Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
47PK0123C0003CEBUANA CONSTRUCTION INCGeneral Services Administration$12.84M
2023-09-252026-01-24236220"11000 WILSHIRE 24/7 HVAC", 11000 WILSHIRE FEDERAL BUILDING, LOS ANGELES, CA
47PK1723C0020CEBUANA CONSTRUCTION INCGeneral Services Administration$3.52M
2023-09-012024-10-25236220AWARD OF CONTRACT NO. 47PK1723C0020 "LOBBY ROOF REPLACEMENT" WILSHIRE FEDERAL BUILDING, 11000 WILSHIRE BLVD., LOS ANGELES, CA
47PK1724C0017CEBUANA CONSTRUCTION INCGeneral Services Administration$3.23M
2024-09-092027-01-14236220AWARD OF CONTRACT NO. 47PK1724C0017, "LONG BEACH ELEVATOR MODERNIZATION PHASE 1," GLENN M. ANDERSON FEDERAL BUILDING, 501 W. OCEAN BLVD., LONG BEACH, CA
47PD5426C0001CEBUANA CONSTRUCTION INCGeneral Services Administration$2.2M
2025-12-102026-10-23236220AWARD OF CONTRACT NO. 47PD5426C0001 - FBI CHILLER REPLACEMENT
W912PL25FA032CEBUANA CONSTRUCTION INCDepartment of Defense$2.06M
2025-09-252027-03-20236220POCA TASK ORDER TO CEBUANA CONSTRUCTION, INC FOR REPLACE MULTIPLE GENERATORS AT MARCH ARB
1305M425C0028CEBUANA CONSTRUCTION INCDepartment of Commerce$1.6M
2025-09-252027-03-31238210THE EXISTING EPG SYSTEMS LOCATED AT THE WFO LOS ANGELES/OXNARD (LOX) AND THE WFO SAN JOAQUIN VALLEY / HANFORD LOCATION (HNX) HAVE SURPASSED THEIR LIFE EXPECTANCY WITH AVAILABILITY OF PARTS AND REPAIRS BECOMING INCREASINGLY DIFFICULT TO MAINTAIN. AT E
47PK0523C0012CEBUANA CONSTRUCTION INCGeneral Services Administration$1.48M
2023-07-192024-02-24236220VAN NUYS CHILLERS REPLACEMENT: JAMES CORMAN FEDERAL BUILDING - 6230 VAN NUYS BLVD, VAN NUYS, CA 91401
47PK1725C0001CEBUANA CONSTRUCTION INCGeneral Services Administration$1.1M
2024-10-212025-08-28236220AWARD OF CONTRACT NO. 47PK1725C0001, VAN NUYS COOLING TOWER REPLACEMENT
47PK1722C0031CEBUANA CONSTRUCTION INCGeneral Services Administration$879.08K
2022-08-012024-12-16236220AWARD OF CONTRACT NO 47PK1722C0031, DESIGN BUILD ATS REPLACEMENT, WILSHIRE FEDERAL BUILDING, 11000 WILSHIRE BLVD., LOS ANGELES, CA
47PK1723C0016CEBUANA CONSTRUCTION INCGeneral Services Administration$679.65K
2023-05-262024-06-23236220CONTRACT 47PK1723C0016 IS FORDESIGN BUILD SERVICES FOR T1 ROOM RENOVATIONS FOR FBI AT WILSHIRE FEDERAL BUILDING11000 WILSHIRE BLVD, LOS ANGELES, CA 90024
47PK0724C0004CEBUANA CONSTRUCTION INCGeneral Services Administration$249.1K
2023-11-292024-12-31236220DESIGN BUILD SERVICES FOR AN INTRUSION DETECTION SYSTEM AT THE PRINDLE SEIZED FACILITY AT 9020 AIRWAY ROAD, SAN DIEGO, CALIFORNIA.
47PK0625C0008CEBUANA CONSTRUCTION INCGeneral Services Administration$197.49K
2025-07-022026-04-30238990350 W 1ST STREET ELECTRICAL POWER QUALITY STUDY, 350 W. 1ST ST., LOS ANGELES, CA.
12905B22P0230CEBUANA CONSTRUCTION INCDepartment of Agriculture$176.13K
2022-09-142022-12-23237130REPLACEMENT OF TRANSFORMERS AND SWITCHES
47PK0624C0031CEBUANA CONSTRUCTION INCGeneral Services Administration$174.96K
2024-08-072025-02-21236220PASSPORT MINI SPLIT, 11000 WILSHIRE BLVD, LOS ANGELES, CA
47PK1722C0034CEBUANA CONSTRUCTION INCGeneral Services Administration$128.99K
2022-10-032023-01-31238210CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EXPERTISE AND SUPERVISION TO INSTALL AC UNIT INSTALLATION AT WILSHIRE FB, 11000 WILSHIRE BLVD., LOS ANGELES, CA
47PK1823C0007CEBUANA CONSTRUCTION INCGeneral Services Administration$122.04K
2023-04-192023-12-15238210CONTRACTOR TO PROVIDE LABOR AND MATERIALS TO INSTALL 2 DUAL EV CHARGING STATIONS AT THE RONALD REAGAN FEDERAL BUILDING AND UNITED STATES COURTHOUSE LOCATED AT 411 W 4TH ST., SANTA ANA, CA 92701
47PK0624C0026CEBUANA CONSTRUCTION INCGeneral Services Administration$119.05K
2024-04-262024-10-31238210CHFB USCIS OIT TEMPORARY GENERATOR
47PD5426C0003CEBUANA CONSTRUCTION INCGeneral Services Administration$79.57K
2026-03-032026-06-01236220ASSESS AND TROUBLESHOOT THE MAIN SWITCH GEAR AND BUSDUCT. PROVIDE REPAIRS TO RESTORE POWER TO THE BUILDING AT LOS ANGELES FEDERAL COURTHOUSE.
47PK0625C0009CEBUANA CONSTRUCTION INCGeneral Services Administration$72.04K
2025-07-282025-09-30238210WLA FBI 17TH FL TRANSFORMER REPLACEMENT
47PK0824C0001CEBUANA CONSTRUCTION INCGeneral Services Administration$59.39K
2024-01-222024-07-22238220CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EXPERTISE AND SUPERVISION FOR THE MECHANICAL REPAIRS LOCATED AT LAFO, US PASSPORTS, 11000 WILSHIRE BLVD., LOS ANGELES, CA.
47PK0625C0004CEBUANA CONSTRUCTION INCGeneral Services Administration$54K
2024-11-252025-11-01238220WLA WILSHIRE GARAGE 2 TANKLESS WATER HEATERS, 11000 WILSHIRE BLVD., LOS ANGELES, CA
47PK1820P0031CEBUANA CONSTRUCTION INCGeneral Services Administration$30.05K
2020-07-142020-11-29238210CEBUANA CONSTRUCTION IS TO PROVIDE LABOR AND MATERIALS TO PROVIDE AND INSTALL RELOCATE THE SERVER ROOM UPS WIRES FROM A AND B. WORK TO TAKE PLACE AT CHFB
47PK1723C0008CEBUANA CONSTRUCTION INCGeneral Services Administration$26.24K
2023-02-152023-03-31236220CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS AND EXPERTISE FOR WILSHIRE FB EXCAVATION FOR WATERPROOFING STUDY LOCATED AT WILSHIRE FB, 11000 WILSHIRE BLVD., LOS ANGELES, CA 90024.
47PK1819P0001CEBUANA CONSTRUCTION INCGeneral Services Administration$25.58K
2018-10-162019-06-17238320PROVIDE ALL NECESSARY SUPERVISION COORDINATION PLANNING LABOR AND MATERIALS TO ACCOMPLISH THE FOLLOWING A. MEETING ROOM 3110 1. MOVE EXISTING OFFICE FURNITURE AND PLACE IN STORAGE DESIGNATED BY U.S. TRUSTEES. OFFICE FURNITURE WILL BE MOVED BACKED TO ROOM 3110 AT THE COMPLETION OF WORK. 2. PATCH AND REPAIR DRYWALL TO INCLUDE HOLES DENTS AND TEARS. TOUCH UP WALLS AS REQUIRED. 3. PAINT ALL INTERIOR WALLS LOCATED IN MEETING ROOM. SURFACE WILL INCLUDE PREP PRIMER AND TWO COATS OF PAINT. COLOR TO BE MATCHED WITH EXISTING BUILDING STANDARD. 4. REMOVE EXISTING BASEBOARDS IN MEETING ROOMS. FURNISH AND INSTALL NEW COVE BASE TO MATCH COLOR AND SPECIFICATION OF EXISTING BUILDING STANDARD. 5. REMOVE AND DISPOSE OF EXISTING CARPET TILE IN MEETING ROOM. 6. REPLACE CARPET TILE WITH THE FOLLOWING SPECIFICATION A. MANUFACTURER SHAW B. STYLE NAME TECHNIQUE TILE C. STYLE NUMBER 5T022 D. COLOR NAME MAPLE E. COLOR NUMBER 22761 F. TUFTED WEIGHT 34.00 OZ. G. CONSTRUCTION MULTI LEVEL PATTERN CUT LOOP 7. INSTALL CHAIR RAILS ON ALL EXISTING INTERIOR WALLS AT 30IN HEIGHT WITH THE FOLLOWING THE SPECIFICATION PAGE 2 OF 2 8. PROPERLY DISASSEMBLE AND REMOVE WALL FIXTURES FOR THE INSTALLATION OF CHAIR RAILS. WALL FIXTURES WILL BE RELOCATED IN CLOSE VICINITY OF ORIGINAL LOCATION.
47PK1819P0008CEBUANA CONSTRUCTION INCGeneral Services Administration$24.92K
2019-02-252019-06-26238210PROVIDE UPGRADED OR ENHANCED LED LIGHTING AT THE FIRST AND SECOND FLOOR LOADING DOCK. 2. INCLUDE ALL ELECTRICAL WIRING, TERMINATIONS, LOW VOLTAGE CABLING, SAFETY DEVICES, ETC FOR A COMPLETE OPERATIONAL SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR EXTENDING POWER TO ALL REQUIRED COMPONENTS. 3. CONTRACTOR SHALL SUPPLY ALL REQUIRED MISCELLANEOUS AND INCIDENTAL EQUIPMENT, INCLUDING WIRE, NUTS, BOLTS, ANCHORS, SUPPORTS, CLIPS, SHIMS, AND OTHER REQUIREMENTS FOR INSTALLATION. 4. THE CONTRACTOR TO FIND THE MOST COST EFFECTIVE AND ENERGY EFFICIENT LIGHT SOURCE. 5. PATCH AND REPAIR ALL AREAS AFFECTED BY WORK. PER THE RFP DATED: FEBRUARY 1, 2019 AMENDMENT NO. 1&AMENDMENT NO. 2