Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 34
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 6982AF23F00035N | HDR ENGINEERING, INC. | Department of Transportation | $139.24K | 2023-02-27 | 2024-09-30 | 541330 | NM FLAP SR35(1) GRANT COUNTY BRIDGES ENVIRONMENTAL FIELD STUDIES |
| FA489725F0008 | HDR ENGINEERING, INC. | Department of Defense | $138.93K | 2025-03-26 | 2025-08-21 | 541330 | THE PURPOSE OF THIS PROJECT IS TO PROVIDE MOUNTAIN HOME AFB WITH AN EFFECTIVE WATER DISTRIBUTION UNIDIRECTIONAL FLUSHING PLAN. THE PLAN CAN IMPROVE WATER QUALITY, IMPROVE CARRYING CAPACITY OF PIPES, AND BENEFIT THE OPERATION OF THE WATER SYSTEM. |
| CK03 | HDR ENGINEERING, INC. | Department of Defense | $138.72K | 2013-09-28 | 2014-12-30 | 541330 | IGF::OT:IGF OMA PROJECTS |
| 140P5324F0074 | HDR ENGINEERING, INC. | Department of the Interior | $138.57K | 2024-08-29 | 2026-06-30 | 541330 | 2024 BLRI PEAKS OF OTTER CG CS AE DESIGN |
| 140P2021F0262 | HDR ENGINEERING, INC. | Department of the Interior | $137.97K | 2021-08-05 | 2022-01-31 | 541330 | JOMU 311591 CONDUCT TRANSPORTATION PLANNING AND ANALYSIS FOR MOUNT WANDA CSMP DESIGN SERVICES FOR PREDESIGN (PD) AND SCHEMATIC DESIGN (SD) DOCUMENTS |
| FA489722F0020 | HDR ENGINEERING, INC. | Department of Defense | $137.35K | 2022-02-15 | 2022-08-22 | 541330 | HANGAR REDESIGN FIRE SUPPRESSION |
| 07T007 | HDR ENGINEERING, INC. | Department of Transportation | $137.28K | 2007-05-07 | 2007-11-30 | 541330 | CONSTRUCTION INSPECTION |
| AG94TZD080037 | HDR ENGINEERING, INC. | Department of Agriculture | $137K | 2008-08-11 | 2009-06-20 | 541330 | BRIDGE INSPECTION & LOAD RATEING TASK ORDER |
| INP11PD20129 | HDR ENGINEERING, INC. | Department of the Interior | $136.88K | 2011-09-16 | 2013-08-02 | 541330 | MISS 157691 ALTERNATE TRANSPORTATION PLAN, PHASE II MISSISSIPPI NATIONAL RIVER&RECREATION AREA DATA COLLECTION AND MANAGEMENT. |
| 6982AF22F00143N | HDR ENGINEERING, INC. | Department of Transportation | $136.46K | 2022-08-19 | 2023-03-31 | 541330 | CA NP MOJA 10(99) 11(99) 12(99) MOJAVE SAFETY STUDY 6982AF22D000002/6982AF22F00143N |
| 0002 | HDR ENGINEERING, INC. | Department of Defense | $136.21K | 2014-08-22 | 2015-01-05 | 541310 | IGF::CT::IGF A-E WAREHOUSE CHARRETTE IN WIESBADEN GERMANY. |
| 6982AF19F000089 | HDR ENGINEERING, INC. | Department of Transportation | $136.05K | 2019-06-19 | 2019-12-31 | 541330 | CLIN 00001 - K200 FUNDS NV FLAP 200(1) BEAVER DAM ROAD DTFH6816D00003/TBD CONSTRUCTION INSPECTION |
| 6982AF24F00062N | HDR ENGINEERING, INC. | Department of Transportation | $134.66K | 2024-07-08 | 2024-10-15 | 541330 | CA ERFO FS KLMTH 2023-2(2) GRAYBACK ROAD SUBSURFACE INVESTIGATION |
| W9123821P0018 | HDR ENGINEERING, INC. | Department of Defense | $134.32K | 2021-06-08 | 2023-02-08 | 541513 | HEC GEOEFM |
| DTFH6110F00082 | HDR ENGINEERING, INC. | Department of Transportation | $134.25K | 2010-09-14 | 2013-04-15 | 541330 | GSA ORDER: BRIDGE SAFETY TECHNICAL SUPPORT |
| 0048 | HDR ENGINEERING, INC. | Department of Transportation | $133.96K | 2014-09-17 | 2015-11-01 | 541330 | IGF::CT::IGF NM FTFW BOAP 12(2) AUTO TOUR ROUTE PARKING IMPROVEMENTS DTFH68-D-00013/0048 TASK ORDER FOR DESIGN AND 2 TS&LS |
| DTFH6812D00013T13011 | HDR ENGINEERING, INC. | Department of Transportation | $133.87K | 2013-08-06 | 2014-09-09 | 541330 | IGF::CT::IGF KS FTFW QUIV 10(3)&11(1) VARIOUS ROUTES DTFH68-D-00013/T-013-011 3R- GRAVEL AND LOW WAFER X-ING. |
| INR11PD10048 | HDR ENGINEERING, INC. | Department of the Interior | $133.27K | 2011-05-06 | 2011-09-12 | 541330 | TASK ORDER FOR PHASE I OF STRUCTURAL ANALYSIS OF 500KV SPREADING YARD TAKEOFF STRUCTURES, GRAND COULEE DAM, WASHINGTON. |
| INR08A410677A | HDR ENGINEERING, INC. | Department of the Interior | $133.08K | 2008-12-17 | 2009-12-31 | 541330 | PHASE II (DESIGNS) OF MVID-EAST FISH PASSAGE IMPROVEMENT PROJECT, METHOW RIVER SUBBASIN, WA |
| INP12PB11576 | HDR ENGINEERING, INC. | Department of the Interior | $132.96K | 2012-08-19 | 2016-08-30 | 541330 | IGF::OT::IGF CMR SERVICES FOR THE HERRING COVE AND NAUSET LIGHT BEACH FACILITIES CONSTRUCTION, CAPE COD NATIONAL SEASHORE. BARNSTABLE COUNTY, MA, CACO-154244 |
| 6982AF20F000019 | HDR ENGINEERING, INC. | Department of Transportation | $132.6K | 2020-01-06 | 2021-05-28 | 541330 | CLIN 00001 - K710 FUNDS SD FTFW SALA 10(1) HQ ENTRANCE ROAD AND PARKING |
| 6982AF21F000091 | HDR ENGINEERING, INC. | Department of Transportation | $132.26K | 2021-06-30 | 2022-04-30 | 541330 | NV FLAP 39(1) KINGS CANYON ROAD AE CI-II CONSTRUCTION INSPECTION DTFH6816D00003/TBD HDR ENGINEERING, INC. |
| 6982AF18F000104 | HDR ENGINEERING, INC. | Department of Transportation | $131.86K | 2018-06-04 | 2018-08-31 | 541330 | HI STP 360 HANA HIGHWAY BRIDGES AE SCOPING, SCOPING SV, DRAFT PDP, FINAL PDP |
| INF70181AY019 | HDR ENGINEERING, INC. | Department of the Interior | $131.44K | 2010-06-10 | 2011-06-30 | 541330 | DRAFTING & DESIGN SERVICE FOR FISH PASSAGE IN MAT-SU BOROUGH |
| INP17PB00490 | HDR ENGINEERING, INC. | Department of the Interior | $131.22K | 2017-09-22 | 2018-09-28 | 541330 | IGF::OT::IGF, X:NOGRN, GATE - 188496 - CONSTRUCTION MANAGEMENT SERVICES FOR JAMAICA BAY |