Award search
Awards for “jacobs”
25 awards on this page · sorted by amount · page 162
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0076 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $495.78K | 2008-01-01 | 2009-06-30 | 541330 | ARM PROGRAM ENGINEERING SUPPORT |
| 47PM0220P0002 | JACOBS PROJECT MANAGEMENT CO | General Services Administration | $495.62K | 2019-11-06 | 2022-03-31 | 236220 | HERBERT C HOOVER BUILDING PHASE 4 PRE AND POST ELECT SPACE CONSTRUCTION MANAGEMENT SERVICES |
| INP13PD02498 | CH2M HILL, INC | Department of the Interior | $495.39K | 2013-09-11 | 2016-03-31 | 541620 | IGF::OT::IGF NORTHEAST REGION TRAFFIC SAFETY MANAGEMENT SYSTEM ENGINEERING SUPPORT SERVICES NERO F4384 |
| H9240421F0003 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $495.38K | 2020-10-30 | 2021-10-29 | 541519 | EO&M SURGE TRAVEL AND ODC'S - COST |
| 0184 | TYBRIN CORPORATION | Department of Defense | $495.13K | 2008-12-16 | 2009-12-31 | 334111 | SSR ENGINEERING SERVICES |
| DTFH6804D00002T09036 | JACOBS ENGINEERING GROUP INC | Department of Transportation | $494.79K | 2009-09-03 | 2010-12-31 | 541330 | CO PFH 80-1(2)&2(4) GUANELLA PASS FINAL DESIGN DTFH68-04-D-00002/T-09-036 $494.793.24 |
| 0115 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $494.77K | 2010-07-01 | 2010-11-30 | 541330 | ONR ENGINEERING SUPPORT |
| GSP1110MK0072 | JACOBS PROJECT MANAGEMENT CO | General Services Administration | $494.42K | 2010-08-03 | 2010-09-30 | 236220 | CQM SERVICES IS SUPPORT OF DOS PROJECT. |
| NNH14CL67C | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $494.42K | 2014-07-29 | 2015-02-13 | 336414 | IGF::OT::IGF THIS IS A BAA CONTRACT FOR RESEARCH FOR AN ASTEROID CAPTURE SYSTEM CONCEPTUAL STUDY. UNDER THIS CONTRACT, THE CONTRACTOR SHALL DESIGN AND ANALYZE AN ARM SYSTEM. THE ARMS SHALL BE CAPABLE OF BEING STOWED WITHIN A VOLUME WHICH WILL BE DEFINED BY THE GOVERNMENT AT THE KICKOFF MEETING DESCRIBED IN THE BAA. DURING THE CAPTURE PHASE, THE ARMS SHALL BE CAPABLE OF FULL EXTENSION AROUND THE MAXIMUM SIZE ASTEROID DEFINED IN THE BAA. THE ARM SYSTEMS SHALL, IN CONJUNCTION WITH THE BAG AND DEPLOYMENT SYSTEM, BE CAPABLE OF SECURING THE ASTEROID AGAINST THE GIMBALED BULKHEAD WITHOUT OUTSIDE INPUT. THE CONTRACTOR SHALL DESIGN AND ANALYZE A CAPTURE BAG, INCLUDING A DEPLOYMENT SYSTEM. THE CONTRACTOR SHALL DESIGN AND ANALYZE A DESIGN SYSTEM. THE CONTRACTOR SHALL DESIGN AND ANALYZE A GIMBALED BULKHEAD. THE CONTRACTOR SHALL DESIGN AND ANALYZE AN INTEGRATED ASTEROID CAPTURE SYSTEM INCORPORATING ALL SUBSYSTEMS DEFINED IN THE SOW. THE DESIGN AND ANALYSIS SHALL DEMONSTRATE COMPLIANCE WITH ALL PHYSICAL AND ENVIRONMENTAL INTERFACE REQUIREMENTS PROVIDED BY THE GOVERNMENT AT THE KICKOFF MEETING. THE DESIGN SHALL DEMONSTRATE THE ABILITY TO CAPTURE AND DESIGN AN ASTEROID OF THE CHARACTERISTICS DESCRIBED IN THE BAA. THE CONTRACTOR SHALL DEMONSTRATE COMPLIANCE WITH ALL INTERFACE ASSUMPTIONS USED IN THE ANALYSIS OF THE SUBSYSTEMS DESCRIBED IN THE AFOREMENTIONED PARAGRAPHS. UPON COMPLETION OF THE CAPTURE SYSTEM DESIGN AND ANALYSIS, THE CONTRACTOR SHALL CONDUCT AN INTERIM DESIGN REVIEW. THE CONTRACTOR SHALL IMPLEMENT A REVIEW ITEM DISCREPANCY (RID) SUBMISSION PROCESS AND PROVIDE IT TO THE GOVERNMENT AT THE SAME TIME AS THE DATA PACKAGE. THE CONTRACTOR SHALL DEVELOP A COMPONENT LEVEL TESTING PLAN FOR EACH OF THE THREE COMPONENT LEVEL TESTS. THE CONTRACTOR SHALL DEVELOP A SUBSCALE FUNCTIONAL TEST ARTICLE OF THE ASTEROID CAPTURE SYSTEM CONCEPT. THE CONTRACTOR SHALL DEVELOP AN ASTEROID SIMULATOR. THE CONTRACTOR SHALL USE THE TEST ARTICLES IN THE PREVIOUS TWO PARAGRAPHS TO PERFORM A FUNCTIONAL DEMONSTRATION OF ASTEROID CAPTURE. THE CONTRACTOR SHALL PROVIDE A FUNCTIONAL TEST REPORTS. MILESTONE REPORTS: UPON COMPLETION OF THE DESIGN TRADE STUDIES AND FINALIZATION OF THE CAPTURE SYSTEM CONCEPT, THE CONTRACTOR SHALL PROVIDE A TRADE STUDY REPORT. AS PART OF THE INTERIM DESIGN REVIEW, THE CONTRACTOR SHALL PROVIDE AN INTERIM DESIGN REVIEW REPORT. FINALLY, THE CONTRACTOR SHALL PROVIDE A FINAL TECHNICAL REPORT. |
| 0463 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $494.33K | 2009-06-04 | 2010-06-03 | 541330 | TASK ORDER 0463 SUPPORTS RESEARCH, DEVELOPMENT, TEST AND EVALUATION FUNDED EFFORTS IN SUPPORT OF THE PROGRAM EXECUTIVE OFFICER FOR SPECIAL PROGRAMS. THE PROGRAM EXECUTIVE OFFICER FOR SPECIAL PROGRAMS PROVIDES CRADLE TO GRAVE OVERSIGHT AND MANAGEMENT DIRECTION TO CLASSIFIED AND UNCLASSIFIED ACQUISITION PROGRAMS. |
| 0354 | TYBRIN CORPORATION | Department of Defense | $494.17K | 2012-08-30 | 2012-09-26 | 334111 | MISSION PLANNING |
| W912BV25F0023 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $494.15K | 2025-01-13 | 2025-09-12 | 541330 | FY28 B-21 SQUADRON OPERATIONS/AIRCRAFT MAINTENANCE UNIT FACILITY & ARMAMENTS STORAGE FACILITY DYESS AIR FORCE BASE PLANNING CHARRETTE REPORTS. |
| H9240419F0282 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $494.12K | 2019-09-20 | 2020-10-31 | 541519 | EO&M IMAC SUPPORT - COST |
| 19AQMM20F2899 | JACOBS GOVERNMENT SERVICES COMPANY | Department of State | $493.25K | 2020-08-25 | 2023-08-25 | 541330 | PROJECT SUPPORT SERVICES FOR U.S. EMBASSY, DJIBOUTI, REPUBLIC OF DJIBOUTI |
| N6247023F4127 | JACOBS/HDR, A JOINT VENTURE (NAVFAC ATLANTIC SRM) | Department of Defense | $493.25K | 2023-08-07 | 2024-08-06 | 541330 | FALL HAZARDS SURVEYS AND ASSESSMENTS |
| 0008 | JACOBS ENGINEERING GROUP INC. | Department of Defense | $493.22K | 2017-03-22 | 2017-10-08 | 541330 | B442 HVAC SYSTEM REPLACEMENT IGF::OT::IGF |
| 0218 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $492.88K | 2012-10-01 | 2014-12-31 | 541330 | ENGINEERING SUPPORT SERVICES (ESS) IV |
| N6247325F0445 | JACOBS GOVERNMENT SERVICES COMPANY | Department of Defense | $492.8K | 2025-09-24 | 2026-09-30 | 541310 | GAS STATION RENOVATION, NAVAL BASE VENTURA COUNTY, CA |
| N6945024F0588 | GEOSYNTEC JACOBS A JOINT VENTURE | Department of Defense | $492.76K | 2024-09-05 | 2027-08-31 | 541330 | 24M-DLA PENSACOLA FUEL FILL STANDS 1879 & 1880 AND FUEL PIER 1889 |
| 0007 | JACOBS FACILITIES INCORPORATED | Department of Defense | $492.66K | 2008-09-30 | 2010-12-31 | 541330 | NGA RIF SITE DESIGN FIELD INVESTIGATION |
| N4008521F5637 | JACOBS GOVERNMENT SERVICES COMPANY | Department of Defense | $492.65K | 2021-07-20 | 2024-08-06 | 541330 | PREPARE A DESIGN-BID-BUILD (DBB) CONSTRUCTION PACKAGE CONSISTING OF FULL PLANS, SPECIFICATIONS, DETAILED COST ESTIMATE, AND OTHER SERVICES AS REQUESTED TO PARTIALLY RENOVATE THE HVAC SYSTEM IN THE IDENTIFIED BUILDING AT THE NSA CRANE, INDIANA |
| 0025 | JACOBS FACILITIES INCORPORATED | Department of Defense | $492.59K | 2005-05-16 | 2006-05-12 | — | — |
| N6945021F2653 | AMENTUM TECHNOLOGY, INC. | Department of Defense | $492.56K | 2020-10-01 | 2020-12-31 | 561210 | MBOS UPL OPTION 01 BLANKET TASK ORDER 10/01/2020 TO 12/31/2020 |
| W9128A19F0057 | JACOBS GOVERNMENT SERVICES COMPANY | Department of Defense | $492.23K | 2019-09-04 | 2021-12-30 | 541310 | HDR-H CXA |
| N3943024F4127 | GEOSYNTEC JACOBS A JOINT VENTURE | Department of Defense | $492.17K | 2024-07-08 | 2026-07-07 | 541330 | IMPACT OF CHANGING CLIMATE ON WATER DEMAND AT NAVY INSTALLATIONS |