Awards for “THE AEROSPACE CORPORATION”
25 awards on this page · sorted by amount · page 38
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| NNL15AA26T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $42.72K | 2014-10-27 | 2016-10-12 | 541330 | IGF::OT::IGF " NESC ELECTRICAL POWER TECHNICAL DISCIPLINE TEAM (TDT) - BATTERY REVIEW " - THE SCOPE OF THIS ASSESSMENT IS TO PROVIDE EXPERTISE IN THE AREA OF BATTERIES AND ESPECIALLY PRIMARY AND SECONDARY LITHIUM BATTERIES. THE EXPERT WILL PARTICIPATE AS A MEMBER ON THE NESC POWER SYSTEMS TDT. |
| 80LARC19F0061 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $42.54K | 2019-05-22 | 2019-06-28 | 541330 | HIGH PERFORMANCE SPACEFLIGHT COMPUTING INDEPENDENT REVIEW TEAM SUPPORT. THE OBJECTIVE OF THIS WORK IS TO PROVIDE AN INDEPENDENT ASSESSMENT OF THE COST AND SCHEDULE IN SUPPORT OF THE HIGH PERFORMANCE SPACEFLIGHT COMPUTING (HPSC) INDEPENDENT REVIEWTEAM (IRT), WHICH WILL ASSESS THE VIABILITY OF A RE-PLAN OF THE HPSC PROJECT PROVIDED BY BOEING, THE PRIME CONTRACTOR. |
| T0016 | THE AEROSPACE CORPORATION | Department of Transportation | $42.45K | 2005-02-09 | 2006-02-09 | — | GPS STUDY FOR RLVS |
| DTRTVT7012 | THE AEROSPACE CORPORATION | Department of Transportation | $42.31K | 2007-04-18 | 2008-06-30 | 541710 | AEROSPACE TASK #12 ANALYSIS OF TETHERED FLIGHT SYSTEMS |
| NNL17AA58T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $42.15K | 2017-02-08 | 2019-09-30 | 541330 | IGF::OT::IGF "NESC (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION ENGINEERING&SAFETY CENTER) PROPULSION TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PARTICIPATE AS A MEMBER OF THE NESC PROPULSION TECHNICAL DISCIPLINE TEAM. AS MEMBERS OF THIS TEAM, TECHNICAL EXPERTS FROM THE CONTRACTOR SHALL PARTICIPATE IN TEAM MEETINGS, PROVIDE EXPERT ANALYSIS, ADVICE, CONSULTATION, AND GUIDANCE SUPPORT TO THE TEAM LEADER AND PREPARE APPROPRIATE SECTIONS OF TEAM REPORTS AND FINDINGS. |
| NNG15VN57T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $42K | 2014-10-15 | 2015-01-31 | 541712 | IGF::OT::IGF A-TRAIN CONSTELLATION EXIT ORBIT ANALYSIS: WHEN MISSIONS EXIT THE 705KM CONSTELLATION IT IS REQUIRED, AT A MINIMUM, THAT THEIR ORBITS ARE LOWERED TO AN ALTITUDE THAT IS CONSIDERED SAFE BY THE CONSTELLATION MEMBERS. AS CURRENTLY DEFINED, AN EXIT ORBIT THAT IS CONSIDERED SAFE HAS AN APOGEE BELOW THE PERIGEE OF THE EXISTING CONSTELLATION MISSION ORBITS (19KM CIRCULAR BELOW THE NOMINAL 705KM OPERATIONAL ORBIT). HOWEVER, MEMBERS ARE NOW CONSIDERING AN ALTERNATE MINIMUM EXIT ORBIT ALTITUDE OF AS LITTLE AS 4KM BELOW THE CONSTELLATION. NASA FLIGHT DYNAMICS TEAMS HAVE VERIFIED THE SAFETY OF THIS CLOSER DISPOSAL LOCATION FROM AN ORBITAL MECHANICS PERSPECTIVE, BUT IF A MISSION PLACED IN THE PROPOSED 4KM-LOWER ORBIT IS SUBSEQUENTLY HIT BY ANOTHER ON-ORBIT OBJECT TO FORM A DEBRIS CLOUD, IT IS SUSPECTED THAT SOME ADDITIONAL RISK MAY BE POSED TO THE REMAINING CONSTELLATION MEMBERS. IN GENERAL AEROSPACE SHALL PROVIDE SYSTEMS ENGINEERING SUPPORT. THE CONTRACTOR SHALL PERFORM A PARAMETRIC STUDY TO ANALYZE DISPOSAL ORBITS FROM A DEBRIS PERSPECTIVE. THE CONTRACTOR WILL EXAMINE 19 KM AND 4 KM ORBITS TO DETERMINE THE INCREASED RISK OF COLLISION TO THE CONSTELLATION FROM A DEBRIS CLOUD FORMED AT EITHER ALTITUDE BY THE TERRA SPACECRAFT. THEY WILL ALSO PERFORM THIS ANALYSIS FOR BOTH A PARTIAL (10%) AND COMPLETE (100%) TERRA BREAKUP. AS A POTENTIAL FOLLOW-UP ANALYSIS, SHOULD THE ELEVATED RISKS FROM EITHER SCENARIO IN TASK ITEM #1 BE CONSIDERED POTENTIALLY PROBLEMATIC, THE CONTRACTOR MAY BE DIRECTED TO PERFORM A SECOND TASK. THEY ARE ALSO TO PERFORM A STUDY TO DETERMINE, GIVEN THE COLLISION DESCRIBED IN TASK ITEM #1, A TRADE SPACE OF RISK FACTORS VS. EXIT ALTITUDE FROM A MINIMUM OF THE PC OF THE BACKGROUND RISK AT 705 UP TO SOME HIGHER VALUE IN INCREMENTS OF 5 KM. IF DIRECTED BY THE TASK MONITOR, ONE PERSON WILL TRAVEL FROM CHANTILLY, VA TO NORFOLK, VA FOR PRESENTATION OF INTERIM ANALYSIS RESULTS TO CONSTELLATION WORKING GROUP MEETING. |
| NNL09AB75T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $41.81K | 2009-04-17 | 2010-05-31 | 541330 | "AQUARIUS STANDING REVIEW BOARD (SRB) COST SUPPORT FOR THE SYSTEM INTEGRATION REVIEW (SIR)" |
| 80MSFC24F0120 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $41.06K | 2024-09-20 | 2026-03-30 | 541715 | THE AEROSPACE CORPORATION WILL PROVIDE MSFC OBJECTIVE, NON-ADVOCATE ADVICE, ASSESSMENTS, TECHNICAL ANALYSIS, CONSULTATION, AND EVALUATION IN SUPPORT OF SMA ACTIVITIES PERFORMED AT MSFC. |
| 80GSFC19F0069 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $41.06K | 2019-07-10 | 2019-09-30 | 541712 | ESDIS SUPPORT..THE ESDIS PROJECT CODE 423 HAS THE RESPONSIBILITY TO DEVELOP AND LEAD, MONITOR, LEVERAGE, INTEROPERATE THE DATA SYSTEM ACTIVITIES OF THE OVERARCHING EOSDIS EARTH OBSERVING SYSTEM DATA INFORMATION SYSTEM IAW THE STATEMENT OF WORK (SOW). |
| 80LARC19F0126 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $40.78K | 2019-09-30 | 2021-05-28 | 541715 | SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S SENSORS AND INSTRUMENTATION TECHNICAL DISCIPLINE TEAM PROVIDES TECHNICAL EXPERTISE TO THE AGENCY FOR ISSUES RELATED TO COMPONENTS,. |
| 80LARC19F0118 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $40.74K | 2019-10-01 | 2021-05-28 | 541715 | PASSIVE THERMAL TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT.THE NASA ENGINEERING AND SAFETY CENTER'S PASSIVE THERMAL TECHNICAL DISCIPLINE TEAM (TDT) PROVIDES TECHNICAL EXPERTISE TO THE AGENCY FOR PASSIVE THERMAL CONTROL AND THERMAL PROTECTION SYSTEMS.. |
| 80LARC26F7020 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $40.36K | 2026-04-24 | 2026-09-30 | 541715 | PROVIDE TECHNICAL LEADERSHIP AND SUBJECT MATTER EXPERTISE (SME) TO THE AGENCY IN RESOLUTION OF THE SERVICE MODULE (SM) REACTION CONTROL SYSTEM (RCS) POPPET EXTRUSION INVESTIGATION. |
| 80HQTR23F0113 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $40.28K | 2023-09-01 | 2023-11-30 | 541715 | LARGE CONSTELLATION RISK ANALYSIS FOR SCIENCE MISSION DIRECTORATE (FRONT OFFICE) |
| NNM08AA95T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $40K | 2008-02-07 | 2010-05-10 | 541611 | NNM07AA96C BPA, TASK #4 ARES V SCIENCE MISSION UTILIZATION STUDY. |
| DOCT0011 | THE AEROSPACE CORPORATION | Department of Commerce | $40K | 2008-12-01 | 2009-11-30 | 927110 | TASK ORDER FOR TECHNICAL AND PROFESSIONAL SERVICES |
| NNM08AB30T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $39.85K | 2008-07-07 | 2013-01-17 | 541611 | DISCOVERY/NEW FRONTIERS GENERAL SYSTEMS ENGINEERING SUPPORT. |
| NNL09AA87T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $39.78K | 2009-01-22 | 2010-07-31 | 541330 | SOLAR DYNAMICS OBSERVATORY (SDO) PROJECT STANDING REVIEW BOARD SUPPORT |
| 80LARC19F0135 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $39.52K | 2019-10-01 | 2020-05-29 | 541715 | MULTI-PURPOSE CREW VEHICLE (MPCV) NONLINEAR DEEP DIVE THE SCOPE OF THIS EFFORT IS TO USE THIS DATA TO CORRELATE WITH THE SUBSYSTEM AND SYSTEM LEVEL MODE SURVEY TEST. ONCE A CORRELATED MODEL IS ESTABLISHED, A PROCESS CAN BE ESTABLISHED. |
| 80GRC019F0204 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $39.52K | 2019-09-24 | 2020-02-14 | 541715 | RADIOISOTOPE POWER SYSTEMS (RPS) SPECIAL STUDIES SUPPORT |
| DTRTVT3002 | THE AEROSPACE CORPORATION | Department of Transportation | $39.5K | 2013-07-31 | 2013-09-30 | 541712 | IGF::OT::IGF OTHER FUNCTIONS AWARD OF TASK ORDER NO. DTRTV-T3009 |
| 80ARC021F0092 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $39.35K | 2021-05-01 | 2021-09-30 | 541715 | THE CONTRACTOR SHALL PROVIDE ENGINEERING/SCIENTIFIC SERVICES IN SUPPORT OF THE SMALL SPACECRAFT SYSTEMS VIRTUAL INSTITUTE (S3VI) SMALL SPACECRAFT TECHNOLOGY PLAN. |
| NNA16BE39T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $39K | 2016-08-10 | 2016-11-30 | 541712 | IGF::OT::IGF PROVIDE TECHNICAL EXPERTISE TO AMES RESEARCH CENTER IN PERFORMING AN INDEPENDENT COST ESTIMATE OF TWO SIMILAR DESIGN VARIANTS OF THE RESOURCE PROSPECTOR (RP) SURFACE SEGMENT. |
| NNL06AC47T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $38.74K | 2006-06-28 | 2007-04-30 | 541330 | ENGINEERING SUPPORT TO NESC PYROVALVE INDEPENDENT TECHNICAL ASSESSMENT TEAM |
| NNL17AA70T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $38.73K | 2017-03-20 | 2019-09-30 | 541330 | IGF::OT::IGF "NESC (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION ENGINEERING&SAFETY CENTER) NON-DESTRUCTIVE EVALUATION (NDE) TECHNICAL DISCIPLINE TEAM (TDT) SUPPORT " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PARTICIPATE IN TEAM MEETINGS, PROVIDE EXPERT ADVICE AND GUIDANCE TO THE TEAM LEADER AND PREPARE APPROPRIATE SECTIONS OF TEAM REPORTS AND FINDINGS. |
| NNC14TA89T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $38.54K | 2014-08-06 | 2015-02-27 | 541712 | IGF::OT::IGF COST ESTIMATION FOR SCAN NETWORK INTEGRATION PROJECT (SNIP) END USER: MARIA BABULA, MIKE ZERNIC PERIOD OF PERFORMANCE: AUGUST 6, 2014 THRU JANURY 5, 2015 |