Awards for “GUARDIAN CONSTRUCTION, INC.”
25 awards on this page · sorted by amount · page 2
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 140R1025C0005 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $1.69M | 2025-01-23 | 2026-05-15 | 237990 | TETON DAM 50TH COMMEMORATION OVERLOOK PROJECT |
| 1284N819C0003 | GUARDIAN CONSTRUCTION, INC. | Department of Agriculture | $1.45M | 2019-03-26 | 2020-10-13 | 236220 | IGF::OT::IGF FLAMING GORGE RD OFFICE ADDITION - BASE BID PLUS OPTION A THIS PROJECT CONSISTS OF CONSTRUCTING AN OFFICE ADDITION OF APPROXIMATELY 3,225 SQUARE FEET TO THE EXISTING FLAMING GORGE RANGER DISTRICT OFFICE. THE FACILITY IS LOCATED IN MANILA, UTAH ON PROPERTY OWNED BY THE ASHLEY NATIONAL FOREST. THE PROJECT INCLUDES SOME SITE DEMOLITION, DISPOSAL AND PREPARATION FOR NEW CONSTRUCTION. THE CONTRACT INCLUDES THE CONSTRUCTION OF AN ADDITION THAT WILL BE CONNECTED BY A BREEZEWAY BETWEEN THE EXISTING BUILDING AND BUILDING ADDITION. CONTRACT PERIOD OF PERFORMANCE IS 270 CALENDAR DAYS FROM DATE OF ISSUANCE OF THE NOTICE TO PROCEED. AWARD IS FOR THE BASE BID ITEMS AND OPTION A ITEMS. OPTION B ITEMS ARE NOT AWARDED AT THIS TIME, BUT MAY BE EXERCISED DURING THE LIFE OF THIS CONTRACT. AWARD IS AS FOLLOWS: BASE AWARD ITEMS: MOBILIZATION AND BONDING $23,993.00 DIVISION 01: GENERAL CONDITIONS $236,711.00 DIVISION 02: EXISTING CONDITIONS $18,732.00 DIVISION 03: CONCRETE $57,693.00 DIVISION 05: METALS $28,795.00 DIVISION 06: WOOD, PLASTICS AND COMPOSITES $143,730.00 DIVISION 07: THERMAL AND MOISTURE PROTECTION $131,866.00 DIVISION 08: OPENINGS $55,857.00 DIVISION 09: FINISHES $104,723.00 DIVISION 10: SPECIALTIES $30,634.00 DIVISION 11 AND 12: EQUIPMENT AND FURNISHINGS $10,794.00 DIVISION 22: PLUMBING $44,400.00 DIVISION 23: HEATING, VENTILATION AND AIR CONDITIONING $56,890.00 DIVISION 26, 27, 28: ELECTRICAL, COMMUNICATIONS AND SECURITY $83,950.00 DIVISION 31 AND 32: EARTHWORK AND EXTERIOR IMPROVEMENTS $170,914.00 STEEL PLANTER BOXES ADJACENT TO BLDG $10,835.00 ELECTRICAL SERVICE AND FEEDER TO PANEL D $7,930.00 ELECTRICAL PARKING LOT LIGHTING AND DAMAGED COM CABLE $5,400.00 TOTAL BASE AWARD ITEMS: $1,223,747.00* ($100.00 DIFFERENCE IN TOTAL. AMOUNT OF $1,223,747.00 CONFIRMED CORRECT BY SAMMY LEE) BID OPTION A ITEMS: SITE FURNISHINGS: PICNIC TABLES $1,450.00 SITE FURNISHINGS: BIKE RACK $650.00 LANDSCAPE IRRIGATION SYSTEM $14,500.00 EXTERIOR PLANTS, PLANTING MEDIA, INSTALLATION OF GOVERNMENT FURNISHED BOULDERS $23,500.00 LANDSCAPE STONE, WEED BARRIER, STEEL EDGING $34,500.00 TOTAL OPTION A ITEMS: $74,600.00 TOTAL AWARD AMOUNT: $1,298,347.00 GOVERNMENT POINT OF CONTACT: LANCE VALENTINE PHONE: 435.781.5113 |
| 697DCK23C00183 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $1.42M | 2023-05-12 | 2025-12-31 | 238220 | REPLACEMENT OF FOUR (4) WATER-TO-WATER HEAT PUMPS LOCATED AT THE OAKLAND AIRPORT, CALIFORNIA. |
| 47PE0725C0001 | GUARDIAN CONSTRUCTION, INC. | General Services Administration | $1.37M | 2024-10-30 | 2027-01-04 | 236220 | PROCURE AND INSTALL FIRE ALARM SYSTEM. LOCATION: CLAUDE PEPPER FED BLDG, MIAMI FL 33130 GSA BLDG #: FL0061ZZ |
| 140P1321C0005 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $1.35M | 2021-08-02 | 2022-01-10 | 237990 | AMIS REPLACE WATER SYSTEM AT DIABLO EAST |
| AG82B1C100159 | GUARDIAN CONSTRUCTION, INC. | Department of Agriculture | $1.31M | 2010-04-16 | 2011-12-02 | 236220 | TAS::12 1102::TAS ARRA - BUCKEYE RESERVOIR CAMPGROUND CONSTRUCTION |
| 697DCK24C00054 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $1.3M | 2023-12-05 | 2025-08-29 | 238220 | REPLACE AIR HANDLING UNITS 510, 515 AND 520 AT THE MINNEAPOLIS AIR ROUTE TRAFFIC CONTROL CENTER (ZMP ARTCC), FARMINGTON, MN |
| W912DW15C0010 | GUARDIAN CONSTRUCTION, INC. | Department of Defense | $1.27M | 2015-09-10 | 2016-11-13 | 238160 | IGF::OT::IGF ROOF AND INSULATION REPLACEMENT FOR LIBBY DAM POWERHOUSE |
| 140P2026C0003 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $1.15M | 2025-11-12 | 2026-08-09 | 237990 | THE PURPOSE OF THIS PROJECT IS TO PROVIDE CERTAIN SPECIFIC EMERGENCY STABILIZATION MEASURES PRIOR TO THE CLOSURE OF THE NORTH RIM FOR THE WINTER OF 2025/2026 IN ORDER TO MITIGATE SOME OF THE EXISTING SAFETY HAZARDS AND REDUCE THE RISK OF MIGRATION OF |
| 697DCK23C00095 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $1.14M | 2023-02-17 | 2024-04-15 | 236220 | PONTIAC ATCT HVAC |
| 697DCK19C00127 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $1.12M | 2019-05-14 | 2021-08-02 | 238220 | HVAC CONTROLS AND EQUIPMENT REPLACEMENT AT NEW ORLEANS INTERNATIONAL AIRPORT (MSY ATCT) |
| 140P1522C0015 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $1.05M | 2022-09-14 | 2024-08-01 | 237110 | GRCA 229058 NORTH RIM WWTP REHAB |
| 697DCK23C00076 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $1.03M | 2023-01-12 | 2024-11-21 | 238220 | REPLACEMENT OF THE BASE BUILDING HVAC AND THE ENTIRE DDC SYSTEMS. |
| 697DCK24C00307 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $1.02M | 2024-08-13 | 2025-08-12 | 238210 | DENVER AIRPORT TRAFFIC CONTROL TOWER (DEN ATCT) FIRE AND LIFE SAFETY LIFECYCLE REPLACEMENT (FLS) |
| W9123819C0034 | GUARDIAN CONSTRUCTION, INC. | Department of Defense | $1.01M | 2019-09-09 | 2020-11-26 | 236220 | REPLACE WATER LINE, SEWER LINE AND STORM DRAIN |
| AG0261C100031 | GUARDIAN CONSTRUCTION, INC. | Department of Agriculture | $938.88K | 2010-09-01 | 2011-10-13 | 236220 | KRASSEL WORK CENTER BARRACKS BUILDINGS PROJECT |
| 140P8124C0005 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $913.5K | 2024-09-20 | 2026-04-22 | 238220 | REPLACE ALAN BIBLE VISITOR CENTER HVAC AND ROOF AT LAKE MEAD NATIONAL RECREATION AREA IN BOULDER CITY, NEVADA. |
| 697DCK23C00406 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $910.71K | 2023-09-18 | 2025-08-10 | 238220 | DEMOLISH AND REPLACE FOUR COMPUTER ROOM AIR CONDITIONER UNITS, REPLACE ASSOCIATED PIPING, AND RELATED ELECTRICAL UPGRADES AT SALT LAKE CITY ARTCC - SALT LAKE CITY, UTAH |
| FA486123C0017 | GUARDIAN CONSTRUCTION, INC. | Department of Defense | $852.18K | 2023-05-15 | 2025-12-25 | 238220 | 99 CS INFORMATION TRANSFER NODE B621 FIRE SUPPRESSION SYSTEM |
| 140P2024C0034 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $815.16K | 2024-03-12 | 2025-02-22 | 237310 | BITH 244484, PEDESTRIAN BRIDGE ABUTMENT REPAIRS-BIG THICKET NATIONAL PRESERVE |
| 140P2025C0015 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $734.11K | 2025-01-08 | 2025-04-19 | 237310 | CHIC 327043 BRIDGE PRESERVATION |
| 140R4022C0011 | GUARDIAN CONSTRUCTION, INC. | Department of the Interior | $723.1K | 2022-09-12 | 2023-08-31 | 238160 | FLAMING GORGE POWER PLANT ROOF REPLACEMENT |
| 697DCK22C00326 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $716.9K | 2022-09-07 | 2024-05-06 | 238220 | HOU ARSR HVAC & ROOF REPLACEMENT |
| FA820116C0026 | GUARDIAN CONSTRUCTION, INC. | Department of Defense | $709.28K | 2016-09-27 | 2017-10-29 | 238210 | IGF::OT::IGF INSTALL FIRE ALARMS FOR ALL OF B238 |
| 697DCK25C00051 | GUARDIAN CONSTRUCTION, INC. | Department of Transportation | $708.94K | 2024-12-04 | 2026-06-30 | 236220 | DOOR REPLACEMENT AND RECORE/REKEY PROJECT AT FAA'S DENVER AIR ROUTE TRAFFIC CONTROL CENTER IN LONGMONT, COLORADO. |