Award search
Awards for “general electric”
25 awards on this page · sorted by amount · page 204
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0011 | GE AVIATION SYSTEMS LLC | Department of Defense | $591.01K | 2010-08-18 | 2012-04-30 | 336413 | MV-22B K-VADR |
| VA255P1546 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $590.99K | 2009-12-28 | 2015-12-27 | 334510 | CENTRICITY MAINTENANCE |
| SPE4A524F2632 | GENERAL ELECTRIC COMPANY | Department of Defense | $590.75K | 2023-11-24 | 2025-06-24 | 336411 | 8510281620!NOZZLE SEGMENT,AIRC |
| 36C25022F1009 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $590.66K | 2022-09-02 | 2023-09-01 | 334517 | EMERGENCY REPAIRS OF GE EQUIPMENT DAMAGED BY LEAK |
| 0409 | GENERAL ELECTRIC COMPANY | Department of Defense | $590.64K | 2008-09-04 | 2009-09-02 | 423450 | 4508519910!MEDICAL C |
| VA797H12J0553 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $590.41K | 2013-09-05 | 2014-03-04 | 334517 | XR-RFW/TURNKEY |
| VA797H13J0046 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $590.34K | 2012-12-18 | 2013-06-03 | 334517 | RAD |
| 0684 | GENERAL ELECTRIC COMPANY | Department of Defense | $590.17K | 2015-05-21 | 2016-06-30 | 336412 | 8502136711!NOZZLE SEGMENT,TURB |
| VA797H15J0288 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $590.12K | 2015-01-27 | 2015-07-24 | 334517 | DIAGNOSTIC X-RAY. |
| N4033923FF010 | GE ENERGY POWER CONVERSION USA INC. | Department of Defense | $589.75K | 2023-05-23 | 2023-07-11 | 541330 | SUPPLIES AND SERVICES |
| SPE4A519F1258 | GENERAL ELECTRIC COMPANY | Department of Defense | $589.46K | 2018-10-15 | 2022-11-16 | 336413 | 8505964223!BOLT,MACHINE |
| TYLM | GENERAL ELECTRIC COMPANY | Department of Defense | $589.36K | 2008-06-25 | 2009-04-30 | 332999 | 4507952811!BLADE,TUR |
| 70Z08525FLREP0039 | GE ENERGY POWER CONVERSION USA INC. | Department of Homeland Security | $588.91K | 2025-05-23 | 2026-03-07 | 336611 | HEALY IPP TASK ORDER FOR TRAINING IN FY25 & 26. |
| 36C24721F0196 | MEDI-PHYSICS, INC. | Department of Veterans Affairs | $588.78K | 2021-03-01 | 2024-02-29 | 325412 | DATSCAN RADIOPHARMACEUTICAL |
| SPE4A519F671U | GENERAL ELECTRIC COMPANY | Department of Defense | $588.7K | 2019-06-06 | 2021-03-31 | 336413 | 8506520977!BLADE,TURBINE ROTOR |
| EF18 | GENERAL ELECTRIC COMPANY | Department of Defense | $588.63K | 2012-02-29 | 2013-08-31 | 541330 | CETS |
| 2000 | GENERAL ELECTRIC COMPANY | Department of Defense | $588.5K | 2012-02-13 | 2013-05-31 | 332510 | 4520401230!COUPLING HALF,SHAFT |
| NNA12AB81C | GENERAL ELECTRIC COMPANY | National Aeronautics and Space Administration | $588.39K | 2012-09-10 | 2014-10-31 | 541712 | IGF::OT::IGF OTHER FUNCTIONS: ADVANCES SUCH AS CLOUD, CLUSTER, AND NETWORK COMPUTING CONCEPTS ARE INTENDED TO INCREASE THE EFFICIENCY OF APPLICATIONS DEVELOPMENT, THEIR UPGRADES, AND REDUCE DUPLICATION OF DEVELOPMENT AND DATA STORAGE. THESE COMPUTING CONCEPTS ALLOW THE LOCATION OF USE, AND LOCATION OF PROCESSING OR STORAGE TO BE SEPARATED. SUCH SEPARATION ALLOWS FOR EFFECTIVE AND CONSISTENT ACCESS TO THE SAME CAPABILITY AT MULTIPLE LOCATIONS (OR BY MULTIPLE PARTIES) IN A SYNCHRONOUS OR ASYNCHRONOUS MANNER. FURTHER, MODIFICATIONS AND UPGRADES OF THE CAPABILITIES (SUCH AS TRAJECTORY MODEL OF AN AIRCRAFT) NEED TO BE DONE ONLY ONCE, ENABLING REDUCED DOWNTIME OF AIRCRAFT, AIR NAVIGATION SERVICE PROVIDER (ANSP), OR AIRLINE OPERATIONS CENTER (AOC) CAPABILITIES FOR UPGRADES OF SOFTWARE, MODELS, DATABASE, AND OTHER FUNCTIONS THAT CAN BE ACCESSED BY A NETWORK. SUCH SEPARATION ALSO ALLOWS MINIMAL PROCESSING, STORAGE, AND SOFTWARE TO BE RESIDENT AT THE LOCATION OF USE AND ENABLES A MAJORITY OF FUNCTIONS TO BE LOCATED AWAY FROM THE LOCATION OF USE, BUT MAKING THEM ACCESSIBLE ON DEMAND AS NEEDED. A RELIABLE AND SECURE NETWORKING CAPABILITY IS A KEY TO THE SUCCESSFUL USAGE OF THESE ADVANCED COMPUTING CONCEPTS FOR SAFETY CRITICAL AIR TRAFFIC MANAGEMENT (ATM) APPLICATIONS. AS A RESULT OF THESE ADVANCED NETWORKING CONCEPTS, DIFFERENT FUNCTIONAL ALLOCATION SCHEMES ARE POSSIBLE WITHIN THE DECISION TRIAD OF THE AOC, THE ANSP, AND AIRCRAFT. THUS FAR, LIMITED RESEARCH EXISTS THAT COMPARES NETWORK-CENTRIC FUNCTIONAL ALLOCATION STRATEGIES AND THEIR IMPACTS ON THE TOTAL COST OF THE AIR TRAFFIC MANAGEMENT OPERATIONS. THE OVERALL GOAL OF THIS NRA SOLICITATION IS TO EXPLORE AIR TRAFFIC MANAGEMENT FUNCTIONAL ALLOCATION SCHEMES THAT LEVERAGE ADVANCED NETWORKING CONCEPTS, AND TO DETERMINE WHETHER SUCH SCHEMES WILL REDUCE THE COST OF THE AIR TRAFFIC MANAGEMENT OPERATIONS. THE APPROACH IS TO LEVERAGE COMPUTING AND NETWORKING ADVANCEMENTS SO THAT THE TECHNOLOGY, SOFTWARE AND APPLICATION DEVELOPMENT, TESTING, UPGRADES, AND MODIFICATIONS WILL BE HIGHLY EFFICIENT AT A SYSTEM LEVEL. ADVANCED NETWORKING CONCEPTS INCLUDE, BUT ARE NOT LIMITED TO, PUBLIC AND PRIVATE CLOUD, CLUSTER, AND NETWORK COMPUTING. |
| UN73 | GENERAL ELECTRIC COMPANY | Department of Defense | $588.35K | 2011-05-05 | 2012-09-30 | 336412 | AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING (INCLUDING RESEARCH AND DEVELOPMENT) |
| VA26214J7509 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $588.16K | 2014-10-01 | 2015-09-30 | 334517 | IGF::OT::IGF MANDATORY NAC CONTRACT FOR HI TECH MEDICAL EQUIPMENT MAINTENANCE; FOR STATION 664; VA SAN DIEGO HEALTHARE SYSTEM |
| THB3 | GE AVIATION SYSTEMS LLC | Department of Defense | $588K | 2017-03-23 | 2018-04-30 | 336413 | ELECTRONIC COMPONEN |
| 36A79718N0061 | GENERAL ELECTRIC COMPANY | Department of Veterans Affairs | $587.85K | 2018-07-26 | 2020-09-30 | 334517 | XR RF |
| THD1 | GENERAL ELECTRIC COMPANY | Department of Defense | $587.56K | 2011-04-08 | 2012-04-11 | 336412 | TURBO ROTAR |
| Z6ZS | GENERAL ELECTRIC COMPANY | Department of Defense | $587.45K | 2014-12-03 | 2016-08-31 | 336412 | 8501599243!CABLE ASSEMBLY,THER |
| V548P1216 | GE HEALTHCARE INC | Department of Veterans Affairs | $587.36K | 2006-06-30 | 2010-03-31 | 325412 | DELIVERY OF RADIOPHARMACEUTICALS |