FedTALLY

Awards for “TOTAL SYSTEM SERVICES, INC.

25 awards on this page · sorted by amount · page 14

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
47PL0219F0174TOTAL SYSTEM SERVICES, INC.General Services Administration$8.48K
2019-07-162019-09-30561210JUNEAU ALASKA DOOR REPAIR/MAINTENANCE AND MARBLE PATCHING
47PL0224F0071TOTAL SYSTEM SERVICES, INC.General Services Administration$8.47K
2024-01-092024-09-30561210REPLACE DOOR HOIST OPERATOR - NARA - SEATTLE
GSP1014XA5035TOTAL SYSTEM SERVICES, INC.General Services Administration$8.43K
2014-07-102014-09-30561210IGF::OT::IGF REPLACEMENT OF DAMAGED COPPER PANELS ON ROOF OF THE US COURTHOUSE IN SEATTLE WA
47PL0218F0021TOTAL SYSTEM SERVICES, INC.General Services Administration$8.41K
2017-12-112018-02-15561210IGF::OT::IGF REPLACEMENT OF BROKEN BALLISTIC GLASS WINDOW IN JUDGE'S CHAMBER AT TACOMA UNION STATION IN TACOMA, WA.
GSP1016XA7024TOTAL SYSTEM SERVICES, INC.General Services Administration$8.39K
2016-04-202016-06-10561210IGF::OT::IGF INSPECTION&REPAIR OF ROOF LEAK AT FEDERAL ARCHIVES&RECORDS CENTER IN SEATTLE, WA.
47PL0218F0217TOTAL SYSTEM SERVICES, INC.General Services Administration$8.31K
2018-09-192019-05-31561210IGF::OT::IGF SNOW REMOVAL SERVICES BAKER CITY OR
GSP1014XA5034TOTAL SYSTEM SERVICES, INC.General Services Administration$8.26K
2014-06-302014-08-31561210IGF::OT::IGF REPLACEMENT OF FIRE ALARM PANEL AT FEDERAL ARCHIVES&RECORDS CENTER IN SEATTLE WA.
GSP1014XB0005TOTAL SYSTEM SERVICES, INC.General Services Administration$8.19K
2013-12-172014-01-31561210IGF::OT::IGF REPLACE 43 DAMAGED SHINGLES ON THE 120 BUILDING AT FEDERAL CENTER SOUTH
GSP1012XB0037TOTAL SYSTEM SERVICES, INC.General Services Administration$8.19K
2012-08-222012-08-31561210TASK ORDER
GSP1016XC7004TOTAL SYSTEM SERVICES, INC.General Services Administration$8.18K
2015-11-242015-12-24561720IGF::OT::IGF MAIN ENTRY DOOR REPAIR
GSP1014XB0037TOTAL SYSTEM SERVICES, INC.General Services Administration$8.17K
2014-09-092014-10-21561210IGF::OT::IGF REPAIR HIGH BAY ROLLUP DOOR AT FEDERAL CENTER SOUTH, SEATTLE, WA
GSP1012XA5010TOTAL SYSTEM SERVICES, INC.General Services Administration$8.15K
2012-01-122012-02-12238290DOOR CLOSURES
GSP1016XF7024TOTAL SYSTEM SERVICES, INC.General Services Administration$8.13K
2016-05-242016-07-20561210IGF::OT::IGF TASK ORDER TO PROVIDE AND INSTALL LED LIGHTING AT 911 US FEDERAL BLDG, PORTLAND, OR.
GSP1014XB0007TOTAL SYSTEM SERVICES, INC.General Services Administration$8.12K
2013-12-172014-01-31561210IGF::OT::IGF REPAIRS TO FCS HOT WATER TANK
GSP1015XC5007TOTAL SYSTEM SERVICES, INC.General Services Administration$8.12K
2014-11-132015-08-31561210IGF::OT::IGF SNOW REMOVAL SERVICES, JANITORIAL&RELATED SERVICES EASTPORT LPOE, PORTHILL LPOE PERIOD OF PERFORMANCE 10/01/2014 - 08/31/2015
GSP1017LS0048TOTAL SYSTEM SERVICES, INC.General Services Administration$8.11K
2017-03-242017-06-02561210IGF::OT::IGF ROOF REPAIRS, NATIONAL ARCHIVES&RECORDS ADMINISTRATION, 6125 SANDPOINT WAY NE, SEATTLE, WA 98115
GSP1012XF0015TOTAL SYSTEM SERVICES, INC.General Services Administration$8.05K
2012-08-292012-10-29238290IGF::OT::IGF REPAIR OF BOILER AT THE GUS SOLOMON FEDERAL COURTHOUSE
GSP1017LS0084TOTAL SYSTEM SERVICES, INC.General Services Administration$7.99K
2017-05-232017-05-31561210IGF::OT::IGF REPAIR TO CHILLER #1 AT THE HATFIELD COURTHOUSE IN PORTLAND, OR.
GSP1013XB0008TOTAL SYSTEM SERVICES, INC.General Services Administration$7.98K
2012-12-212013-03-05561210IGF::CT::IGF THIS SCOPE OF WORK IS TO REPLACE THE EXISTING FAILED HEAT PUMP THAT IS IN BUILDING 3 BAY 4. THIS WILL INCLUDE DISCONNECTING ALL POWER TO THE UNIT. EVACUATING ALL REMAINING REFRIGERANT THAT IS IN THE UNIT ( R-22). ONCE THESE TWO STEP HAVE BEEN PREFORMED WE WILL BE DISMANTLING THE UNIT AND REMOVING IT FROM THE ROOF. ONCE THE UNIT IS OFF THE ROOF WE WILL BE INSTALLING A NEW TRANSITION/CURB FOR AIRFLOW DIRECTION. AFTER THE CURD IS INSTALLED WE WILL HAVE A OUTSIDE CRANE COMPANY HOIST THE NEW 5 TON HEAT PUMP UP ONTO THE ROOF AND SET IT IN PLACE. ONCE THE UNIT IS SET IN PLACE WE WILL RUN NEW THERMOSTAT WIRE DOWN INTO THE BUILDING TO A NEW THERMOSTAT THAT WILL CONTROL THE HEAT PUMP. AFTER THE WIRES HAVE BEEN RAN WE WILL BE CONNECTING THE 460 VOLT POWER TO THE UNIT THEN WE WILL BE GOING THROUGH THE INITIAL START UP PHASE.
47PL0219F0176TOTAL SYSTEM SERVICES, INC.General Services Administration$7.97K
2019-07-222019-11-30561210ADDITIONAL SERVICES - JUNEAU FEDERAL BUILDING O&M SERVICES - JUNEAU, AK
47PL0218F0198TOTAL SYSTEM SERVICES, INC.General Services Administration$7.93K
2018-08-312018-10-15561210IGF::OT::IGF REPAIR OF THE OIL FIRED BOILERS AT THE JUNEAU FEDERAL BLDG IN JUNEAU, AK.
47PL0218F0109TOTAL SYSTEM SERVICES, INC.General Services Administration$7.93K
2018-05-092018-07-31561210IGF::OT::IGF GUS SOLOMON CH - UPGRADE 6TH ENTRY DOOR, PORTLAND, OR
GSP1011XF5035TOTAL SYSTEM SERVICES, INC.General Services Administration$7.91K
2011-07-082011-08-15811310REPAIR OF CHILLER REFRIGERANT LEAK
47PL0222F0079TOTAL SYSTEM SERVICES, INC.General Services Administration$7.91K
2022-03-102022-10-31561210REPLACE REFRIGERANT MONITOR - FDA BOTHELL. (BOTHELL, WA)
GSP1014XB0021TOTAL SYSTEM SERVICES, INC.General Services Administration$7.89K
2014-05-082014-07-07561210IGF::OT::IGF EMERGENCY GENERATOR FUEL FOR 5 LAND PORT OF ENTRY LOCATIONS. PERIOD OF PERFORMANCE, 5/8/14 TO 7/7/14. CONTRACT IS NOT TO EXCEED $9252.00