Award search
Awards for “JACOBS ENGINEERING GROUP INC.”
25 awards on this page · sorted by amount · page 256
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 68HERC20F0362 | AMENTUM TECHNOLOGY, INC. | Environmental Protection Agency | $41.99K | 2020-08-04 | 2021-07-31 | 541715 | TASK ORDER FOR CONTRACT 68HERC20D0018 ENTITLED P-TAQS THE KEY OBJECTIVES OF THIS TASK ORDER ARE TO 1) CONTINUE THE FIELD MEASUREMENT CAMPAIGN; 2) DOWNLOAD DATA FROM VIPER AND PLOT THAT DATA TO MONITOR SENSOR PACKAGE PERFORMANCE; 3) IF NECESSARY, AD |
| 0019 | CH2M HILL INC | Environmental Protection Agency | $41.98K | 2014-05-01 | 2014-12-31 | 562910 | UPPER TRENTON CHANNEL REMEDIAL DESIGN SUPPORT FOR THE POINT MOUILLEE SECTION IGF::OT::IGF |
| DTFH6806D00010T08009 | CARTER AND BURGESS INCORPORATED | Department of Transportation | $41.92K | 2008-08-13 | 2010-12-01 | 541330 | A/E SERVICES |
| 70FB8020F00000043 | CH2M HILL - CDM PA-TAC RECOVERY SERVICES | Department of Homeland Security | $41.9K | 2020-06-01 | 2021-05-31 | 541611 | CH2M HILL-CDM PA-TAC RECOVERY SVCS (PA-TAC IV TECHNICAL SUPPORT FOR THE SCHEDULE OF EQUIPMENT UPDATE). (HYBRID - TIME&MATERIALS AND COST REIMBURSEMENT). |
| 69056718F000105 | JACOBS ENGINEERING GROUP INC. | Department of Transportation | $41.72K | 2018-09-10 | 2019-08-02 | 541330 | ID ADAMS 63(5), COUNCIL/CUPRUM ROAD SURFACE PRESERVATION&ID ADAMS 98(2), GOOSE LAKE ROAD SURFACE PRESERVATION, MP 0 TO 4.1 INTERMEDIATE THROUGH FINAL DESIGN PHASES. |
| G804 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $41.66K | 2013-06-10 | 2014-06-10 | 541310 | CAMP BUCKNER BATHHOUSE |
| W91CRB20F0120 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $41.64K | 2020-03-06 | 2020-09-30 | 541330 | ATEF VALIDATION AND SAFETY ANALYSIS |
| GSP0609GZ5026 | JACOBS ENGINEERING GROUP INC. | General Services Administration | $41.63K | 2009-05-13 | 2015-05-13 | 236220 | WORK ORDER 22 |
| 05GA0A22K0141 | JACOBS ENGINEERING GROUP INC. | Government Accountability Office | $41.62K | 2022-09-16 | 2024-09-15 | 541330 | THE CONTRACTOR WILL PROVIDE CONSTRUCTION MANAGEMENT SERVICES TO MAKE REPAIRS TO INTERIOR AND EXTERIOR CONDITIONS PRESENTED IN DESIGN FOR THE PARKING GARAGE STRUCTURAL REPAIRS. |
| W9127819F0409 | CH2M HILL, INC | Department of Defense | $41.46K | 2019-09-16 | 2020-11-13 | 541330 | RAYSTOWN, PA UPGRADE DESIGN |
| 0013 | CARTER & BURGESS, INC | Department of Defense | $41.45K | 2008-08-11 | 2008-09-12 | 541310 | RKMF 08-0017, CONSTRUCT ADMINISTRATIVE FACILITY, RED FLAG, NELLIS AFB, NV |
| 0080 | JACOBS PROJECT MANAGEMENT CO | National Archives and Records Administration | $41K | 2013-04-18 | 2014-11-01 | 236220 | IGF::OT::IGF ANCHORAGE SHELVING |
| 6GG2 | FEDERAL NETWORK SYSTEMS LLC | Department of Defense | $40.99K | 2014-10-01 | 2015-09-30 | 334210 | ADP COMPONENTS |
| 0D04 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $40.98K | 2011-09-30 | 2011-10-22 | 541310 | GIS SERVICES PER SOW |
| W912PP22F0008 | JACOBS ENGINEERING GROUP INC | Department of Defense | $40.94K | 2022-01-25 | 2022-06-17 | 541330 | TASK ORDER W912PP22F0008 - DESIGN BUILD BIOENVIRONMENTAL ENGINEERING FACILITY, KIRTLAND AIR FORCE BASE (KAFB), NEW MEXICO |
| DTFH6806D00010T06004 | CARTER AND BURGESS INCORPORATED | Department of Transportation | $40.86K | 2006-07-14 | 2009-06-30 | 541330 | PROJECT DEVELOPMENT SERVICES |
| 0003 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $40.83K | 2014-03-07 | 2014-05-30 | 541330 | IGF::OT::IGF LOWER GRANITE RSW CONDITION INSPECTION |
| 0012 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $40.8K | 2014-08-14 | 2014-11-12 | 541330 | IGF::OT::IGF REPLACEMENT OF RAW WATER INTAKE VALVE. A&E SERVICES [BASE YEAR] 2014-2015 |
| 0009 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $40.79K | 2010-07-20 | 2011-07-15 | 541330 | ENGINEERING SUPPORT FOR DWORSHAK DAM SAFETY MONITORING SYSTEM UPGRADE PROJECT |
| W91ZRU18F5000 | CH2M HILL - HDR JV | Department of Defense | $40.73K | 2018-05-07 | 2019-02-28 | 541330 | TYPE C SERVICES |
| NND09RR31T | JACOBS TECHNOLOGY INC | National Aeronautics and Space Administration | $40.72K | 2009-02-01 | 2011-01-31 | 541712 | TASK ORDER NO. NND09RR31T AERODYNAMIC HEATING METHODOLOGY THIS TASK PROVIDES FOR THE ENGINEERING AND TECHNICAL SERVICES TO SUPPORT THE DRYDEN AEROSTRUCTURES BRANCH IN CONDUCTING FLIGHT RESEARCH ON ADVANCED SUPERSONIC AND HYPERSONIC AIRCRAFT, AND PERFORMS LABORATORY TESTS ON ADVANCED HIGH TEMPERATURE STRUCTURAL CONCEPTS. THE GOAL IS THE DOCUMENTATION OF TRANSIENT AERODYNAMIC HEATING METHODS FOR HIGH-SPEED AEROSPACE VEHICLES. IN ORDER TO SUCCESSFULLY CONDUCT THIS RESEARCH, THE AEROSTRUCTURES BRANCH MUST BE CAPABLE OF MAKING PREDICTIONS OF TRANSIENT AERODYNAMIC HEATING AND TEMPERATURES. THEREFORE, THE ABILITY TO QUICKLY AND ACCURATELY CALCULATE AERODYNAMIC HEATING AND TRANSIENT SURFACE TEMPERATURES IS CRITICAL TO THE AEROSTRUCTURES BRANCH PRIMARY MISSION OF AEROSTRUCTURES RESEARCH. |
| W912MM18F0038 | CH2M HILL - HDR JV | Department of Defense | $40.52K | 2018-09-27 | 2021-08-31 | 541330 | A/E SERVICE TO DESIGN BLDG 64 FOR A HEADQUARTERS THE FACILITY IS LOCATED AT JOE FOSS FIELD, SIOUX FALLS S.D. LUXC182419 |
| 0012 | JACOBS FACILITIES INCORPORATED | Department of Defense | $40.49K | 2012-05-01 | 2012-08-30 | 541310 | TYPE C SERVICES |
| 68HE0618F0303 | CH2M HILL, INC. | Environmental Protection Agency | $40.39K | 2018-09-12 | 2018-11-30 | 562910 | IGF::OT::IGF AGRICULTURE STREET LANDFILL TECHNICAL ASSISTANCE NEW TASK ORDER THE WORK PLAN IS PARTIALLY APPROVED AND SHALL BE INCREMENTALLY FUNDED AT EXPENDITURE LIMITS OF $ 40,445.47 |
| F12CW10401 | KLINGSTUBBINS, INC. | Smithsonian Institution | $40.27K | 2012-06-22 | 2015-06-29 | 541310 | OFEO PROJECT NO. 1200103, TITLED NMNH FOSSIL CAFE RELOCATION FEASIBILITY STUDY |