Award search
Awards for “Booz Allen”
25 awards on this page · sorted by amount · page 328
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| N0018923FR036 | BOOZ ALLEN HAMILTON INC | Department of Defense | $659.27K | 2023-09-18 | 2024-05-31 | 541512 | IT SUPPORT SERVICES |
| DTFASO10D00001CALL0012 | BOOZ ALLEN HAMILTON INC | Department of Transportation | $659.18K | 2010-07-19 | 2011-09-30 | 541620 | CONTRACT # DTFASO-10-D-00001 BAH 10-12 ZMA ENV EVALUATION AND CLEANUP TYPE 1 TASK ON AUGUST 6, 2009, A SMALL SPILL OF DIESEL FUEL (APPROXIMATELY EIGHT GALLONS) FROM A DAY TANK OCCURRED ON THE ASPHALT PARKING LOT BEHIND THE ENGINE GENERATOR BUILDING. FAA CONTRACTORS IMMEDIATELY CONTAINED AND CLEANED UP THE DIESEL FUEL SPILL BEFORE IT REACHED THE STORMWATER OUTFALL. HOWEVER, IN AN EFFORT TO CONSERVATIVELY ENSURE NO DIESEL FUEL WAS RELEASED TO SOIL VIA STORMWATER RUNOFF, FAA PERSONNEL COLLECTED FOUR SURFACE SOIL SAMPLES FROM THE GRASSY AREA SOUTH OF THE STORMWATER OUTFALL. THE DEPTH OF THESE SURFACE SOIL SAMPLES WAS FROM 0 TO 6 INCHES BELOW GROUND SURFACE (BGS). THREE OF THE FOUR SURFACE SOIL SAMPLES WERE ANALYZED FOR VOCS, TPHDRO, AND PAHS. ANALYTICAL RESULTS FROM THE SURFACE SOIL SAMPLES WERE COMPARED WITH THE FDEP CTLS FOR INDUSTRIAL SOIL. BASED ON THE COMPARISON, IT WAS DETERMINED THAT PAHS AS BENZO(A)PYRENE EQUIVALENTS EXCEEDED THE FDEP CTLS FOR INDUSTRIAL SOIL. TWO OTHER PAHS, FLUORANTHENE AND PYRENE, WERE ALSO FOUND TO EXCEED THEIR RESPECTIVE FDEP CTLS FOR INDUSTRIAL SOIL. OTHER SVOCS WERE DETECTED, BUT WERE BELOW THE FDEP CTLS FOR INDUSTRIAL SOIL. SOIL SAMPLES WERE ALSO ANALYZED FOR VOLATILE ORGANIC COMPOUNDS (VOCS) AND FLORIDA PETROLEUM RESIDUAL ORGANICS (FL PRO). CONCENTRATIONS OF VOCS WERE ALL BELOW DETECTION LIMITS, WHICH SUGGESTS THAT THE DETECTED SOIL CONTAMINATION IS UNLIKELY TO BE RELATED TO THE AUGUST 2009 SPILL OF DIESEL FUEL. CONCENTRATIONS OF FL PRO WERE BELOW THE FDEP CTLS FOR INDUSTRIAL SOIL BUT EXCEEDED CTLS FOR RESIDENTIAL SOIL. WHILE GROUNDWATER MONITORING HAS BEEN PERFORMED AT OTHER LOCATIONS AT THE ZMA ARTCC SITE, GROUNDWATER HAS NOT BEEN INVESTIGATED IN THE VICINITY OF THE STORMWATER OUTFALL WHERE PAHS WERE DETECTED IN SOIL AT CONCENTRATIONS ABOVE THE FDEP CTLS FOR INDUSTRIAL SOIL. SCOPE OF WORK: PHASE 1 PROJECT MANAGEMENT - OVERSIGHT OF PROJECT, CONTRACT MANAGEMENT, CLIENT MEETINGS, STATUS REPORTS, ETC PHASE 2 CONTINUATION OF SI TO DELINEATE EXTENT OF PAH CONTAMINATION - PREPARE A FOLLOW-UP SAP DOCUMENT TO ADDRESS SECOND SAMPLING EVENT AT THE ZMA-ARTCC; PROVIDE SAP TO FAA FOR REVIEW; ADDRESS COMMENTS TO SAP IMPLEMENTATION OF SI AND FOLLOW-UP SAP - COORDINATE WITH FAA, SUBCONTRACTORS, ETC TO ARRANGE FIELD ACTIVITIES; COORDINATE FOR ANALYSIS OF SAMPLES, ACCESS TO SITE, PLAN SITE VISIT; PREPARE HEALTH AND SAFETY PLANS; CONDUCT SAMPLING VISIT AND COLLECT SAMPLES PREPARE SAR FOR FDEP - OBTAIN ANALYTICAL DATA FROM LAB; OBTAIN DATA FROM SUBCONTRACTORS; ANALYZE DATA; WRITE DRAFT SAR REPORT; COMMUNICATE FINDINGS TO FAA; REVISE SAR REPORT BASED ON COMMENTS FROM FAA; SUBMIT DRAFT SAR REPORT TO REGULATORS; REVISE DRAFT SAR REPORT BASED ON COMMENTS FROM REGULATORS; SUBMIT FINAL SAR REPORT TO REGULATORS; DEVELOP DECISION DOCUMENT PREPARE RI REPORT - OBTAIN ANALYTICAL DATA FROM LAB; OBTAIN DATA FROM SUBCONTRACTORS; ANALYZE DATA; WRITE DRAFT RI REPORT; COMMUNICATE FINDINGS TO FAA; REVISE RI REPORT BASED ON COMMENTS FROM FAA; SUBMIT DRAFT RI REPORT TO REGULATORS; REVISE DRAFT RI REPORT BASED ON COMMENTS FROM REGULATORS; SUBMIT FINAL RI REPORT TO REGULATORS; DEVELOP DECISION DOCUMENT. PHASE 3 DEVELOP REMEDIAL ACTION PLAN - EVALUATE REMEDIAL ACTIVITIES METHODOLOGIES; DEVELOP A DRAFT REMEDIAL ACTION PLAN (RAP) THAT INCLUDES COST PROJECTIONS FOR DIFFERENT REMEDIAL ALTERNATIVES; SUBMIT RAP TO FAA FOR COMMENTS; REVISE DRAFT RAP BASED ON FAA COMMENTS; SUBMIT RAP TO FDEP; REVISE DRAFT RAP BASED ON COMMENTS FROM FDEP; SUBMIT FINAL RAP PHASE 4 STAFFING, LOE, ODCS, AND ASSUMPTIONS FOR PHASE 3, 4, 5, AND 6 ACTIVITIES CANNOT BE DETERMINED UNTIL SITE CONTAMINATION HAS BEEN ADEQUATELY DELINEATED AND A REMEDIAL ACTION ALTERNATIVE CAN BE SELECTED. REMEDIAL ACTION PLAN IMPLEMENTATION - COORDINATE WITH FAA, SUBCONTRACTORS, ETC. TO ARRANGE FIELD ACTIVITIES TO IMPLEMENT RAP; ASSESS THE NEED FOR AND PLAN THE LONG-TERM MONITORING NEEDS AND/OR OPERATION AND MAINTENANCE ACTIVITIES; COORDINATE FOR PURCHASE TAS::69 8107::TAS |
| DJD08HQ13AL046 | BOOZ ALLEN HAMILTON INC | Department of Justice | $659.17K | 2013-06-13 | 2015-08-10 | 541519 | IGF::CT::IGF IT PROJECT MANAGEMENT SUPPORT |
| 693KA924F00174 | BOOZ ALLEN HAMILTON INC | Department of Transportation | $659.11K | 2024-07-29 | 2025-07-31 | 541511 | WA-24-08926 | APP-1 | SOAR TO 1 TRANSITION ACTIVITIES AND PROGRAM MANAGEMENT | CLIN 0001 TRANS ACTIVITIES-$34,201.42 & CLIN 0002-PRGM MGMT- $624,910.13 | 693KA9-24-D-00007 |
| 0038 | BOOZ ALLEN HAMILTON ENGINEERING SERVICES, LLC | Department of Defense | $658.96K | 2015-07-29 | 2016-10-28 | 541712 | IGF::OT::IGF: C-130T ENGINEERING SERVICES |
| 1024 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658.75K | 2016-04-01 | 2017-03-31 | 541219 | IGF::OT::IGF ACCOUNTING AND FINANCIAL SERVICES |
| OPM020700025O0948 | BOOZ ALLEN HAMILTON INC | Office of Personnel Management | $658.69K | 2011-12-07 | 2012-07-31 | 611430 | HC |
| EX09 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658.51K | 2013-08-24 | 2015-08-23 | 541330 | IGF::CT::IGF STRATEGIC PLANNING AND PROGRAM SUPPORT FOR EXECUTIVE LEADERSHIP TEAM AND INDIVIDUAL COMPETENCY DEVELOPMENT IN SUPPORT OF BUPERS MILLINGTON AND NPC MANPOWER, PERSONNEL, TRAINING AND EDUCATION (MPTE) FOR EFFECTIVE PERFORMANCE AND THE EFFICIENT ALIGNMENT AND MANAGEMENT OF THE TOTAL FORCE. |
| 0004 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658.47K | 2015-09-28 | 2018-09-28 | 541611 | IGF::OT::IGF SUPPLY CHAIN SUPPORT - |
| 80HQTR19F0246 | BOOZ ALLEN HAMILTON INC | National Aeronautics and Space Administration | $658.44K | 2019-06-27 | 2020-06-30 | 541611 | THE CONTRACTOR SHALL ASSIST THE SPACE LIFE AND PHYSICAL SCIENCES RESEARCH AND APPLICATIONS (SLSPRA) DIVISION WITH THE DEVELOPMENT AND IMPLEMENTATION OF STANDARDIZED PROCESSES AND DATA ANALYSIS TOOLS. |
| 0009 | BOOZ ALLEN HAMILTON INC. | Department of Defense | $658.39K | 2010-04-01 | 2010-09-30 | 541512 | SERVICES |
| FA251705F7021 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658.23K | 2005-09-19 | 2008-09-18 | 541611 | 200511!001243!5700!FA2517!21CONS/LGC !GS23F9755H !C!N! !N!FA251705F7021! !20050919!20060918!006928857!006928857!006928857!N!BOOZ ALLEN HAMILTON INC !8283 GREENSBORO DRIVE !MCLEAN !VA!22102!58620!041!08!PETERSON AFB !EL PASO !COLORADO !+000000220973!N!N!000000000000!R421!TECHNICAL ASSISTANCE !S1 !SERVICES !000 !* !541618!E! !6! ! ! ! ! !20200930!B! ! ! ! !A! ! ! !000! ! ! ! ! ! ! !Y!C!N!N! ! ! ! ! ! !000! ! ! ! ! ! ! ! ! !0001! ! |
| 0587 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658.23K | 2009-03-23 | 2010-03-23 | 541620 | (GEITA05) NATIONWIDE PARTNERING FACILITATION SUPPORT TIER I&II |
| 0002 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658K | 2008-02-08 | 2009-02-07 | 922190 | SUPPORT OF THE DFAS CIP PROGRAM (FSS) |
| 0018 | BOOZ ALLEN HAMILTON INC | Department of Defense | $658K | 2012-09-28 | 2013-09-27 | 541511 | DMLSS-DLA TASK ORDER - FEAMS PROGRAM MANAGEMENT |
| CFP13K00025 | BOOZ ALLEN HAMILTON INC | Consumer Financial Protection Bureau | $657.99K | 2013-08-14 | 2015-02-28 | 541612 | IGF::OT::IGF DATA ANALYSIS AND HR SUPPORT SERVICES FOR WORKFORCE PLANNING |
| TEPV1214041 | BOOZ ALLEN HAMILTON INC | Department of the Treasury | $657.96K | 2012-07-13 | 2013-12-31 | 541330 | IGF::OT::IGF OTHER FUNCTIONS - FACILITY STRATEGIC ALTERNATIVE STUDY |
| 0102 | BOOZ ALLEN HAMILTON INC | Department of Defense | $657.89K | 2011-06-20 | 2012-06-19 | 541620 | AFCEE MILCON&MFH ADVISORY&ASSISTANCE |
| OPMTO0208003526 | BOOZ ALLEN HAMILTON INC | Office of Personnel Management | $657.82K | 2008-03-31 | 2008-11-21 | 611430 | TRAINING LEARNING SOLUTIONS |
| OPMTO0208003525 | BOOZ ALLEN HAMILTON INC | Office of Personnel Management | $657.82K | 2008-03-31 | 2008-10-10 | 611430 | TRAINING LEARNING SOLUTIONS |
| HQ003414C0089 | BOOZ ALLEN HAMILTON INC | Department of Defense | $657.69K | 2014-09-29 | 2017-09-29 | 541720 | RESEARCH AND STUDIES IGF::OT::IGF |
| 0034 | BOOZ ALLEN HAMILTON INC | Department of Defense | $657.44K | 2004-08-26 | 2014-08-08 | 541330 | 200411!041211!1700!BW14A !NAVAL SURFACE WARFARE CENTER, IN!N0017401D0008 !A!N! !Y!0034 ! !20040826!20050825!006928857!006928857!006928857!N!BOOZ ALLEN HAMILTON INC !BOOZ ALLEN HAMILTON INC !MC LEAN !VA!22102!48376!059!51!MCLEAN !FAIRFAX !VIRGINIA !+000000194175!N!N!000000000000!R425!ENGINEERING TECHNICAL SERVICES !S1 !SERVICES !000 !* !541330!E! !5!B!S! ! !D!20050228!B! ! !A! !A!N!U!2!001!B! !C!Y!Z! ! !N!C!N! ! ! !A!Z!A!A!000!A!C!N! ! ! ! ! ! !0001! ! |
| 80JSC019F0012 | BOOZ ALLEN HAMILTON INC | National Aeronautics and Space Administration | $657K | 2018-10-29 | 2019-05-05 | 541330 | GATEWAY DEVELOPMENT INTEGRATION ASSESSMENT |
| 0006 | BOOZ ALLEN HAMILTON INC | Department of Defense | $656.88K | 2005-07-20 | 2007-01-20 | 541690 | — |
| 0082 | BOOZ ALLEN HAMILTON INC | Social Security Administration | $656.87K | 2012-09-28 | 2013-09-27 | 541611 | IGF::OT::IGF OTHER FUNCTION CONTINUOUS MONITORING AND SYSTEM REVIEW - ENTERPRISE PENETRATION TESTING FROM EXTERNAL AND INTERNAL SCENARIOS. |