FedTALLY

Award search

Awards for “boeing

25 awards on this page · sorted by amount · page 301

Federal prime contract awards for boeing
Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
0010THE BOEING COMPANYDepartment of Defense$1.24M
2012-06-052012-12-31541511SOFTWARE IN-SERVICE SUPPORT FOR JENM - NDI RADIO VENDOR TECHNICAL SUPPORT
7003THE BOEING COMPANYDepartment of Defense$1.24M
2017-09-282018-08-30334220RADIO SET
FA865621F1002THE BOEING COMPANYDepartment of Defense$1.24M
2020-12-072021-12-06336414SMALL DIAMETER BOMB/LASER SMALL DIAMETER BOMB ANNUAL SERVICES
SPRRA119F0125THE BOEING COMPANYDepartment of Defense$1.24M
2019-01-082028-12-28334511ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS
0006BELL BOEING JOINT PROJECT OFFICEDepartment of Defense$1.24M
2010-09-212017-03-13336413BOA DELIVERY ORDER - WINDSHIELD WASHER SYSTEM PSE FOR V-22 AIRCRAFT SUPPORT - CPFF
Z540THE BOEING COMPANYDepartment of Defense$1.24M
2005-03-032010-09-16541330TDI
H9224126FE002THE BOEING COMPANYDepartment of Defense$1.24M
2026-01-012027-01-01336413ENGINEERING SUPPORT SERVICES (ESS) TO FOR TECHNICAL TASKINGS DIRECTIVES (TTD)
FA862821F1010THE BOEING COMPANYDepartment of Defense$1.24M
2021-03-012021-08-31336411B-52 BFAS EXEC PIT BRIDGE
0011THE BOEING COMPANYDepartment of Defense$1.24M
2014-07-282016-09-09541511IGF::OT::IGF (ACAT II DMO) F-15C MTC MP-14 STANDARDS IMPLEMENTATION
0005THE BOEING COMPANYDepartment of Defense$1.24M
2010-12-092013-11-29541712VAATE - HEETE VISION SYSTEM STUDY
NNL13AA12TTHE BOEING COMPANYNational Aeronautics and Space Administration$1.24M
2013-02-012014-04-01541712IGF::OT::IGF TASK ORDER - STATEMENT OF WORK (SOW) TASK TITLE: CONCEPT REFINEMENT OF AN ERA SUBSCALE TESTBED VEHICLE (STV) 1.0 INTRODUCTION/BACKGROUND: THE ENVIRONMENTALLY RESPONSIBLE AVIATION (ERA) PROJECT WITHIN THE INTEGRATED SYSTEMS RESEARCH PROGRAM (ISRP) OF THE NASA AERONAUTICS RESEARCH MISSION DIRECTORATE (ARMD) HAS THE RESPONSIBILITY TO EXPLORE AND DOCUMENT THE FEASIBILITY, BENEFITS, AND TECHNICAL RISK OF VEHICLE CONCEPTS AND ENABLING TECHNOLOGIES THAT WILL REDUCE THE IMPACT OF AVIATION ON THE ENVIRONMENT. THE PRIMARY GOAL OF THE ERA PROJECT IS TO SELECT VEHICLE CONCEPTS AND TECHNOLOGIES THAT CAN SIMULTANEOUSLY REDUCE FUEL BURN, NOISE, AND EMISSIONS. IN ADDITION, THE ERA PROJECT WILL IDENTIFY AND MITIGATE TECHNICAL RISK AND TRANSFER KNOWLEDGE TO THE AERONAUTICS COMMUNITY AT LARGE SO THAT NEW TECHNOLOGIES AND VEHICLE CONCEPTS CAN BE INCORPORATED INTO THE FUTURE DESIGN OF AIRCRAFT. THE ERA PROJECT CONCLUDED AN ADVANCED VEHICLE CONCEPTS (AVC) STUDY IN JANUARY 2012 UNDER NASA DRYDEN CONTRACT NND11AG03C WITH BOEING THAT IDENTIFIED ADVANCED INTEGRATED VEHICLE CONCEPTS AND COMPONENT TECHNOLOGY CONCEPTS THAT WILL ALLOW SUBSONIC TRANSPORT AIRCRAFT TO SIMULTANEOUSLY MEET THE NASA SYSTEM LEVEL GOALS OF REDUCED NOISE, EMISSIONS AND FUEL BURN IN THE 2025 (OR BEYOND) TIMEFRAME. BOEINGS FINAL REPORT UNDER THIS CONTRACT DEFINED A 65% SCALE SUBSCALE TEST VEHICLE (STV) THAT WAS ESTIMATED TO MEET ALL REQUIREMENTS IDENTIFIED AT THAT TIME. SINCE COMPLETION OF THE AVC STUDY, VARIOUS OTHER STV OPTIONS WITH ADDED, DELETED, AND MODIFIED REQUIREMENTS HAVE BEEN CONSIDERED BY BOEING. REDUCING PROGRAM COST HAS ALSO RECEIVED INCREASING EMPHASIS. THIS SOW DESCRIBES THE TASKS THAT WILL BE PERFORMED TO CONDUCT DESIGN ITERATIONS ON THE ORIGINAL STV CONCEPT TO MEET UPDATED REQUIREMENTS AND REFLECT APPROACHES THAT WILL SIGNIFICANTLY REDUCE PROGRAM COSTS. 2.0 SCOPE&OBJECTIVE(S): THE SCOPE OF THIS TASK ORDER IS AN ITERATIVE CONCEPT DESIGN STUDY FOR STV CONCEPTS. THE OBJECTIVE OF THIS TASK ORDER IS TO DEVELOP A BALANCED SET OF STV REQUIREMENTS RESULTING IN AN STV CONCEPT WITH AN INTEGRATED AND EXECUTABLE COST, SCHEDULE, AND PERFORMANCE PLAN. BALANCED REQUIREMENTS ARE DEFINED AS REQUIREMENTS DERIVED FROM A SERIES OF TRADES STUDIES AND SENSITIVITY STUDIES THAT RESULT IN A TECHNICALLY ACCEPTABLE SOLUTION AND AN EXECUTABLE PROGRAM WITH ACCEPTABLE COST AND RISK. DEVELOPING BALANCED REQUIREMENTS REQUIRES MULTIPLE ITERATIONS OF CONCEPTUAL DESIGN, PROGRAM PLANNING (I.E., SCHEDULE AND COST ESTIMATES), FOLLOWED BY CUSTOMER FEEDBACK. THE PRODUCT OF THESE ITERATIONS WILL BE A SERIES OF THREE STV CONCEPTS WHICH REFLECT VARYING LEVELS OF REQUIREMENTS, AND WHICH WILL HAVE VARYING LEVELS OF RESEARCH CONTENT, CAPABILITY, AND ASSOCIATED COSTS. 3.0 DESCRIPTION OF THE WORK/TASKS TO BE PERFORMED: 3.1 REQUIREMENTS DEVELOPMENT 3.1.1 UTILIZING THE AVC 65% SCALE STV REQUIREMENTS AND ASSOCIATED COST DRIVERS AS A STARTING POINT, THE CONTRACTOR SHALL ESTABLISH A LIST OF HIGH LEVEL REQUIREMENTS FOR AN UPDATED VERSION OF THE 65% SCALE STV CONCEPT. THIS LIST SHALL ENCOMPASS VEHICLE, MISSION, AND TECHNOLOGY DEMONSTRATION REQUIREMENTS. THE REQUIREMENTS DEVELOPMENT SHALL INCLUDE PROGRAM COST AND SCHEDULE AS KEY CONSIDERATIONS. THIS LIST SHALL REFLECT A REFINEMENT EXERCISE TO IDENTIFY AND FOCUS ON ONLY THOSE CRITICAL ENABLING TECHNOLOGIES THAT MUST BE FLOWN ON A LARGE-SCALE FLYING TESTBED. EVERY REQUIREMENT SHALL BE ACCOMPANIED WITH A JUSTIFICATION OR RATIONALE STATEMENT. THE CONTRACTOR SHALL DELIVER A DRAFT REQUIREMENTS DOCUMENT. MS WORD OR POWERPOINT FORMAT IS ACCEPTABLE. (DELIVERABLE ITEM 4.3) 3.1.2 THE NASA TECHNICAL POINT OF CONTACT (TECH POC) WILL PROVIDE WRITTEN COMMENTS FOR DRAFT REQUIREMENTS DOCUMENT VIA EMAIL TO THE CONTRACTOR WITHIN 15 BUSINESS DAYS. THE CONTRACTOR SHALL INCORPORATE THE NASA TECH POCS COMMENTS AND DELIVER AN UPDATED REQUIREMENTS DOCUMENT. MS WORD OR POWERPOINT FORMAT IS ACCEPTABLE. (DELIVE
1027THE BOEING COMPANYDepartment of Defense$1.24M
2007-12-182009-09-30541330ENGINEERING TDM TASKINGS
5098THE BOEING COMPANYDepartment of Defense$1.24M
2008-01-112008-12-083364134506516503!DESIGNATE
FA813420F1008THE BOEING COMPANYDepartment of Defense$1.24M
2020-08-292023-04-01541330ENGINEERING SERVICES IN SUPPORT OF PRESIDENTIAL AND NAOC AIRCRAFT
0004BELL BOEING JOINT PROJECT OFFICEDepartment of Defense$1.24M
2013-08-232016-07-29336413NON-RECURRING ENGINEERING (NRE)/KITS AND INSTALLS
N0001414C0010THE BOEING COMPANYDepartment of Defense$1.24M
2014-07-252020-04-01541712LONG RANGE BROAD AGENCY ANNOUNCEMENT (BAA) FOR NAVY AND MARINE CORPS SCIENCE AND TECHNOLOGY
SPRRA121F0029THE BOEING COMPANYDepartment of Defense$1.24M
2021-09-072025-05-30334511SPRPA118D002U/SPRRA121F0029 KTR: THE BOEING COMPANY 48T42 NOUN: SUPPORT ASSEMBLY,AC NSN:1615-01-0527-3781 PN:7-311525062-19 QTY:100 UNIT:$9,406.65 TOTAL:$940,665.00
N0038319FPX03INSITU, INC.Department of Defense$1.24M
2019-07-182023-02-24336411PROP MOD ASSY,SHIEL
0001THE BOEING COMPANYDepartment of Defense$1.24M
2008-12-192013-09-30541330STUDIES & ANALYSIS
SD3YTHE BOEING COMPANYDepartment of Defense$1.23M
2011-04-252012-12-21336411OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING
GCK7THE BOEING COMPANYDepartment of Defense$1.23M
2013-11-152017-02-28336413RIB,STIFFENER,AIRCR
FA821324F1003THE BOEING COMPANYDepartment of Defense$1.23M
2024-06-112026-10-11332993ACQUISITON OF JDAM SPARES AND NWR
EF18BOEING AEROSPACE OPERATIONS, INC.Department of Defense$1.23M
2016-12-162017-12-31541330IGF::CT::IGF CETS, 17RS, FW30633 NO823,5582 WI5532,5535
0119THE BOEING COMPANY (0674)Department of Defense$1.23M
2010-09-222012-01-01336413AIM-120D
FA872622F0126THE BOEING COMPANYDepartment of Defense$1.23M
2022-08-252022-11-25541330JOINT INTEGRATED AIR AND MISSILE DEFENSE ORGANIZATION (JIAMDO) DELIVERY ORDER WEAPONS INSTRUCTOR COURSE (WIC)