Awards for “HDR ENGINEERING, INC.”
25 awards on this page · sorted by amount · page 20
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 140A1622F0070 | HDR ENGINEERING, INC. | Department of the Interior | $319.22K | 2022-03-31 | 2023-07-31 | 541330 | BIA POWER DIVESTITURE STUDY |
| DJ06 | HDR ENGINEERING, INC. | Department of Defense | $319K | 2009-07-31 | 2011-02-09 | 541330 | TAS::96 3134::TAS RECOVERYPROJECT#::143665::RP# RIP RAP LANDING FEASIBILITY STUDY STAGE II. THE PROJECT SITE IS LOCATED IN CALHOUN COUNTY, ILLINOIS IN MISSISSIPPI RIVER POOL 25 BETWEEN RIVER MILES 267.0 AND 260.5. |
| 0003 | HDR ENGINEERING, INC. | Department of Defense | $318.8K | 2010-09-30 | 2011-06-30 | 541330 | ENGINEERING SERVICES |
| 0010 | HDR ENGINEERING, INC. | Department of Defense | $316.48K | 2014-09-09 | 2015-05-29 | 541330 | IGF::OT::IGF HOUSING MARKET ANALYSIS |
| 140P2021F0107 | HDR ENGINEERING, INC. | Department of the Interior | $316.37K | 2021-03-08 | 2021-05-28 | 541330 | SHEN 312442 FY21 A&E DESIGN FOR ROADWAY IMPROVEMENTS |
| 0001 | HDR ENGINEERING, INC. | Department of Defense | $316.23K | 2009-01-30 | 2009-09-04 | 541310 | PREPARE DESIGN BUILD RFP |
| INR11PD10033 | HDR ENGINEERING, INC. | Department of the Interior | $314.57K | 2011-02-09 | 2012-02-29 | 541330 | TASK ORDER FOR PHASE II OF PROJECT TO PREPARE AS-BUILT DRAWINGS FOR THE THIRD POWER PLANT AT GRAND COULEE DAM, WASHINGTON. |
| 6982AF22F00122N | HDR ENGINEERING, INC. | Department of Transportation | $312.46K | 2022-07-20 | 2026-12-31 | 541330 | CLIN 00001 - V710 FUNDS NM FW VDO T300(1) PERIMETER TRAIL AE DESIGN TASK ORDER |
| DTFH6806D00007T10042 | HDR ENGINEERING, INC. | Department of Transportation | $311.99K | 2010-10-27 | 2011-07-08 | 541330 | CA NPS GOGA 433(1) POINT BONITA LIGHTHOUSE BRIDGE FINAL DESIGN DTFH68-06-D-00007/T-10-042 |
| W912DR22F0310 | HDR ENGINEERING, INC. | Department of Defense | $311.93K | 2022-09-30 | 2023-08-23 | 541330 | A/E SERVICES -DISA SECURE SPACE PLANNING |
| 69056723F00049N | HDR ENGINEERING, INC. | Department of Transportation | $310.75K | 2023-05-01 | 2023-12-15 | 541330 | CA NPS PP SEKI 2018(3), PAVEMENT PRESERVATION SEKI PHASE I & II CONSULTANT INSPECTION SERVICES |
| W912DY19F1120 | HDR ENGINEERING, INC. | Department of Defense | $310.42K | 2019-09-20 | 2021-03-30 | 541310 | REQUIREMENT ANALYSIS LABOR |
| W9123820F0037 | HDR ENGINEERING, INC. | Department of Defense | $310.15K | 2020-03-10 | 2023-05-01 | 541330 | PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH B, ENGINEERING SERVICES DURING CONSTRUCTION, SACRAMENTO COUNTY, CA. |
| 0008 | HDR ENGINEERING, INC. | Department of Defense | $308.87K | 2011-02-11 | 2014-06-06 | 541310 | DB-RFP, TASKS 1-8 F 35A AEROSPACE GROUND EQUIPMENT (AGE) FACILITY, NELLIS AFB, NV. |
| AG82X9D140012 | HDR ENGINEERING, INC. | Department of Agriculture | $308.71K | 2014-03-28 | 2015-07-15 | 541310 | IGF::CT::IGF |
| DTFH6806D00007T10050 | HDR ENGINEERING, INC. | Department of Transportation | $306.85K | 2010-09-15 | 2014-11-04 | 541330 | CA RRP SALU 11(1) SAN LUIS NWR ENTRANCE ROAD FINAL DESIGN DTFH68-06-D-00007/T-10-050 $94,052.89 |
| N3319122F4072 | HDR ENGINEERING, INC. | Department of Defense | $305.38K | 2022-09-22 | 2022-09-23 | 541330 | AVIANO, ITALY: INCREASE FUEL STORAGE CAPACITY |
| W912GB23F0205 | HDR ENGINEERING, INC. | Department of Defense | $304.73K | 2023-09-06 | 2024-09-06 | 541330 | SOFA FY23 USAREUR-AF ECONOMIC ANALYSIS (EA) COMMAND OPERATIONS AND INFORMATION CENTER (COIC) USAG WIESBADEN, DE |
| 0008 | HDR ENGINEERING, INC. | Department of Defense | $304K | 2007-02-02 | 2009-06-26 | 541330 | TASKS 1-7, DESIGN DOCUMENTATION REPORT |
| 6982AF23F00053N | HDR ENGINEERING, INC. | Department of Transportation | $303.92K | 2023-04-04 | 2025-09-30 | 541330 | TX FLAP UV CR203(1) FISH HATCHERY ROAD SCOPING SERVICES TASK ORDER |
| 69056722F000011 | HDR ENGINEERING, INC. | Department of Transportation | $300.9K | 2021-12-27 | 2022-09-30 | 541330 | WA CLARK 2018(1), E 5TH STREET AND NPS PARKING IMPROVEMENTS CPE SERVICES |
| W912DY22F0375 | HDR ENGINEERING, INC. | Department of Defense | $299.77K | 2022-09-12 | 2023-09-11 | 541310 | UDP |
| DTFH6812D00013T14036 | HDR ENGINEERING, INC. | Department of Transportation | $299.62K | 2014-04-21 | 2015-08-15 | 541330 | IGF::CT::IGF AZ FTNP GLCA 1(1)3(1) WAHWEAP MARINA ACCESS ROAD DTFH68-12-D-00013/T-14-036 T/O FOR 30-100% DESIGN OF 3R PROJECT AT GLEN CANYON NATIONAL RECREATION AREA. |
| 0023 | HDR ENGINEERING, INC. | Department of Defense | $299.43K | 2014-09-30 | 2016-01-04 | 541310 | AVIATION AND MISSLE COMMAND (AMCOM) REGIONAL AIR SUPPORT MAINTENANCE HANGARS AT JBLM, WA, FORT HOOD, TX, AND FORT CARSON, CO. FACILITIES REQUIREMENT ANALYSES AND PLANNING CHARRETTES. |
| 6982AF20F000118 | HDR ENGINEERING, INC. | Department of Transportation | $299.15K | 2020-09-15 | 2022-08-31 | 541330 | NM FTNP/NPS BAND 910(1) TSANKAWI AND FREY PARKING LOTS 100% DESIGN TASK ORDER FOR NM FTNP/NPS BAND 910(1) AND TSANAKAWI FREY PARKING LOT PROJECT |