Awards for “OTAK, INC.”
25 awards on this page · sorted by amount · page 14
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 140P2122F0027 | OTAK, INC. | Department of the Interior | $34.73K | 2021-12-31 | 2022-12-12 | 541990 | NR-EQD-51 - BIRD ENERGETICS STUDY |
| INP13PD00609 | OTAK, INC. | Department of the Interior | $33.88K | 2013-05-06 | 2013-06-15 | 541330 | IGF::OT::IGF MACA 150067 RECONSTRUCT HISTORIC CAVE TRAILS MAMMOTH CAVE NATIONAL PARK EDMONSON COUNTY, KENTUCKY |
| INP12PD01611 | OTAK, INC. | Department of the Interior | $33.09K | 2012-06-07 | 2012-12-14 | 541330 | TITLE I DESIGN SERVICES FOR EL PORTAL WASTEWATER FACILITY HEADWORKS EQUIPMENT |
| INL11PD01042 | OTAK, INC. | Department of the Interior | $33.05K | 2011-07-29 | 2013-07-01 | 541310 | NHOTIC FIRE PROTECTION SYSTEM IMPROVEMEN |
| INPT2051080070 | OTAK, INC. | Department of the Interior | $31.68K | 2008-05-19 | 2009-02-01 | 541310 | TUSAYAN PILOT SHUTTLE TRANSPORTATION SYSTEM INPLEMENTATION AND EVALUATION |
| INPT2051090176 | OTAK, INC. | Department of the Interior | $31.58K | 2009-09-25 | 2010-01-08 | 541310 | EVALUATE EXISTING ROAD CONDITION AND PROVIDE ANALYSIS REGARDING THE FORMATION OF POTHOLES AND OTHER PAVEMENT DISTRESSES ALONG OLD MINE ROAD AT DELAWARE WATER GAP NATIONAL RECREATION AREA (DEWA). ALSO PROVIDE RECOMMENDATIONS FOR REPAIR OF THE PAVEMENT AND/OR ROAD. |
| INL14PD00524 | OTAK, INC. | Department of the Interior | $30.93K | 2014-06-06 | 2014-07-17 | 541320 | IGF::OT::IGF HORNING SEED ORCHARD AE SERVICES |
| INF09PD78290 | OTAK, INC. | Department of the Interior | $30.37K | 2009-05-22 | 2011-12-31 | 541310 | TRANSPORTATION STUDY |
| INL08PD02515 | OTAK, INC. | Department of the Interior | $29.67K | 2008-03-14 | 2008-06-12 | 541310 | MULTI-DISCIPLINARY ARCHITECT ENGINEER, IDIQ |
| INL09PD00968 | OTAK, INC. | Department of the Interior | $28.81K | 2009-07-09 | 2010-09-10 | 541310 | PRINEVILLE SURVEY, LA PINE PARCEL, DIST. |
| INP17PD00378 | OTAK, INC. | Department of the Interior | $28.65K | 2017-01-25 | 2017-05-31 | 541310 | IGF::OT::IGF NOGRN PINN 232689, SUPPLEMENTAL SERVICES FOR DATA COLLECTION PLANNING WORKSHOP MEETING AT PINNACLES NATIONAL PARK, PINNACLES NATIONAL PARK, SAN BENITO COUNTY, CALIFORNIA |
| 140P2019F0351 | OTAK, INC. | Department of the Interior | $27.71K | 2019-09-25 | 2020-06-06 | 541310 | FOVA 174966H MOD 2 TITLE III TASK ORDER |
| INL08PD02519 | OTAK, INC. | Department of the Interior | $27.4K | 2008-08-27 | 2008-10-21 | 541310 | MULTI-DISCIPLINARY ARCHITECT ENGINEER, IDIQ |
| INPT1700097017 | OTAK, INC. | Department of the Interior | $27.14K | 2009-09-09 | 2011-04-30 | 541310 | ACADIA NATIONAL PARK MISC. MEETINGS FOR STANLEY BROOK |
| 140P2018F0007 | OTAK, INC. | Department of the Interior | $27K | 2017-11-30 | 2018-05-29 | 541310 | IGF::OT::IGF MORU-219680 - GEOTECHNICAL SERVICES, REPLACE MOUNT RUSHMORE NATIONAL MEMORIAL PLAZA PAVER SYSTEM AND REHABILITATE VISITOR CENTER, MOUNT RUSHMORE NATIONAL MEMORIAL, CUSTER, SOUTH DAKOTA |
| INPT2051100169 | OTAK, INC. | Department of the Interior | $26.95K | 2010-06-28 | 2010-10-15 | 541310 | JOTR 158650 TOPOGRAPHIC SURVEY FOR ROUTE 900A PARKING AREA |
| INP17PD00737 | OTAK, INC. | Department of the Interior | $26.94K | 2017-05-25 | 2017-09-02 | 541310 | IGF::OT::IGF X:NOGRN SLBE 232252 - PERMITTING FOR PLATTE RIVER RECREATION AREA TARGETED ACCESSIBILITY IMPROVEMENT PROGRAM (TAIP) |
| 140P2122F0019 | OTAK, INC. | Department of the Interior | $25.78K | 2022-01-04 | 2022-07-01 | 541990 | NR-EQD-38 - SEM DRAW YEARS 2-4 |
| INP17PD01555 | OTAK, INC. | Department of the Interior | $24.85K | 2017-06-21 | 2017-08-31 | 541310 | IGF::OT::IGF X:NOGRN ARCHITECTURAL/ENGINEERING (A/E) DESIGN SERVICES FOR ASSESSING PROJECT DESIGN SCOPE (SCOPING STUDY), THEODORE ROOSEVELT NATIONAL PARK, CONVERT HISTORIC PEACEFUL VALLEY RANCH INTO ENVIRONMENTAL EDUCATION CENTER, THRO 228216 |
| 140P2121F0074 | OTAK, INC. | Department of the Interior | $24.72K | 2021-04-28 | 2023-02-28 | 541990 | NR-EQD-296 - GERO VISITOR USE STUDY |
| INL13PB00928 | OTAK, INC. | Department of the Interior | $24.69K | 2013-09-18 | 2014-03-07 | 541620 | IGF::CT::IGF VISUAL RESOURCE INVENTORY |
| INL13PD00711 | OTAK, INC. | Department of the Interior | $23.34K | 2013-07-24 | 2013-08-16 | 541320 | IGF::OT::IGF HSO BUILDING EVALUATION - AE SERVICES |
| INL09PD02293 | OTAK, INC. | Department of the Interior | $22.12K | 2009-09-22 | 2010-05-07 | 541310 | TAS:14 1112::TAS RECOVERY - BAKER GROUND SOURCE HEAT PUMP FEASIBILITY STUDY - WORK CONSISTS OF REVIEWING EXISITING HVAC CONDITIONS AND DEVELOP A WRITTEN REPORT DETAILING THE FEASIBILITY OF DESIGN AND INSTALLATION OF A GROUND SOURCE HEAT PUMP HVAC SYSTEM. |
| INPT2051080061 | OTAK, INC. | Department of the Interior | $20.23K | 2008-04-30 | 2008-12-15 | 541310 | TRANSPORTATION ANALYSIS |
| INL08PD02517 | OTAK, INC. | Department of the Interior | $19.17K | 2008-06-06 | 2008-08-05 | 541310 | MULTI-DISCIPLINARY ARCHITECT ENGINEER, IDIQ |