FedTALLY

Awards for “boeing

25 awards on this page · sorted by amount · page 1

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
FA862511C6600THE BOEING COMPANYDepartment of Defense$31.97B
2011-02-242027-07-31336411KC-X MODERNIZATION PROGRAM
NAS1510000THE BOEING COMPANYNational Aeronautics and Space Administration$22.44B
1993-11-152026-09-30336414INTERNATIONAL SPACE STATION
HQ000601C0001THE BOEING COMPANYDepartment of Defense$18.76B
2000-12-222015-12-31541720200112!000108!9700!ZD60 !BALLISTIC MISSILE DEFENSE ORG. !HQ000601C0001 !A!N!*!N! !20001222!20080930!848025649!848025649!009256819!N!THE BOEING COMPANY !3370 E MIRALOMA AVE !ANAHEIM !CA!92806!37000!089!01!HUNTSVILLE !MADISON !ALABAMA !+000383571022!N!N!000000000000!AD93!RDTE/OTHER DEFENSE-ADV TECH DEV !S1 !SERVICES !1CAA!BALLISTIC MISSILE DEFENSE SYS !541710!*!*!3! ! ! !*!*!*!B!*!*!A! !A !U!R!2!001!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001!
N0001914C0067THE BOEING COMPANYDepartment of Defense$18.11B
2014-08-142027-11-30336411USN P-8A FRP II LONG LEAD MATERIAL
W56HZV05C0724THE BOEING COMPANYDepartment of Defense$12.74B
2005-09-232014-12-31541330200512!010860!2100!W56HZV!TACOM - WARREN !W56HZV05C0724 !A!N! !Y! ! !20050923!20141231!016544780!016544780!009256819!N!THE BOEING COMPANY !J S MCDONNELL BLVD !SAINT LOUIS !MO!63166!65000!510!29!ST. LOUIS !ST. LOUIS (CITY) !MISSOURI !+000219245691!N!N!000000000000!AZ15!RDTE/OTHER RESEARCH&DEVELOPMENT-ENG/MANUF DEVEL !S1 !SERVICES !301 !FCS !541330!E! !1! ! ! ! ! !20200930!B! ! !A! !D!U!U!1!001!N!1A!Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! ! TAS::21 2040::TAS
N0001904C0014THE BOEING COMPANYDepartment of Defense$11.44B
2003-12-292017-01-30336411200411!000011!1700!AA4M0 !NAVAL AIR SYSTEMS COMMAND !N0001904C0014 !A!N! !N! ! !20031229!20110930!149879157!006265946!009256819!N!MCDONNELL DOUGLAS CORPORATION !J S MCDONNELL BLVD !SAINT LOUIS !MO!63166!65000!510!29!ST. LOUIS !ST. LOUIS (CITY) !MISSOURI !+000166491870!N!Y!008662099934!1510!AIRCRAFT FIXED WING !A1A!AIRFRAMES AND SPARES !549 !F/A-18 E/F !336411!E! !3!C!S! ! ! !99990909!B! ! !A! !D!U!K!1!001!N!1A!A!W!F! ! !N!C!N! ! ! !Z!Z!A!A!000!A!B!N! ! ! !Y! ! !0001! !
FA863412C2651THE BOEING COMPANYDepartment of Defense$11.2B
2012-03-082023-05-31336411RSAF F-15 FLEET MODERNIZATION PROGRAM
FA861404C2004THE BOEING COMPANYDepartment of Defense$11.09B
2003-10-022017-10-31336411
N0001907C0001BELL BOEING JOINT PROJECT OFFICEDepartment of Defense$11.04B
2007-04-022018-08-06336411MV-22 AIRCRAFT - FY08 (LOT 12)*
NNM07AB03CTHE BOEING COMPANYNational Aeronautics and Space Administration$10.52B
2007-09-012028-12-31336414PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
F3365702C2001THE BOEING COMPANYDepartment of Defense$10.01B
2002-08-152020-12-11336411
N0001999C1226THE BOEING COMPANYDepartment of Defense$9B
1999-02-122017-12-06336411199908!1700!0757!AA4E0!NAVAL AIR SYSTEMS COMMAND !N0001999C1226 !A!*!* !19990212!20000930!161213269!006265946!009256819!N!76301!MCDONNELL DOUGLAS CORPORATION !P.O. BOX 516 !SAINT LOUIS !MO!63166!65000!510!29!ST. LOUIS !ST. LOUIS (CITY) !MISSOURI !0001!+000040000000!N!N!000000000000!1510!AIRCRAFT FIXED WING !A1A!AIRFRAMES AND SPARES !2AFX!F-18 HORNET !3721!1!*!*!*!B!A!*!D !N!L!1!001!N!1A!A!N!F!* !* !N!C!*!A!A!A!A!A!*!* !*!N!A!A!N!*!*!*!*!*!
F3365796C2059THE BOEING COMPANYDepartment of Defense$8.34B
2000-01-312004-11-30336411
N0001904C3146THE BOEING COMPANYDepartment of Defense$7.63B
2004-06-292026-08-31336411
W58RGZ16C0023THE BOEING COMPANYDepartment of Defense$7.47B
2016-03-212028-03-31336411W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS.
N0001912C2001BELL BOEING JOINT PROJECT OFFICEDepartment of Defense$7.34B
2011-12-292021-09-30336411PROCUREMENT OF V-22 LOT 17 LONG LEAD-TIME ITEMS
N0001909C0019THE BOEING COMPANYDepartment of Defense$7.25B
2008-12-042022-10-31336411F/A-18 AIRCRAFT
FA863418C2701THE BOEING COMPANYDepartment of Defense$6.99B
2017-12-222027-11-30336411F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENT
N0001917C0015BELL BOEING JOINT PROJECT OFFICEDepartment of Defense$6.88B
2016-12-282028-01-31336411CMV-22 PRODUCTION LOT 22 LONG LEAD-TIME ITEMS
HQ014712C0004THE BOEING COMPANYDepartment of Defense$6.47B
2011-12-302025-12-31541712THE MISSILE DEFENSE AGENCY (MDA), GROUND-BASED MIDCOURSE DEFENSE (GMD) DEVELOPMENT AND SUSTAINMENT CONTRACT (DSC) THE GMD DSC WORK INCLUDES, BUT IS NOT LIMITED TO: 1) FUTURE DEVELOPMENT; 2) FIELDING; 3) TEST; 4) SYSTEMS ENGINEERING, INTEGRATION AND CONFIGURATION MANAGEMENT; 5) EQUIPMENT MANUFACTURING AND REFURBISHMENT; 6) TRAINING; AND 7) OPERATIONS AND SUSTAINMENT SUPPORT FOR THE GMD WEAPON SYSTEM AND ASSOCIATED SUPPORT FACILITIES.
N0001909C0022THE BOEING COMPANYDepartment of Defense$5.7B
2009-04-132018-07-31336411P-8A LRIP I LONG LEAD MATERIAL
N0001912C0112THE BOEING COMPANYDepartment of Defense$5.54B
2012-08-312031-10-13336411P-8A FRP LOT I LONG LEAD MATERIAL
N0001918C1046THE BOEING COMPANYDepartment of Defense$5.5B
2018-05-082028-08-31336411F/A-18E AIRCRAFT
W58RGZ13C0002THE BOEING COMPANYDepartment of Defense$4.86B
2013-06-102022-09-30336411CH-47F CARGO HELICOPTER MULTIYEAR II. 34 NEW BUILD HELICOPTERS AND 121 RENEW HELICOPTERS.
HQ014719C0004THE BOEING COMPANYDepartment of Defense$4.44B
2019-03-182029-03-31541714GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENG