FedTALLY

Award search

Awards for “boeing

25 awards on this page · sorted by amount · page 317

Federal prime contract awards for boeing
Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
0018INSITU, INC.Department of Defense$1.09M
2014-09-092015-02-28336411UNIVERSAL SKY HOOK
0140THE BOEING COMPANYDepartment of Defense$1.09M
2008-09-292009-12-31336411NEW D.O.
W911W616C0018THE BOEING COMPANYDepartment of Defense$1.09M
2016-09-302018-03-30541712IGF::OT::IGF THE BOEING COMPANY A&AP TRADE STUDY
0238THE BOEING COMPANYDepartment of Defense$1.09M
2010-07-142012-09-30336411PRODUCTION AND RETROFIT INCORPORATION OF ENGINEERING CHANGE PROPOSAL 6343 - EXTERNAL FUEL TANK AIR PRESSURE REGULATOR
N0001415C0058THE BOEING COMPANYDepartment of Defense$1.09M
2014-10-212018-05-04541712IGF::CT::IGF ADAPTIVE AIRFRAME FOR NAVY APPLICATIONS
0002THE BOEING COMPANYDepartment of Defense$1.09M
2011-02-282011-07-25333999SUGV-310 C-IED ROBOT
SPRRA119F0325THE BOEING COMPANYDepartment of Defense$1.09M
2019-07-032026-12-07336413SPARES
5339BELL BOEING JOINT PROJECT OFFICEDepartment of Defense$1.09M
2010-06-082011-07-18336413NAVAL AVIATION.
SPE4A224F2113THE BOEING COMPANYDepartment of Defense$1.09M
2023-12-282027-11-303325108510357597!DAMPER,AIR DUCT
0004THE BOEING COMPANY (0674)Department of Defense$1.09M
2007-09-242009-11-30336413T-45 PSE
VD05THE BOEING COMPANYDepartment of Defense$1.09M
2018-05-042021-06-07336413FEEDER,AMMUNITION,M NSN: 1005-01-320-5984 MFR CAGE: 48T42 MFR PART NUMBER: 7-317233100-7
FA850517F0007THE BOEING COMPANYDepartment of Defense$1.09M
2017-05-252020-09-30541330IGF::OT::IGF F-15 ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) INTEGRATION SUPPORT ENGINEERING SERVICES
Z5DATHE BOEING COMPANYDepartment of Defense$1.09M
2015-11-202016-10-31336411F/A-18 A-D AND E/F MODIFICATIONS
0014THE BOEING COMPANYDepartment of Defense$1.09M
2011-12-132012-09-30488190OVER AND ABOVE TRAVEL AND MATERIAL
FA813426FB013THE BOEING COMPANYDepartment of Defense$1.09M
2025-12-302026-02-28488190CONTRACTOR LOGISTICS SUPPORT FOR THE C-32/C-40 AIRCRAFT FLEETS
SPRTA117F0225THE BOEING COMPANYDepartment of Defense$1.08M
2017-04-112018-11-30336413PURCHSE OF AIRCRAFT SLAT FOR THE E-3 AIRCRAFT.
0017BOEING COMPANY, THEDepartment of Defense$1.08M
2008-09-122009-12-31334220AFRC CTII SYSTEMS
N6833514C0144JEPPESEN FOREFLIGHT, INC.Department of Defense$1.08M
2014-02-072016-07-31511210SOFTWARE ACQUISITION, INSTALLATION AND TRAINING SERVICES
SPE4A717C0130BOEING DISTRIBUTION, INC.Department of Defense$1.08M
2017-02-022017-05-273364128503971206!BLADE,TURBINE ROTOR
80MSFC26C0007THE BOEING COMPANYNational Aeronautics and Space Administration$1.08M
2026-07-172027-07-16541620REIMBURSABLE SERVICES SANTA SUSANA FIELD LABORATORY (SSFL)
SP470318P0067INVENTORY LOCATOR SERVICE, LLCDepartment of Defense$1.08M
2018-10-012021-09-29519130ILS SUBSCRIPTION SERVICE
NNL14AB65TTHE BOEING COMPANYNational Aeronautics and Space Administration$1.08M
2014-09-052015-09-04541712IGF::OT::IGF SMAAART ERA STRUCTURAL CONCEPT AND TRAILING EDGE EVALUATION 1.0 INTRODUCTION/BACKGROUND: NASA CREATED THE ENVIRONMENTALLY RESPONSIBLE AVIATION (ERA) PROJECT TO EXPLORE AND DOCUMENT THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES THAT WILL REDUCE THE IMPACT OF AVIATION ON THE ENVIRONMENT. TODAY'S CURRENT GENERATION OF AIRCRAFT HAS BENEFITTED FROM NASA INVESTMENTS IN AERONAUTICAL RESEARCH THAT HAVE IMPROVED FUEL EFFICIENCIES, LOWERED NOISE LEVELS, AND REDUCED HARMFUL EMISSIONS. ALTHOUGH SUBSTANTIAL PROGRESS HAS BEEN MADE, MUCH MORE NEEDS TO BE DONE. THE NATION'S AIR TRANSPORTATION SYSTEM WILL EXPAND BY A FACTOR OF TWO OR THREE WITHIN THE NEXT TWO DECADES, POTENTIALLY INCREASING AVIATION'S IMPACT ON CLIMATE CHANGE. THE ERA PROJECT WORKS TO REDUCE THE ENVIRONMENTAL HARM THAT COULD RESULT FROM SUCH AN EXPANSION. THE ERA PROJECT IS FOCUSING ON ENVIRONMENTAL ISSUES ASSOCIATED WITH AIRCRAFT, INCLUDING FUEL BURN, EMISSIONS, AND NOISE. THE PROJECT IS EXPLORING AND DOCUMENTING THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES IDENTIFIED TO HAVE THE POTENTIAL TO MITIGATE THE IMPACT OF AVIATION ON THE ENVIRONMENT. THIS TECHNOLOGY DEVELOPMENT DIRECTLY SUPPORTS THE NATIONAL AERONAUTICS RESEARCH AND DEVELOPMENT POLICY TO DEVELOP APPROPRIATE ENVIRONMENTAL PROTECTION MEASURES TO ENSURE CONTINUED GROWTH IN AIR TRANSPORTATION. THE PRIMARY STRUCTURAL CONCEPT BEING DEVELOPED UNDER THE ERA PROJECT IN THE AIRFRAME TECHNOLOGY ELEMENT IS THE PULTRUDED ROD STITCHED EFFICIENT UNITIZED STRUCTURE (PRSEUS) DESIGN. THE PRSEUS DESIGN APPROACH IS PART OF THE ERA EFFORT TO ADDRESS FUEL BURN (C02 EMISSIONS) BY REDUCING THE WEIGHT OF ADVANCED STRUCTURES. REDUCING FUEL BURN REDUCES THE NEED TO USE RESOURCES AND REDUCES POLLUTION. PRSEUS REPRESENTS A NEW CONCEPT IN COMPOSITE DESIGN THEORY AND MANUFACTURING METHODS. IT IS A CONSCIOUS PROGRESSION AWAY FROM CONVENTIONAL LAMINATED AND BONDED ASSEMBLIES TOWARD LARGER ONE-PIECE PANEL DESIGNS WITH SEAMLESS TRANSITIONS AND DAMAGE-ARREST INTERFACES SUCH AS STITCH ROWS AND TEAR STRAPS. IT FOCUSES ON A NEW STRUCTURAL CONCEPT THAT INTEGRATES SKIN, STRINGERS, AND FRAME ELEMENTS INTO A SINGLE LARGE PANEL IN WHICH ALL ELEMENTS ARE SIMULTANEOUSLY CURED (OR CO-CURED) IN ONE HIGH-TEMPERATURE CURE CYCLE. THE RESULTING STRUCTURE IS A NOVEL SOLUTION FOR ADDRESSING THE DEMANDING FUSELAGE LOADING REQUIREMENTS INHERENT IN A PRESSURIZED SHAPED VEHICLE LIKE THE HYBRID WING BODY (HWB) CONCEPT. THE PRSEUS CONCEPT BUILDS UPON, EXTENDS, AND TAILORS THESE STRUCTURAL TECHNOLOGIES IN ORDER TO MEET THE DEMANDING CHALLENGES ASSOCIATED WITH VEHICLES WITH SHAPES AND LOAD PATHS DIFFERENT FROM TODAY S TRADITIONAL WING AND CIRCULAR FUSELAGE STRUCTURES. 2.0 SCOPE&OBJECTIVE(S): 2.1 THE SCOPE OF THIS TASK ORDER IS TO CONDUCT ANALYTICAL EVALUATIONS BASED ON A STITCHED UNITIZED COMPOSITE STRUCTURAL CONCEPT AND ADVANCED AERODYNAMICS TO COMMERCIAL TRANSPORT AIRCRAFT STRUCTURES TO DETERMINE WEIGHT REDUCTIONS AND AERODYNAMIC PERFORMANCE IMPROVEMENTS COMPARED TO STATE-OF-THE-ART AIRCRAFT WITH WINGS ATTACHED TO A BARREL FUSELAGE SECTION. ADVANCES BEYOND TRADITIONAL TUBE-WITH-WINGS AIRCRAFT UNDER CONSIDERATION INCLUDE (1) THE CONCEPT CHANGE TO GO TO A HWB DESIGN, (2) TO USE HIGH ASPECT RATIO COMPOSITE WINGS ATTACHED TO A BARREL FUSELAGE, AND (3) TO ADD ADAPTIVE COMPLIANT ELEMENTS SUCH AS A FLEXIBLE COMPOSITE TRAILING EDGE TO EITHER THE WING OF A TRADITIONAL SHAPED AIRCRAFT OR TO THE WING OF A HWB AIRCRAFT. ALL OF THESE CONCEPTS IMPROVE THE AERODYNAMIC PERFORMANCE. 2.2 THE OBJECTIVES OF THIS TASK ORDER ARE AS FOLLOWS: 1. DESCRIBE THE BENEFITS OF THE PRSEUS CONCEPT, AND OTHER STITCHED RESIN INFUSED CONCEPTS, TO A CONVENTIONAL TWIN-AISLE TUBE-AND-WING TRANSPORT VEHICLE. 2. UPDATE THE PERFORMANCE BENEFITS OF THE PRSEUS CONCEPT TO A HWB VEHICLE BASED ON THE TEST RESULTS OBTAINED SINCE THE ORIGINAL STUDY WAS PERFORMED UNDER CO
0084THE BOEING COMPANYDepartment of Defense$1.08M
2012-09-212014-03-31336411DEVELOPMENT FOR X-RAY BACKSCATTER SYSTEM
0031INSITU, INC.Department of Defense$1.08M
2015-12-222016-12-15336411IGF::OT::IGF PARTS AND TRAINING
FA810618F1005THE BOEING COMPANYDepartment of Defense$1.08M
2018-04-132021-02-15541330ENGINEERING SUPPORT SERVICE FOR MULTIPLE PLATFORMS