Company profile
Federal contracts won by Northrop Grumman
25 of Northrop Grumman's largest federal contract awards total $85.3B, led by a $13.72B award from Department of Defense. Data from USAspending.gov.
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| FA821920C0006 | NORTHROP GRUMMAN SYSTEMS CORP | Department of Defense | $13.72B | 2020-09-08 | 2029-03-10 | 336414 | GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) |
| F4261098C0001 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $10.01B | 1998-07-01 | 2025-11-30 | 541330 | 200506!000026!5700!FA8214!OO-ALC/PKME/LMKE !F4261098C0001 !A!N! !Y! !P01502!20041213!20050701!001563738!004179453!016435559!N!NORTHROP GRUMMAN SPACE & MISSI!888 S 2000 E !CLEARFIELD !UT!84015!13850!011!49!CLEARFIELD !DAVIS !UTAH !-000001960000!N!N!000000000000!L014!TECH REP SVCS/GUIDED MISSILES !A2 !MISSILE AND SPACE SYSTEMS !302 !MINUTEMAN III GRP !541330!E! !3! ! !C! ! !20200930!B! ! !A! !A!N!L!2!002!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! ! |
| N0001918C1037 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $8.48B | 2018-02-15 | 2030-02-01 | 336411 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) |
| N0001913C9999 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $5.38B | 2013-05-13 | 2026-12-31 | 336411 | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2) |
| NNM07AA75C | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $4.43B | 2006-04-17 | 2026-12-31 | 336415 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS |
| F0470102C0502 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $4.4B | 2002-08-23 | 2018-09-30 | 336414 | — |
| GSFC0200211DNAS502200 | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $4.35B | 2003-10-01 | 2022-12-25 | 336414 | THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY. |
| FA881018C0006 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $3.46B | 2018-06-25 | 2031-04-11 | 541715 | NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY. |
| N0001908C0023 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $3.23B | 2008-04-22 | 2023-03-31 | 336411 | TAS::17 1319::TAS SYSTEM DEVELOPMENT AND DEMONSTRATION |
| N0001903C0057 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $3.08B | 2003-08-04 | 2022-09-30 | 336411 | — |
| HQ085621C0003 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $2.4B | 2021-03-25 | 2028-12-31 | 541715 | DESIGN, DEVELOPMENT, AND DEVELOPMENTAL TESTING OF THE NEXT GENERATION INTERCEPTOR (NGI) ALL-UP-ROUND (AUR) |
| F0470102C0009 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.93B | 2002-04-18 | 2023-12-31 | 541710 | 200208!000056!5700!CZ39 !SMC/PKZ LOS ANGELES AFB !F0470102C0009 !A!N! !N! !20020418!20100930!008324949!008324949!004179453!N!TRW INC !1 SPACE PARK BLVD !REDONDO BEACH !CA!90278!60018!037!06!REDONDO BEACH !LOS ANGELES !CALIFORNIA!+000010000000!N!N!000665000000!AC22!RDTE/MISSILE AND SPACE SYSTEMS-APPLIED RESEARCH !A2 !MISSILE AND SPACE SYSTEMS !3000!NOT DISCERNABLE OR CLASSIFIED !541710!E! !1! ! ! ! ! !99990909!B! ! !N!A!D!N!R!1!001!N!2A!A!Y!Z! ! !N!C!N! ! ! !A!Z!A!A!000!A!C!N! ! ! !Y! ! !0001! |
| N0001919C0008 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.81B | 2019-05-29 | 2029-01-31 | 336411 | MQ-4C TRITON LRIP LOT 5 LONG LEAD ITEMS TO SUPPORT U.S. NAVY AND COOPERATIVE PARTNER AUSTRALIA. |
| FA861517C6047 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.75B | 2017-05-31 | 2029-01-29 | 334511 | F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED |
| F1962800C0100 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.73B | 2000-01-11 | 2021-09-30 | 334511 | 200103!000014!5700!GV47 !ESC/JSK !F1962800C0100 !A!N!*!N! !20001211!20031231!938535028!008255408!016435559!N!NORTHROP GRUMMAN SYSTEMS CORPO!ONE HORNET WAY !EL SEGUNDO !CA!90245!22412!037!06!EL SEGUNDO !LOS ANGELES !CALIFORNIA!+000020000000!N!N!000000000000!5841!RADAR EQUIPMENT, AIRBORNE !A7 !ELECTRONICS AND COMMUNICATION !3000!NOT DISCERNABLE OR CLASSIFIED !334511!*!*!1! ! ! !*!*!*!B!*!*!A! !D !U!R!1!001!N!1G!A!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! !Y! ! !0001! |
| NNH15CN76C | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | $1.63B | 2015-09-03 | 2029-05-31 | 541712 | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS |
| N0001910C0044 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.63B | 2010-03-15 | 2019-04-30 | 336411 | E-2D ADVANCED HAWKEYE AIRCRAFT (LRIP 3) |
| FA862512C6598 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.6B | 2012-02-17 | 2022-04-30 | 334419 | ACAT 1C, ASC/WLY, LAIRCM FOLLOW-ON (LAF) |
| FA872609C0010 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.58B | 2009-06-24 | 2018-02-02 | 334419 | BATTLEFIELD AIRBORNE COMMUNICATIONS NODE RAPID FIELDING |
| HQ014711C0006 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.53B | 2011-03-07 | 2026-09-30 | 336414 | IRBM TARGETS |
| M6785419C0043 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.51B | 2019-06-07 | 2029-04-13 | 334511 | G/ATOR GAN FRP LOT 1 QTY 4 |
| W31P4Q08C0418 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.51B | 2008-09-23 | 2022-05-31 | 336419 | INTEGRATED AIR AND MISSILE DEFENSE (IAMD)BATTLE COMMAND SYSTEM (IBCS) BASIC AWARD FOR STEP I/PHASE-I PRELIMINARY DESIGN REVIEW (PDR) |
| W15QKN13C0074 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.49B | 2013-08-30 | 2029-03-31 | 332992 | TO AWARD PRODUCTION EFFORT FOR THE PRECISION GUIDANCE KIT (PGK)TO INCLUDE ARMY, MARINES, FMS QUANTITIES, FFP, BASE WITH 2 OPTIONS INCLUDING SPECIAL LICENSE RIGHTS (TDP). |
| N0002420C5519 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.41B | 2020-09-30 | 2029-12-19 | 334511 | BLOCK 3 EA SUBSYSTEM HEMISPHERE PRODUCTION |
| 0001 | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | $1.27B | 2007-12-05 | 2020-05-15 | 541511 | GCSS-ARMY (F/T) |
Showing the top 25 awards by amount. Search all Northrop Grumman awards →