FedTALLY

Awards for “sierra nevada

25 awards on this page · sorted by amount · page 37

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
NNK14MA21TORBITAL TECHNOLOGIES CORPORATIONNational Aeronautics and Space Administration$3.05M
2014-01-292014-11-30541712IGF::OT::IGF PAYLOAD INTEGRATION AND OPERATIONS SUPPORT SERVICES PHASE 1. PAYLOAD DEVELOPMENT CRITICAL DESIGN FOR APH POWER DISTRIBUTION ASSEMBLY (PDA), THERMAL CONTROL SYSTEM (TCS), WATER RECOVERY AND DISTRIBUTION SYSTEM (WRADS), INTEGRATION&TEST ENGINEERING DEVELOPMENT UNIT, GUI SOFTWARE, AND SYSTEMS ENGINEERING. THIS DELIVERY ORDER IS AGAINST THE BASIC IDIQ CONTRACT NNK12MA35B. THE CONTRACTOR SHALL LEAD THE OVERALL DESIGN OF THE HARDWARE AND SOFTWARE OF THE ADVANCED PLANT HABITAT (APH). THE CONTRACTOR SHALL DEVELOP AND LEAD THE CRITICAL DESIGN FOR THE POWER DISTRIBUTION ASSEMBLY (PDA), THERMAL CONTROL SYSTEM (TCS), WATER RECOVERY AND DISTRIBUTION SYSTEM (WRADS), INTEGRATION&TESTING OF THE ENGINEERING DEVELOPMENT UNIT (EDU), GRAPHICAL USER INTERFACE (GUI) SOFTWARE, AND SYSTEMS ENGINEERING FOR THE APH PROJECT. THIS IS AN INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT FOR ADVANCED PLANT HABITAT (APH). THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS TO DESIGN, DEVELOP, CERTIFY, AND FABRICATE FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) AN ADVANCED PLANT HABITAT FACILITY THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRE DESIGN, FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY. THE CONTRACTOR SHALL PROVIDE SUPPORT SERVICES IN THREE PROPOSED PHASES. PHASE I OF THE EFFORT WILL ENCOMPASS, BUT NOT BE LIMITED TO, PROVIDING PAYLOAD DEVELOPMENT DESIGN SUPPORT TO THE NASA DESIGN TEAM IN THE FORM OF DESIGN REVIEW, CONCEPT ANALYSIS, APPLICATIONS OF PREVIOUS LESSONS LEARNED TO THE DESIGN EFFORT, AND SUPPORTING DESIGN REVIEW MEETINGS. PHASE II IS HARDWARE FABRICATION TO DEVELOP TWO FLIGHT UNITS TO IMPLEMENT THE DESIGN REQUIREMENTS DEVELOPED IN PHASE I. PHASE II WILL CONCLUDE WITH THE FINISHED FABRICATION OF AND TWO FLIGHT ADVANCED PLANT HABITAT UNITS READY FOR CERTIFICATION TESTING FOR IMPLEMENTATION ON THE ISS. PHASE III WILL PERFORM THE PAYLOAD VERIFICATION AND CERTIFICATION TESTING AND ANALYSIS REQUIRED FOR THE FLIGHT TO AND USE ON THE ISS. PHASE III WILL CONCLUDE WITH THE APH FLIGHT UNIT BEING CERTIFIED FOR FLIGHT ALONG WITH A COMPLETED LOGISTICS ANALYSIS AND SPARES PLAN AND WILL INCLUDE THE COMPLETED GROUND AND FLIGHT SAFETY REVIEWS. THE CONTRACTOR SHALL PARTICIPATE AND PROVIDE SAFETY DATA PACKAGES AND SUPPORT SAFETY REVIEW PANELS MEETINGS DURING ALL THREE PHASES.
0033SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.05M
2010-08-262013-09-29334220SKL BUY FOR AUG
H9222217C0044SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.03M
2017-02-272020-01-31541712IGF::OT::IGF HASC PHASE 1 AND 2
80NSSC19C0047SIERRA NEVADA CORPNational Aeronautics and Space Administration$3.03M
2019-06-042022-11-01541715DEVELOP AND ANALYZE A FLIGHT-LIKE DESIGN FOR A CARBOTHERMAL REACTOR SIZED TO PRODUCE 3.5 MT OF OXYGEN PER YEAR.
0161SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.02M
2009-09-252010-02-01336413RADIOS & JOINT RANGE EXTENSION
0062SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.02M
2013-06-182014-09-17336413ACAT III BIG SAFARI; AVFID C-145A BLOCK 10 RETROFITS
0178SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.99M
2010-07-092013-03-31336413BASIC BOA ORDER
FA875014C0208SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.98M
2014-09-302017-03-31541712IGF::OT::IGF DEPARTMENT OF HOMELAND SECURITY ANALYSIS VISUALIZATION AND INFORMATION SHARING
FA850925FB002SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.97M
2025-01-012026-02-28488190FUND CLINS 5032 AND 5033 FOR THE AC-130J PRECISION STRIKE PACKAGE SOFTWARE SUSTAINMENT CONTRACT
W911W617C0022SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.97M
2017-09-262020-11-30541712IGF::OT::IGF SIERRA NEVADA CORP. ~ FY16 RIF
FA862019F4113SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.96M
2019-09-062020-12-04541990BIG SAFARI
N0016411CJQ27SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.95M
2011-09-282013-06-14334511ENGINEERING SERVICES
FA862020F4065SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.94M
2020-06-302025-06-30541990BIG SAFARI
0117SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.94M
2013-08-272014-08-27336413BIG SAFARI, ACAT III, TALI
FA875016C0003SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.93M
2015-12-162020-09-30541712IGF::OT::IGF EMERGING THREAT SIGNAL EXPLOITATION (ETSE)
0116SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.93M
2009-01-062010-01-05336413BASIC BOA ORDER
0059SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.93M
2012-10-312014-01-23336413ACAT III, BIG SAFARI, COMBAT SENT, BL5 PRIMARY SENSOR
0196SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.92M
2015-07-142018-12-31336413ACAT III BIG SAFARI NSAV C-146A GPS
N0038324FS701SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.91M
2024-07-102026-06-30334220INTERFACE UNIT,COMM
0218SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.91M
2010-09-302011-06-30336413JACS V3
0023SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.9M
2010-05-032010-09-17335999SUPPLIES
0125SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.9M
2009-05-222010-11-30336413BASIC BOA ORDER
FA862023F4113SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.89M
2024-12-312026-05-31541990BIG SAFARI
FA862019F4044SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.85M
2019-02-152021-12-31541990BIG SARFARI
FA862017F4015SIERRA NEVADA COMPANY, LLCDepartment of Defense$2.82M
2016-11-292017-11-30541990ACAT III BIG SAFARI CS BL6