DTFH6806D00007T11066 | HDR ENGINEERING, INC. | Department of Transportation | $91.09K | 2011-07-28 | 2012-06-15 | 541330 | HFPM-11-0209; ND RRP DESL 11(3) FINAL DESIGN TO-11-066; HDR TASK ORDER #DTFH68-06-D-00007/T-11-066; SCOPING AND FINAL DESIGN SERVICES |
| DTFH6806D4TO12067 | HDR ENGINEERING, INC. | Department of Transportation | $90.87K | 2012-06-29 | 2012-11-15 | 541330 | IGF::OT::IGF CONSTRUCTION INSPECTION SERVICES |
| 6982AF26F00060N | HDR ENGINEERING, INC. | Department of Transportation | $90.86K | 2026-06-08 | 2026-08-31 | 541330 | CO NP ROMO 10(98) TRAIL RIDGE GEOTECHNICAL INVESTIGATION PERFORM NONDESTRUCTIVE GEOPHYSICAL TESTING TO MAP NEAR-SURFACE BEDROCK AND TO LOCATE POTENTIAL PERMAFROST AND GROUNDWATER. |
| FA489719FA014 | HDR ENGINEERING, INC. | Department of Defense | $90.84K | 2019-05-07 | 2019-12-09 | 541330 | PLANNING CHARRETTE REPORT FOR PROVIDE POTABLE WATER SUPPLY TO AIR TRAFFIC CONTROL TOWER |
| 0001 | HDR ENGINEERING, INC. | Department of Defense | $90.56K | 2009-07-21 | 2010-08-13 | 541330 | HYDROGEOMORPHIC (HGM) MODELING AND ANALYSES, UPPER MISSISSIPPI RIVER SYSTEM FLOODPLAIN: POOL 9 RENO BOTTOMS. NESP |
| 0017 | HDR ENGINEERING, INC. | Department of Defense | $90.4K | 2006-07-19 | 2008-06-19 | 541330 | OPTION PERIOD ONE - TASK ORDER NO. 0017 |
| 6982AF23F00139N | HDR ENGINEERING, INC. | Department of Transportation | $90.37K | 2023-09-11 | 2024-03-31 | 541330 | CA NP LAVO 10(6) SULPHUR WORKS REPAIRS CONSTRUCTION INSPECTION TASK ORDER |
| 6982AF20F000072 | HDR ENGINEERING, INC. | Department of Transportation | $89.98K | 2020-05-26 | 2021-01-31 | 541330 | NV FLAP CR 196(2) SILVER PEAK ROAD DTFH6816D00003/TBD COTA AND CI-II TASK ORDER FOR CONSTRUCTION INSPECTION POP 5/26/2020 - 10/02/2020 |
| W912L310P0081 | HDR ENGINEERING, INC. | Department of Defense | $89.93K | 2010-09-20 | 2011-11-16 | 541618 | DOD/USACE, LEGACY PROJECT, HIST/CULTURAL NATIVE AMERICAN |
| INR08A510677A | HDR ENGINEERING, INC. | Department of the Interior | $89.9K | 2009-02-11 | 2010-03-31 | 541330 | ENVIRONMENTAL ASSESSMENT FOR OPERATIONAL CHANGES OF ROADS AT DEER FLAT DAMS, IDAHO |
| 6982AF19F000122 | HDR ENGINEERING, INC. | Department of Transportation | $89.39K | 2019-09-16 | 2020-06-30 | 541330 | SD FTBR BELLE FOURCHE (1) GAIDEN PT BOAT RAMP IMPROVEMENTS, SD FTFW SALA 10(1) HQ ENTRANCE ROAD AND PARKING, SD FLAP CS23A(1) DELTA-01 ACCESS ROAD, SD FLAP WAUB 10(2) WAUBAY ENTRANCE ROAD SCOPING DESIGN TASK ORDER |