FedTALLY

Awards for “THE AEROSPACE CORPORATION

25 awards on this page · sorted by amount · page 37

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
80LARC19F0058THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$47.64K
2019-05-312019-11-30541330REVIEW OF ORBITAL DEBRIS ENGINEERING MODEL ORDEM THE ORBITAL DEBRIS PROGRAM OFFICE (ODPO)HAS FINISHED AN UPDATE TO THE ORBITAL DEBRIS ENGINEERING MODEL (ORDEM), WHICH IS USED TO MODEL THE ORBITAL DEBRIS ENVIRONMENT IN EARTH ORBIT.. ORDEM IS MATHEMATICAL TOOL USED TO MODEL THE ORBITAL DEBRIS POPULATION AROUND EARTH. IT IS UPDATED PERIODICALLY TO ACCOUNT FOR CHANGES IN THE ENVIRONMENT, INCORPORATE NEW MEASUREMENT DATA, AND ENHANCE ITS CAPABILITIES. THE CURRENT VERSION IS 3.0, ODPO HAS REQUESTED AN INDEPENDENT PEER REVIEW OF THE NEXT VERSION ORDEM 3.1.
80GRC020F0145THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$46.93K
2020-06-052021-01-29541715INDEPENDENT ASSESSMENT OF STRUCTURAL DESIGN OF PPE CRITICAL COMPONENTS AGAINST NASA STANDARDS
80JSC019F0288THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$46.85K
2019-10-012020-09-30541715INTERNATIONAL SPACE STATION (ISS) SPACEFLIGHT OPERATIONS AND ENGINEERING VALUE PRODUCTS AND SERVICES FOR FLIGHT OPERATIONS DIRECTORATE (FOD)(NSEETS)
DTRS5799D00062T0008THE AEROSPACE CORPORATIONDepartment of Transportation$46.64K
2004-04-082005-06-30DOCUMENT CAPABILITIES AND LIMITATIONS OF CURRENT AND POTENTIAL NDE METHODS USED FOR INSPECTING COMPONENTS BENEATH THERMAL PROTECTION SYSTEMS (TPS) - QUANTATIVE EVALUATION OF FLAW DETECTION LIMITS OF EDDY CURRENT
NNM11AB33TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$46.27K
2011-09-202013-03-03541611AEROSPACE TASK #31 RIDESHARE OPPORTUNITY ASSESSMENT FOR TECHNOLOGY DEMONSTRATION MISSIONS
NNG14VN50TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$46.15K
2013-12-062015-12-31541712IGF::OT::IGF SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (SEETS II) CONTRACT. TITLE: EXPLORERS AND HELIOPHYSICS PROJECTS DIVISION REVIEW BOARD SUPPORT. THE CONTRACTOR WILL PROVIDE SCHEDULING, PROJECT/PROGRAM MANAGEMENT, AND MULTI-DISCIPLINE ENGINEERING SUPPORT FOR THE EXPLORERS AND HELIOPHYSICS PROJECTS DIVISION REVIEWS. SUPPORT INCLUDES PRE-REVIEW ACTIVITIES (REVIEWING DOCUMENTS, TECHNICAL INTERCHANGE MEETINGS, EXECUTIVE SESSIONS, AND TELECONFERENCES) AND POST-REVIEW ACTIVITIES DISPOSITION, TRIP REPORT DEVELOPMENT, TEAM CAUCUSES, TELECONFERENCES, AND FINAL REPORT DEVELOPMENT AND REVIEW). THE RESPONSIBLE SYSTEMS REVIEW MANAGER (SRM) WILL PROVIDE ACTUAL DATES IN ADVANCE OF THE REVIEWS FOR WHICH SUPPORT IS REQUIRED AS PART OF THE PROGRESSION THROUGH THE CURRENT PERFORMANCE PERIOD. REVIEWS ARE TO BE ATTENDED BY THE APPOINTED EXPERTS AS DIRECTED BY THE RESPONSIBLE SYSTEMS REVIEW MANAGER (SRM) IN SUPPORT OF THE SYSTEMS REVIEW OFFICE. DELIVERABLES TO BE DEVELOPED IN ASSOCIATION WITH THE TASKED SUPPORT INCLUDE RFAS, TRIP REPORTS, WRITTEN INPUTS TO FINAL REVIEW BOARD SUMMARY REPORTS, AND FINAL DISPOSITION OF RFAS ONCE ACCEPTABLE RESPONSES ARE RECEIVED FROM THE PROJECT. THE ASSIGNED SUBJECT MATTER EXPERT SERVING ON THE INDEPENDENT REVIEW BOARD SHALL PARTICIPATE WITH OTHER NASA, CIVIL SERVANT, MILITARY, AND CONTRACTED BOARD MEMBERS WITH THE SAME AND/OR DIVERSE PROGRAMMATIC AND TECHNICAL EXPERTISE. THE SELECTED BOARD MEMBER SHALL COMMIT TO PARTICIPATION IN EVERY SRO REVIEW TO THE EXTENT POSSIBLE THROUGHOUT THE LIFECYCLE OF THE MISSION. COORDINATE WITH SYSTEM REVIEW OFFICE (SRO) ON REVIEW AGENDA AND ACTIVITIES. COORDINATE WITH SRO TO SUPPORT REVIEW AGENDA, TIMING, DURATION AND CONTENT. COORDINATE WITH THE SRO AND OTHER ORGANIZATIONS IN IDENTIFYING APPROPRIATE REVIEW TEAM MEMBERS. SUPPORT SRO REVIEW CHAIR OR PROJECT AS SCHEDULING AND/OR MANAGEMENT EXPERT. SUPPORT PEER REVIEWS AND SRO REVIEWS VIA TELECOM OR TRAVEL AS REQUIRED. EXERCISE RECOGNIZED LEADERSHIP DURING DEVELOPMENT LIFECYCLE MILESTONE REVIEWS AS A DESIGNATED EXPERT. PREPARE AND SUBMIT REQUESTS FOR ACTION (RFA'S) DURING REVIEWS. PREPARATION AND SUBMITTAL OF REQUESTS FOR ACTION (RFA'S) SHALL BE DELIVERED AT THE CONCLUSION OF THE REVIEW. THE PERIOD OF PERFORMANCE SHALL BE FROM DATE OF AWARD THROUGH NOVEMBER 2014. DURING THIS PERIOD OF PERFORMANCE, THE CONTRACTOR IS REQUIRED TO PARTICIPATE IN THE FOLLOWING LIFECYCLE REVIEWS: NICER PRELIMINARY DESIGN REVIEW AND THE NICER CRITICAL DESIGN REVIEW.
80ARC021F0037THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$46.01K
2021-01-012021-03-31541715THE CONTRACTOR SHALL PROVIDE ENGINEERING/SCIENTIFIC SERVICES IN SUPPORT OF THE SMALL SPACECRAFT SYSTEMS VIRTUAL INSTITUTE (S3VI) SMALL SPACECRAFT TECHNOLOGY PLAN.
0005THE AEROSPACE CORPORATIONDepartment of Transportation$45.93K
2016-12-232017-04-21541712IGF::OT::IGF LAUNCH AND REENTRY COLLISION AVOIDANCE TECHNICAL SUPPORT
NNL14AB35TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$45.87K
2014-06-272015-02-27541330IGF::OT::IGF "NESC PEER REVIEW OF SLS AND ORION PROGRAMS MT, DFI, AND DYNAMIC MC PLANS" - THE SCOPE OF THIS ASSESSMENT IS TO ASSEMBLE AN EXTERNAL (TO NASA) PEER TEAM TO REVIEW THE SPACE LAUNCH SYSTEM (SLS), GROUNDS SYSTEMS DEVELOPMENT AND OPERATIONS (GSDO), AND ORION PROGRAMS' INDIVIDUAL PLANS FOR MODAL TEST (MT), DEVELOPMENT FLIGHT INSTRUMENTATION (DFI), AND DYNAMIC MODEL CORRELATION (MC), AS WELL AS PLANS FOR INTEGRATED MT, DFI, AND MC.
NNG14VN56TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$45.33K
2014-09-122019-09-30541712IGF::OT::IGF SEETS II CONTRACT - ENTITLED: "GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE (GOES) - NOP ANOMALY INVESTIGATIONS". THESE ACTIVITIES INCLUDE, BUT ARE NOT LIMITED TO, SPECIALIZED DISCIPLINE ENGINEERING EXPERTISE EXPERIENCED IN THE DESIGN AND OPERATIONS OF SPECIFIC SUBSYSTEMS AND/OR ASSEMBLIES. AGENCY WIDE AEROSPACE PROCUREMENT. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS.
DTRS5799D00062T0010THE AEROSPACE CORPORATIONDepartment of Transportation$44.43K
2004-08-062005-10-31RF BLACKOUT DURING REENTRY
80MSFC25F7025THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$44.15K
2025-07-222025-12-31541715PROGRAMMATIC SUPPORT FOR HANDLE ITASAT2 SYSTEMS ASSESSMENT STUDY
NNM11AA92TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$44.15K
2011-09-142013-03-03541611AEROSPACE TASK #29"INDEPENDENT COST ESTIMATE FOR DEEP SPACE ATOMIC CLOCK DEMONSTRATION"
NNM11AA91TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$44.15K
2011-09-152013-03-03541611AEROSPACE TASK #28- ICE OF LDSD
NNL09AC13TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$44K
2009-04-242010-03-19541330MLCC LOW VOLTAGE FAILURE PHENOMENON
NNM12AA65TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$44K
2012-07-112014-07-08541690AEROSPACE TASK # 8, "SUPPORT TO OSIRIS-REX PROGRAM MANAGEMENT"
NNL17AA28TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.88K
2016-10-262017-05-31541330IGF::OT::IGF " CENTER BURST CRACKS PRESENT ON BEARING BALLS IN NASA MECHANISMS " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO OBTAIN ALL AVAILABLE TEST REPORTS ON DEFECTIVE BALLS, INCLUDING ROOT CAUSE AND CORRECTIVE ACTIONS; EVALUATE THE LIKELIHOOD AND ASSOCIATED RISK TO AFFECTED NASA PROGRAMS AND PROJECT; AND DEVELOP A NASA POSITION STATEMENT.
80MSFC18F0065THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.85K
2018-03-142018-12-31541712AEROSPACE TASK ORDER IN SUPPORT OF THE REAL TIME PROTEIN CRYSTAL GROWTH (RTPCG)
T0004THE AEROSPACE CORPORATIONDepartment of Transportation$43.77K
2006-01-102007-09-30541710SAMPLE EXPERIMENTAL PERMIT FOR SUBORBITAL RLV
80HQTR20F0182THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.75K
2020-07-292020-09-21541715THE NASA HELIOPHYSICS DIVISION (HPD) OF THE SCIENCE MISSION DIRECTORATE (SMD) IS SUPPORTING HELIOPHYSICS SYSTEM OBSERVATORY MISSIONS THAT ARE OPERATING BEYOND THEIR PRIME MISSION LIFETIMES.
NNL15AA37TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.71K
2014-11-042015-01-31541330IGF::OT::IGF "NESC (NASA (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION) ENGINEERING AND SAFETY CENTER) WB-57 MISSION PLANNING OF NASA EXPLORATION FLIGHT TEST (EFT)-1 OBSERVATION " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE SUPPORT TO THE NESC IMAGERY TEAM IN THE AREAS OF PRE-MISSION PLANNING AND SENSOR CONFIGURATION.
80GRC019F0197THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.64K
2019-09-202019-12-06541715NDE SUBJECT MATTER EXPERT REVIEW OF ZERO FAULT TOLERANT (0FT) AND FRACTURE CRITICAL HARDWARE (ARTEMIS-2 ONLY)
NNL09AC74TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.52K
2009-06-122009-11-30541330INDIVIDUAL ASSESSMENT PLAN, LDCM PROJECT INDEPENDENT REVIEW SUPPORT, TASK ORDER 92
80LARC18F0137THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.38K
2018-07-112019-04-30541330COMMERCIAL CREW PROGRAM CCP SPACEX 2.0 COMPOSITE OVERWRAPPED PRESSURE VESSELS COPV GRAIN SIZE THE NASA ENGINEERING AND SAFETY CENTER NESC WAS REQUESTED TO EVALUATE MATERIAL PROPERTIES FOR THE ALUMINUM LINERS FROM THE SPACEX COPV 2.0 DESIGN. TESTING WILL INCLUDE, BUT IS NOT LIMITED TO, SAMPLE PREPARATION, TENSILE TESTING, ELECTRON BACKSCATTER DIFFRACTION EBSD, DIGITAL IMAGE CORRELATION DIC, FATIGUE TESTING, AND FRACTURE TOUGHNESS TESTING.
NNL15AA70TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$43.21K
2015-02-062015-06-30541330IGF::OT::IGF " CALIBRATION OF TELEDYNE MICRODOSIMETERS AND DOSE BEHIND SELECT RADIATION SHIELDS " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO CALIBRATE 18 OF NASA'S TELEDYNE MICRODOSIMETERS TO MEASURE 14 MICRORAD INCREMENTS, ENABLING RADIATION DATA OBTAINED FROM THESE MICRODOSIMETERS FROM THE PLANNED SHIELDS-1 SPACECRAFT MISSION(S) TO BE MORE ACCURATELY REPORTED TO THE SCIENTIFIC AND ENGINEERING COMMUNITY.