FedTALLY

Awards for “SIERRA NEVADA COMPANY, LLC

25 awards on this page · sorted by amount · page 34

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
0153SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.59M
2014-09-292015-12-31336413ACAT III BIG SAFARI SPECIAL SENSOR EQUIPMENT
XR02SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.59M
2010-09-292011-09-29334511EDM
FA862018F4015SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.58M
2017-12-072018-09-30541990IGF::CT::IGF ACAT III BIG SAARI
FA869125FB014SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.58M
2025-09-252027-09-19334511ADVANCED SENSORS
0101SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.57M
2008-09-292009-09-30336413SENIOR SCOUT MATERIAL
FA862020F4091SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.56M
2020-06-292022-06-30336413BIG SAFARI
N6833518F0464SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.56M
2018-09-272022-01-31541712TESTING
0176SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.56M
2015-03-052016-02-26336413BIG SAFARI, ACAT III, IR SENSOR SPARES
FA862017F4098SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.54M
2017-08-042019-12-30541990ACAT III BIG SAFARI
0118SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.53M
2013-09-172015-08-15336413IGF::CT::IGF ACAT III BIG SAFARI, CBR CERTIFICATION
0031SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.53M
2012-05-242013-01-09336413ACAT III BOG SAFARI CASEVAC SOCAFRICA
FA862018F4025SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.52M
2018-05-182020-07-31541990ACAT III BIG SAFARI
0010SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.51M
2012-04-112012-11-15336413ACAT III, BIG SAFARI,BASELINE 5 COMBAT SENT WIDEBAND SENSORS
FA862021F4089SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.51M
2021-10-012023-04-30541990BIG SAFARI
0004SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.5M
2014-09-232015-02-03334515D.O. FOR PURCHASE OF CREW DISMOUNTED SPARES IN THE AMOUNT OF $3,499,641.15.
0193SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.49M
2010-08-112013-02-10336413SENIOR SCOUT REPLENISHMENT SPARES
HSBP1010J00940SIERRA NEVADA COMPANY, LLCDepartment of Homeland Security$3.48M
2010-10-012012-12-31336411PROTOTYPE INSTALL
N0001923F0613SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.44M
2023-08-292028-03-31334511MISD PRODUCT SUPPORT
0163SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.42M
2009-09-282010-09-30336413DRAGON SPEAR CLS
NNK15MA03TSIERRA NEVADA COMPANY, LLCNational Aeronautics and Space Administration$3.41M
2014-12-102018-01-31541712IGF::OT::IGF TASK ORDER 1 FOR ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A. AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARE S BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 MOL/M2S @ 15CM) AND LIGHT LEVEL ( MOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED. E. THERMAL CONTROL SYSTEM (TCS) (2.5) THE TCS CONSIST OF THE MODERATE TEMPERATURE LOOP (MTL) COLDPLATES ON THE ENVIRONMENTAL CONTROL SYSTEM (ECS), AVIONICS UNIT, PDA, AND GLA; IT ALSO CONSIST OF THE AVIONICS AIR ASSEMBLY (AAA) FORCED AIR FROM THE EXPRESS RACK THAT COOLS THE ORU DRAWER INSIDE THE PH CAVITY, AND INSIDE THE INTERNATIONAL SUBRACK INTERFACE STANDARD)(ISIS) DRAWER. F. WATER RECOVERY AND DELIVERY SYSTEM (WRADS) (2.6) THE WRADS STORES RECOVERED CONDENSATE WATER DELIVERED BY THE ECS, TRANSFER WATER FROM THE RECOVERY STORAGE RESERVOIR TO THE HUMIDITY CONTROL UNIT DURING PRIMING OPERATIONS, TRANSFER RECOVERED CONDENSATE WATER TO THE DISTRIBUTION STORAGE RESERVOIR, TRANSFER WATER FROM THE DISTRIBUTION STORAGE RESERVOIR TO THE SCIENCE CARRIER ROOT TRAY FOR MOISTURE CONTROL (FEEDING), AND PRIME THE SCIENCE CARRIER ROOT TRAY FOR SEED GERMINATION. G. ENVIRONMENTAL CONTROL SYSTEM (ECS) (2.7) THE ECS HAS CAPABILITY FOR AIR CIRCULATION&TEMPERATURE/HUMIDITY CONTROL, CARBON DIOXIDE CONTROL, ETHYLENE REMOVAL&AIR SAMPLE, AND ECS PRESSURE AND OXYGEN CONCENTRATION MAINTENANCE. H. SCIENCE CARRIER (2.8) THE SCIENCE CARRIER IS A REMOVABLE AND RECONFIGURABLE TRAY WITHIN THE APH THAT WILL PROVIDE THE PRINCIPLE STRUCTURAL SUPPORT AND FINAL WATER DELIVERY TO THE ROOT-ZONE FOR PLANT GROWTH EXPERIMENTATION. I. GROWTH CHAMBER (2.9) THE GROWTH CHAMBER IS THE PLANT GROW AREA. IT INTERFACES WITH THE ECS MODULES, SCIENCE CARRIER, AND THE GLA (THROUGH A WINDOW). IT ALSO CONTAINS COMPONENTS ON THE BACK OF THE CHAMBER FOR ATMOSPHERE CONTROL, IMAGING CAPABILITY (2 CAMERAS), AND A POWER&COMMUNICATION MICROCONTROLLER. J. STRUCTURAL MOUNTING ASSEMBLY (SMA) (2.10) THE SMA CONSISTS OF THE BACKPLATE, OUTER SKIN, BOTTOM PAN, AND ORU/CHAMBER MOUNTING RAILS, ORU DRAWER, AND AIR FILTRATION ASSEMBLY. 3.0 THE CONTRACTOR SHALL FABRICATE ORBITAL REPLACEMENT UNIT (ORU) FOR PH THAT CONSISTS
FA862016F0001SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.4M
2016-07-082017-09-29336413IGF::CT::IGF ACAT III BIG SAFARI URGENT SUPPORT 3013 O&M
FA862021F4307SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.39M
2021-10-012022-09-30541990BIG SAFARI
FA863010C5007SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.37M
2010-03-072013-09-06541330EAF ELINT
FA875024CB087SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.37M
2024-07-092027-09-07541715AUTOMATED KNOWLEDGE PROCESSING (AKP)
0206SIERRA NEVADA COMPANY, LLCDepartment of Defense$3.37M
2011-09-122013-03-29336413ACATIII, BIG SAFARI, RIO RATON O&M REFURBISHMENT