Awards for “ENSCO INC”
25 awards on this page · sorted by amount · page 19
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0010 | ENSCO INC | Department of Defense | $119.7K | 2012-06-08 | 2012-12-08 | 541519 | RESEARCH AND DEVELOPMENT (R&D) |
| DTFR5302D000770006 | ENSCO INC | Department of Transportation | $119.24K | 2004-09-01 | 2005-12-31 | — | TRACK QUALITY INDEX |
| 0011 | ENSCO INC | Department of Defense | $116K | 2012-09-11 | 2013-09-13 | 541519 | RESEARCH AND DEVELOPMENT (R&D) |
| 003 | ENSCO INC | Department of Transportation | $115.53K | 2014-09-17 | 2015-05-15 | 541330 | IGF::OT::IGF MODELING AND SIMULATION TOOLS SURVEY |
| 0008 | ENSCO INC | Department of Defense | $114.35K | 2010-08-01 | 2010-11-01 | 561621 | SPECIAL STUDIES |
| 010 | ENSCO INC | Department of Transportation | $111.23K | 2008-11-26 | 2009-03-20 | 541330 | RAIL PROFILE MEASUREMENT SYSTEM INSTALLATION ON RAIL CAR |
| 009 | ENSCO INC | Department of Transportation | $110.64K | 2008-08-29 | 2013-02-28 | 541330 | ::OTHER FUNCTION:: ENGINEERING SUPPORT |
| 693JJ619F000091 | ENSCO INC | Department of Transportation | $109.27K | 2019-09-11 | 2020-02-28 | 541715 | TTC HAS A VARIETY OF TRACK CONDITIONS, TYPES OF CONSTRUCTION, AND TEST BED CONFIGURATIONS TO TEST A LARGE VARIETY OF TRACK EQUIPMENT, VEHICLES, OPERATING CONDITIONS AND MATERIAL TYPES. ENGINEERING SERVICES ARE NEEDED TO VISUALLY INSPECT AND MAKE AN E |
| 00053200009C0016DTFR5399D00003 | ENSCO INC | Department of Transportation | $109K | 2000-09-15 | 2001-09-15 | — | — |
| 025 | ENSCO INC | Department of Transportation | $103.95K | 2012-08-23 | 2014-08-31 | 541330 | IGF::OT::IGF OPERATIONS, MAINTENANCE, INSTRUMENTATION AND ANALYSIS SUPPORT FOR THE FRA OFFICE OF RESEARCH POLICY AND DEVELOPMENT. |
| N0017315C6002 | ENSCO INC | Department of Defense | $102.24K | 2015-04-13 | 2015-10-12 | 541712 | IGF::OT::IGF PR 72-9104-15 TOTAL ELECTRON COUNT (TEC) ALGORITHM ENHANCEMENTS R&D |
| DTFR5301D000300005 | ENSCO INC | Department of Transportation | $102K | 2004-09-23 | 2005-09-30 | — | NO FUNDS EXTENSION, CREW RESOURCE MANAGEMENT |
| 012 | ENSCO INC | Department of Transportation | $101.62K | 2011-08-26 | 2012-08-28 | 541330 | THIS TASK ORDER UNDER DTFR53-10-D-00002 IS TO DETERMINE WHETHER THE REQUIRED INTERVALS OF TRACK INSPECTION FOR EACH CLASS OF TRACK SHOULD BE AMENDED; WHETHER TRACK REMEDIAL ACTION REQUIREMENTS SHOULD BE AMENDED; WHETHER DIFFERENT TRACK INSPECTION AND REPAIR PRIORITIES OR METHODS SHOULD BE REQUIRED; AND WHETHER THE SPEED AT WHICH RAILROAD TRACK INSPECTION VEHICLES OPERATE AND THE SCOPE OF THE TERRITORY THEY GENERALLY COVER ALLOW FOR PROPER INSPECTION OF THE TRACK; AND WHETHER SUCH SPEED AND APPROPRIATE SCOPE SHOULD BE REGULATED BY THE SECRETARY. PERIOD OF PERFORMANCE: 29 AUGUST 2011 THROUGH 28 AUGUST 2012. |
| 027 | ENSCO INC | Department of Transportation | $101.34K | 2012-09-05 | 2016-01-31 | 541330 | IGF::OT::IGF THE FOLLOWING ARE REQUIREMENTS FOR THIS TEST: THE V/TI MONITOR SHALL EMPLOYEE THE DEFAULT MEASUREMENTS WHICH INCLUDE CARBODY VERTICAL ACCELERATION, CARBODY LATERAL ACCELERATION, TRUCK LATERAL ACCELERATION, AND AXLE VERTICAL IMPACT ACCELERATION NEAR BOTH WHEELS OF ONE AXLE. THE V/TI MONITOR SHALL DETECT EXCEPTIONS WHICH EXCEED THRESHOLD AND TRANSMIT THEM WIRELESSLY TO A REMOTE SERVER. |
| 0008 | ENSCO INC | Department of Defense | $101.17K | 2012-07-18 | 2013-07-17 | 541519 | MS3 ENHANCEMENTS |
| 030 | ENSCO INC | Department of Transportation | $100.48K | 2013-02-12 | 2014-08-14 | 541330 | IGF::OT::IGF THE OBJECTIVE OF THIS NEW TASK IS TO EXTRACT RAIL WEAR RELATED PARAMETERS FROM STORED AUTOMATED TRACK INSPECTION PROGRAM (ATIP) DATA IN AN EFFICIENT, AUTOMATED MANNER FOR LOCATIONS WHERE SERVICE FAILURES HAVE OCCURRED OR SPECIFIC TYPES OF RAIL INTERNAL DEFECTS, NAMELY DETAIL FRACTURES, COMPOUND FISSURES, AND VERTICAL SPLIT HEADS, WERE DETECTED. |
| DTFR5302D000770002 | ENSCO INC | Department of Transportation | $100.06K | 2004-04-27 | 2005-07-31 | — | OPERATION AND MAINTENANCE |
| 0020 | ENSCO INC | Department of Defense | $99.89K | 2014-01-10 | 2015-01-09 | 541519 | IGF::OT::IGF MAINTENANCE AND SUSTAINMENT |
| 693JJ623F00005N | ENSCO INC | Department of Transportation | $99.85K | 2023-03-23 | 2024-03-22 | 541715 | EVALUATE THE SAFETY OF BATTERY TECHNOLOGIES UNDER LOADINGS OBSERVED IN TRAIN DERAILMENTS AND COLLISIONS. RESEARCH WILL INCLUDE DESTRUCTIVE TESTING OF BATTERIES, AND OTHER ALTERNATIVE CLEAN ENERGY TECHNOLOGY COMPONENTS. INVESTIGATE THE SAFETY, COSTS |
| 693JJ623F00027N | ENSCO INC | Department of Transportation | $99.73K | 2023-07-24 | 2024-10-31 | 541715 | THE OBJECTIVES OF THE RESEARCH PROJECT IS TO EVALUATE THE EFFICACY OF OIL-FREE LOCOMOTIVE COMPRESSOR TECHNOLOGY, AND BETTER UNDERSTAND THE POTENTIAL ENVIRONMENTAL BENEFITS OF OIL FREE COMPRESSORS IN LOCOMOTIVES. |
| 0051 | ENSCO INC | Department of Transportation | $99.73K | 2016-06-13 | 2017-06-13 | 541330 | IGF::OT::IGF AN APPROACH THAT WOULD QUANTIFY ENERGY TRANSFER FROM A MOVING VEHICLE TO THE TRACK HAS A POTENTIAL TO BECOME A METRIC THAT WOULD CHARACTERIZE TRACK IN NEW WAY. SUCH A METRIC, REFERRED TO AS THE TRACK ENERGY METRIC (TEM), HAS THE POTENTIAL TO CAPTURE INFORMATION FROM A BROADER WAVELENGTH RANGE WHEN COMPARED TO TRADITIONAL TRACK QUALITY INDICES (TQIS) AND COULD IDENTIFY ENERGY CONTENT DUE TO SPECIFIC CONDITIONS THAT COULD LEAD TO AN INFORMED DECISION ON WHAT TO ADDRESS IN THE TRACK. THE CONDITIONS COULD INCLUDE: * IMPACTS (I.E. P1, P2 FORCES) * CORRUGATION * TRACK GEOMETRY DEVIATIONS * CURVATURES |
| 006 | ENSCO INC | Department of Transportation | $99.53K | 2010-09-01 | 2011-09-01 | 541330 | INITIAL AWARD OF TASK ORDER 6 TO IMPROVE THE LIDAR SSYTEM ON FRA'S R-4 HIGHRAILER AND COLLECT GRADE CROSSING DATA, AND COORDINATE TESTING OF SOFTWARE DEVELOPED FOR THIS TASK BY THE UNIV. OF MICHIGAN. |
| 693JJ624F00033N | ENSCO INC | Department of Transportation | $98.67K | 2024-07-30 | 2024-08-30 | 541715 | PERFORMANCE OF TRACK REPAIRS AT PCD UNDER CONTRACT 693JJ6-21-D-000001 |
| 008 | ENSCO INC | Department of Transportation | $96.19K | 2005-09-22 | 2007-08-31 | 541990 | AWARD OF TASK ORDER 08 FOR CONTINUED INSTRUMENTED WHEELSET EFFORTS. |
| 00053200009C0015DTFR5399D00003 | ENSCO INC | Department of Transportation | $96K | 2000-09-15 | 2001-03-15 | — | — |