FedTALLY

Awards for “ENSCO INC

25 awards on this page · sorted by amount · page 19

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
0010ENSCO INCDepartment of Defense$119.7K
2012-06-082012-12-08541519RESEARCH AND DEVELOPMENT (R&D)
DTFR5302D000770006ENSCO INCDepartment of Transportation$119.24K
2004-09-012005-12-31TRACK QUALITY INDEX
0011ENSCO INCDepartment of Defense$116K
2012-09-112013-09-13541519RESEARCH AND DEVELOPMENT (R&D)
003ENSCO INCDepartment of Transportation$115.53K
2014-09-172015-05-15541330IGF::OT::IGF MODELING AND SIMULATION TOOLS SURVEY
0008ENSCO INCDepartment of Defense$114.35K
2010-08-012010-11-01561621SPECIAL STUDIES
010ENSCO INCDepartment of Transportation$111.23K
2008-11-262009-03-20541330RAIL PROFILE MEASUREMENT SYSTEM INSTALLATION ON RAIL CAR
009ENSCO INCDepartment of Transportation$110.64K
2008-08-292013-02-28541330::OTHER FUNCTION:: ENGINEERING SUPPORT
693JJ619F000091ENSCO INCDepartment of Transportation$109.27K
2019-09-112020-02-28541715TTC HAS A VARIETY OF TRACK CONDITIONS, TYPES OF CONSTRUCTION, AND TEST BED CONFIGURATIONS TO TEST A LARGE VARIETY OF TRACK EQUIPMENT, VEHICLES, OPERATING CONDITIONS AND MATERIAL TYPES. ENGINEERING SERVICES ARE NEEDED TO VISUALLY INSPECT AND MAKE AN E
00053200009C0016DTFR5399D00003ENSCO INCDepartment of Transportation$109K
2000-09-152001-09-15
025ENSCO INCDepartment of Transportation$103.95K
2012-08-232014-08-31541330IGF::OT::IGF OPERATIONS, MAINTENANCE, INSTRUMENTATION AND ANALYSIS SUPPORT FOR THE FRA OFFICE OF RESEARCH POLICY AND DEVELOPMENT.
N0017315C6002ENSCO INCDepartment of Defense$102.24K
2015-04-132015-10-12541712IGF::OT::IGF PR 72-9104-15 TOTAL ELECTRON COUNT (TEC) ALGORITHM ENHANCEMENTS R&D
DTFR5301D000300005ENSCO INCDepartment of Transportation$102K
2004-09-232005-09-30NO FUNDS EXTENSION, CREW RESOURCE MANAGEMENT
012ENSCO INCDepartment of Transportation$101.62K
2011-08-262012-08-28541330THIS TASK ORDER UNDER DTFR53-10-D-00002 IS TO DETERMINE WHETHER THE REQUIRED INTERVALS OF TRACK INSPECTION FOR EACH CLASS OF TRACK SHOULD BE AMENDED; WHETHER TRACK REMEDIAL ACTION REQUIREMENTS SHOULD BE AMENDED; WHETHER DIFFERENT TRACK INSPECTION AND REPAIR PRIORITIES OR METHODS SHOULD BE REQUIRED; AND WHETHER THE SPEED AT WHICH RAILROAD TRACK INSPECTION VEHICLES OPERATE AND THE SCOPE OF THE TERRITORY THEY GENERALLY COVER ALLOW FOR PROPER INSPECTION OF THE TRACK; AND WHETHER SUCH SPEED AND APPROPRIATE SCOPE SHOULD BE REGULATED BY THE SECRETARY. PERIOD OF PERFORMANCE: 29 AUGUST 2011 THROUGH 28 AUGUST 2012.
027ENSCO INCDepartment of Transportation$101.34K
2012-09-052016-01-31541330IGF::OT::IGF THE FOLLOWING ARE REQUIREMENTS FOR THIS TEST: THE V/TI MONITOR SHALL EMPLOYEE THE DEFAULT MEASUREMENTS WHICH INCLUDE CARBODY VERTICAL ACCELERATION, CARBODY LATERAL ACCELERATION, TRUCK LATERAL ACCELERATION, AND AXLE VERTICAL IMPACT ACCELERATION NEAR BOTH WHEELS OF ONE AXLE. THE V/TI MONITOR SHALL DETECT EXCEPTIONS WHICH EXCEED THRESHOLD AND TRANSMIT THEM WIRELESSLY TO A REMOTE SERVER.
0008ENSCO INCDepartment of Defense$101.17K
2012-07-182013-07-17541519MS3 ENHANCEMENTS
030ENSCO INCDepartment of Transportation$100.48K
2013-02-122014-08-14541330IGF::OT::IGF THE OBJECTIVE OF THIS NEW TASK IS TO EXTRACT RAIL WEAR RELATED PARAMETERS FROM STORED AUTOMATED TRACK INSPECTION PROGRAM (ATIP) DATA IN AN EFFICIENT, AUTOMATED MANNER FOR LOCATIONS WHERE SERVICE FAILURES HAVE OCCURRED OR SPECIFIC TYPES OF RAIL INTERNAL DEFECTS, NAMELY DETAIL FRACTURES, COMPOUND FISSURES, AND VERTICAL SPLIT HEADS, WERE DETECTED.
DTFR5302D000770002ENSCO INCDepartment of Transportation$100.06K
2004-04-272005-07-31OPERATION AND MAINTENANCE
0020ENSCO INCDepartment of Defense$99.89K
2014-01-102015-01-09541519IGF::OT::IGF MAINTENANCE AND SUSTAINMENT
693JJ623F00005NENSCO INCDepartment of Transportation$99.85K
2023-03-232024-03-22541715EVALUATE THE SAFETY OF BATTERY TECHNOLOGIES UNDER LOADINGS OBSERVED IN TRAIN DERAILMENTS AND COLLISIONS. RESEARCH WILL INCLUDE DESTRUCTIVE TESTING OF BATTERIES, AND OTHER ALTERNATIVE CLEAN ENERGY TECHNOLOGY COMPONENTS. INVESTIGATE THE SAFETY, COSTS
693JJ623F00027NENSCO INCDepartment of Transportation$99.73K
2023-07-242024-10-31541715THE OBJECTIVES OF THE RESEARCH PROJECT IS TO EVALUATE THE EFFICACY OF OIL-FREE LOCOMOTIVE COMPRESSOR TECHNOLOGY, AND BETTER UNDERSTAND THE POTENTIAL ENVIRONMENTAL BENEFITS OF OIL FREE COMPRESSORS IN LOCOMOTIVES.
0051ENSCO INCDepartment of Transportation$99.73K
2016-06-132017-06-13541330IGF::OT::IGF AN APPROACH THAT WOULD QUANTIFY ENERGY TRANSFER FROM A MOVING VEHICLE TO THE TRACK HAS A POTENTIAL TO BECOME A METRIC THAT WOULD CHARACTERIZE TRACK IN NEW WAY. SUCH A METRIC, REFERRED TO AS THE TRACK ENERGY METRIC (TEM), HAS THE POTENTIAL TO CAPTURE INFORMATION FROM A BROADER WAVELENGTH RANGE WHEN COMPARED TO TRADITIONAL TRACK QUALITY INDICES (TQIS) AND COULD IDENTIFY ENERGY CONTENT DUE TO SPECIFIC CONDITIONS THAT COULD LEAD TO AN INFORMED DECISION ON WHAT TO ADDRESS IN THE TRACK. THE CONDITIONS COULD INCLUDE: * IMPACTS (I.E. P1, P2 FORCES) * CORRUGATION * TRACK GEOMETRY DEVIATIONS * CURVATURES
006ENSCO INCDepartment of Transportation$99.53K
2010-09-012011-09-01541330INITIAL AWARD OF TASK ORDER 6 TO IMPROVE THE LIDAR SSYTEM ON FRA'S R-4 HIGHRAILER AND COLLECT GRADE CROSSING DATA, AND COORDINATE TESTING OF SOFTWARE DEVELOPED FOR THIS TASK BY THE UNIV. OF MICHIGAN.
693JJ624F00033NENSCO INCDepartment of Transportation$98.67K
2024-07-302024-08-30541715PERFORMANCE OF TRACK REPAIRS AT PCD UNDER CONTRACT 693JJ6-21-D-000001
008ENSCO INCDepartment of Transportation$96.19K
2005-09-222007-08-31541990AWARD OF TASK ORDER 08 FOR CONTINUED INSTRUMENTED WHEELSET EFFORTS.
00053200009C0015DTFR5399D00003ENSCO INCDepartment of Transportation$96K
2000-09-152001-03-15