FedTALLY

Awards for “HDR ENGINEERING, INC.

25 awards on this page · sorted by amount · page 3

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
W912DY22F0150HDR ENGINEERING, INC.Department of Defense$2.39M
2022-03-252023-03-24541310BUILDER ANDERSON AFB GUAM
N4008524F6550HDR ENGINEERING, INC.Department of Defense$2.39M
2024-09-172026-05-01541330X001 P271 E-XX CCD
W912BV25FA042HDR ENGINEERING, INC.Department of Defense$2.35M
2025-09-082027-03-07541320FY25 ANDERSEN AIR FORCE BASE, GUAM INSTALLATION PLANNING SUPPORT
W912DR23F0390HDR ENGINEERING, INC.Department of Defense$2.3M
2023-09-282028-09-26541330SCOPE OF ARCHITECT/ENGINEER SERVICES FOR THE PREPARATION OF A REQUEST FOR PROPOSAL (RFP)FOR THE DESIGN-BUILD (DB) ACQUISITION OF REPAIR BY REPLACEMENT OF THE STEAM STERILIZATION PLANT FORT DETRICK, MARYLAND
W912DY22F0558HDR ENGINEERING, INC.Department of Defense$2.28M
2022-09-302023-09-29541310BASE 9 MONTH: HQAMC G4 FACILITIES SME
0018HDR ENGINEERING, INC.Department of Defense$2.27M
2014-09-302016-09-22541310UPPER GUAD 7&8
140R1020F0003HDR ENGINEERING, INC.Department of the Interior$2.27M
2020-02-062023-03-15541330GC ARC FLASH MITIGATION MASTER PLAN
0001HDR ENGINEERING, INC.Department of Defense$2.23M
2016-09-282022-09-13541330REACH 1 LEVEE&UNION PACIFIC RAILROAD CLOSURE DESIGN IGF::OT::IGF
W912BV23F0187HDR ENGINEERING, INC.Department of Defense$2.22M
2023-09-262027-09-26541320BASE TASK--EIS T-7A VANCE-SHEPPARD AFBS
W912DR20F0316HDR ENGINEERING, INC.Department of Defense$2.21M
2020-06-192026-01-18541330MEDICAL WASTE INCINERATOR, FORT DETRICK, MARYLAND
W912BV25F0124HDR ENGINEERING, INC.Department of Defense$2.2M
2025-09-262028-09-25541320PACIFIC POSTURE MASTER PLANNING SUPPORT - SOUTHWESTERN DIVISION (SWD) REGIONAL PLANNING AND ENVIRONMENTAL CENTER (RPEC)
6982AF19F000006HDR ENGINEERING, INC.Department of Transportation$2.17M
2018-11-152024-12-31541330HI STP 360 HANA HIGHWAY BRIDGES TASK ORDER TO BEGIN ENVIRONMENTAL SERVICES FOR HANA HIGHWAY PE DEVELOPMENT
INR13PD10022HDR ENGINEERING, INC.Department of the Interior$2.12M
2013-02-112015-09-15541330IGF::OT::IGF TASK ORDER FOR PHASE II OF EARLY ACTION ITEMS FOR THE YAKIMA RIVER BASIN INTEGRATED WATER RESOURCE MANAGEMENT PLAN
W912DY22F0472HDR ENGINEERING, INC.Department of Defense$2.08M
2022-09-302024-05-29541310EVCF INST SITE DEVELOP PLAN SCHOFIELD HI
N4008018F4809HDR ENGINEERING, INC.Department of Defense$2.03M
2018-09-282022-09-30541330IDIQ PLANNING AND ENGINEERING SERVICES
N3319118F4378HDR ENGINEERING, INC.Department of Defense$2.01M
2018-09-202021-06-30541330IGF::OT::IGF X040 THEATER LOGISTICS AND ORDNANCE PLAN
W912DY22F0471HDR ENGINEERING, INC.Department of Defense$2M
2022-09-272024-05-26541310IMCOM EV PACKAGE 2
69056723F00055NHDR ENGINEERING, INC.Department of Transportation$1.99M
2023-06-022026-02-14541330OR DOT 18(1), OR58 COAST FORK WILLAMETTE RIVER TO LOWER SALT CR BRIDGES CI/CPE SERVICES
FA890323F0093HDR ENGINEERING, INC.Department of Defense$1.99M
2023-06-132026-06-15541330DESIGN EFSO REPAIRS AT VARIOUS FUELS FACILITIES AT ANDERSEN AFB, GUAM
W9123819F0059HDR ENGINEERING, INC.Department of Defense$1.96M
2019-07-102024-06-15541330PROJECT TITLE AND LOCATION: CONSTRUCTION PHASE SERVICES FOR SUTTER BASIN FRMP, CYPRESS AVE TO TUDOR ROAD, SUTTER COUNTY.
W9127818F0670HDR ENGINEERING, INC.Department of Defense$1.94M
2018-09-262020-03-23541330IMCOM BUILDER
W9123818F0052HDR ENGINEERING, INC.Department of Defense$1.91M
2018-02-062021-08-31541330IGF::CT::IGF PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH B, SACRAMENTO COUNTY, CA (60% THRU FINAL DESIGN).
140R1023F0003HDR ENGINEERING, INC.Department of the Interior$1.83M
2022-11-082027-11-07541330YRBWEP FACILITATION AND TECHNICAL SUPPORT
6982AF25F00077NHDR ENGINEERING, INC.Department of Transportation$1.82M
2025-08-112026-09-30541330ND NP THRO 10(5) NORTH UNIT LOOP ROAD SCOPING THROUGH 30% DESIGN TASK ORDER ROAD CONSTRUCTION DESIGN
140D7020FA001HDR ENGINEERING, INC.Department of the Interior$1.81M
2019-11-212021-10-15541330CONDITION ASSESSMENT FOR BIA POWER PROJ