FedTALLY

Awards for “BAE SYSTEMS SPACE & MISSION SYSTEMS INC.

25 awards on this page · sorted by amount · page 1

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
FA881018C0002BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$533.99M
2017-11-152028-01-15336414WEATHER SYSTEM FOLLOW-ON - MICROWAVE - SYSTEM DESIGN OF SATELLITE WITH MICROWAVE RADIOMETER AND SENSOR
NNG10XA01CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$482.89M
2010-09-102029-11-10334511ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT.
NNG10AZ45DBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$365.73M
2010-09-232021-09-30336414JPSS-1 MISSION SPACECRAFT RAPID III DELIVERY ORDER #3. RAPID III PROVIDES CORE SPACECRAFT SYSTEMS IN SUPPORT OF THE SCIENTIFIC AND TECHNOLOGY DEVELOPMENT GOALS OF THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION, GODDARD SPACE FLIGHT CENTER, AND OTHER FEDERAL AGENCIES. THE SCOPE OF WORK INCLUDES DESIGN, BUILD AND TEST, PAYLOAD INTEGRATION AND TEST, LAUNCH VEHICLE INTEGRATION AND SUPPORT AND ON-ORBIT CHECKOUT AND ACCEPTANCE.
80GSFC18C0083BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$307.8M
2018-05-242026-12-31336414THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
80GSFC23CA072BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$236M
2023-09-122050-10-31541330GEOXO SOUNDER INSTRUMENT
NNG05HY12CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$233.72M
2005-03-222017-10-31336414NATIONAL AERONAUTICAL&SPACE ADMINISTRATION (NASA) AND THE GODDARD SPACE FLIGHT CENTER (GSFC) HAS A REQUIREMENT FOR THE CONTINUATION OF THE GLOBAL PRECIPITATION MEASUREMENT (GPM) MICROWAVE IMAGER (GMI) INSTRUMENT. THE GMI INSTRUMENT IS A 13 CHANNEL RADIOMETER WHOSE CORE SCIENCE MEASURES THE EARTH S ATMOSPHERIC MOISTURE WITHIN 10.65 GHZ THROUGH 183 GHZ OF THE MICROWAVE SPECTRUM.
GSFC0200002DNAS500106BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$209.46M
2000-02-152017-03-06541710RAPID SPACECRAFT ACQUISITION MASTER CONTRACT
NNG07HW18CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of the Interior$185.38M
2007-07-202013-05-31541330THIS PROCUREMENT IS FOR THE OLI INSTRUMENT FOR THE NEXT SPACECRAFT IN THE LANDSAT SERIES OF SATELLITES. THIS PROCUREMENT WILL RESULT IN THE AWARD OF A SINGLE COST-PLUS-AWARD-FEE (CPAF) CONTRACT WITH A PERFORMANCE INCENTIVE. LANDSAT SATELLITES HAVE PROVIDED THE ONLY CONTINUOUS LAND IMAGES SINCE 1972; THE ARCHIVE OF THESE IMAGES IS IN THE CARE OF THE USGS. THE OLI INSTRUMENT IS SCHEDULED TO BE LAUNCHED ON THE LANDSAT SATELLITE IN 2011. PUBLIC LAW 102-155, LAND REMOTE SENSING POLICY ACT OF 1992, STATES THAT NASA MUST MAINTAIN LANDSAT DATA CONTINUITY, AND PUBLIC LAW 105-303, COMMERCIAL SPACE ACT OF 1998, STATES THAT NASA SHOULD ACQUIRE REMOTE SENSING DATA. WHILE COMPLIANCE WITH THE LAWS IS REQUIRED FROM NASA, THE DEVELOPMENT OF LANDSAT IS DONE THROUGH A PARTNERSHIP WITH THE USGS FOR SATELLITE OPERATIONS AND DATA COLLECTION. FOLLOWING LAUNCH AND ACCEPTANCE OF THE LANDSAT SATELLITE, THE CONTRACT WILL BE TRANSITIONED TO USGS FOR SATELLITE OPERATIONS AND DATA COLLECTION.
NNM15AA18CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$117.75M
2015-10-012027-01-31541712IGF::CL::IGF IMAGING X-RAY POLARIMETRY EXPLORER (IXPE) PHASE A
80GSFC20F0070BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$104.05M
2020-06-252026-06-30336414SPACE WEATHER FOLLOW ON - LAGRANGE 1 (SWFO-L1) SPACECRAFT
80GSFC25F7007BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$103.38M
2025-02-242035-02-24336414SPACE WEATHER NEXT LAGRANGE SERIES SPACECRAFT: SATELLITE BUS, SATELLITE INTEGRATION AND TEST SERVICES, SATELLITE LAUNCH SUPPORT AND COMMISSIONING SERVICES, MISSION OPERATIONS, DATA ACQUISITION, AND ROUTING SERVICES.
NNG16HS00CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$100.01M
2015-12-302022-02-28336419IGF::CL::IGF THIS REQUIREMENT IS FOR THE DEVELOPMENT AND DELIVERY OF THE OPERATIONAL LAND IMAGER 2 (OLI-2) INSTRUMENT. IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT, THE CONTRACT, ALL ASSOCIATED REQUIREMENTS DOCUMENTS, AND THE OTHER ATTACHMENTS AND APPLICABLE DOCUMENTS TO THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE EFFORT AND RESOURCES THAT INCLUDE, BUT ARE NOT LIMITED TO, PERSONNEL, SUBJECT MATTER EXPERTISE, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY FOR THE SUCCESSFUL AND ON-TIME IMPLEMENTATION OF THE DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TEST, ENGINEERING DATA ANALYSES, VERIFICATION, CALIBRATION, QUALIFICATION, AND DELIVERY OF THE OLI-2. THE CONTRACTOR SHALL ALSO PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY FOR SUPPORT TO OBSERVATORY I&T, SUPPORT TO MISSION LEVEL ACTIVITIES SUCH AS OBSERVATORY ENVIRONMENTAL TEST, LAUNCH VEHICLE INTEGRATION AND ON-ORBIT COMMISSIONING, AND SPECIAL STUDIES OF THE OLI-2. THE CONTRACTOR SHALL DELIVER TO THE GOVERNMENT AN OLI-2 THAT IS FULLY TESTED, CALIBRATED, AND HAS DEMONSTRATED COMPLIANT AND RELIABLE OPERATION IN ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.
LARC0199908DNAS199135BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$81.58M
2000-02-152015-07-10541710PICASSO-CENA INSTRUMENTS, PAYLOAD AND GROUND SYSTEMS
GSFC0199712DNAS597251BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$73.94M
1999-10-152015-12-31541710RAPID SPACECRAFT ACQUISITION MASTER CONTRACT (EXTEND POP PER DO #1003)
NNG13FB20CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$66.29M
2013-09-042023-06-30541330IGF::OT::IGF THE AFT OPTICS SYSTEM(AOS) SOURCE PLATE ASSEMBLY (ASPA); TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING; AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR S SHALL PROVIDE THE SYSTEMS ENGINEERING; EXPERT PERSONNEL; TRAVEL; REPORTS AND DOCUMENTATION; SOFTWARE OR SOFTWARE CHANGES; GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED.
GSFC0200008DNAS500190BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$65.45M
2000-08-152009-11-30541330PORTIONS OF THE WIDE FIELD CAMERA 3 (WFC3)
NNM12AA79CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$57.88M
2012-09-282021-01-31336414IGF::CT::IGF GREEN PROPELLANT INFUSION MISSION THE GREEN PROPELLANT INFUSION MISSION WILL BRIDGE THE GAP BETWEEN TECHNOLOGY DEVELOPMENT AND TECHNOLOGY INFUSION FOR GREEN PRO-PULSION TECHNOLOGIES. GPIM WILL BRING GREEN PROPULSION TECHNOLOGY FROM A CURRENT TRL 5 STATE TO A TRL 9 STATE. THE TECHNOLOGY DEMONSTRATION MISSION (TDM) IS BROKEN INTO THREE PHASES: BASE PERIOD, OPTION 1 AND OPTION 2. IN THE BASE PERIOD, BOTH A 1N AND A 22N THRUSTER WILL BE MATURED TO FLIGHT READY STATUS. THE THRUSTERS, DESIGNED FOR USE WITH AF-M315E FUEL, WILL BE GROUND TESTED TO SHOW THEY MEET THE FUNCTIONAL AND ENVIRONMENTAL REQUIREMENTS NEEDED FOR A SMALL SPACECRAFT PROPULSION SYSTEM. OPTION I INCLUDES SPACECRAFT BUS ASSEMBLY, INTEGRATION, TEST AND ASSEMBLY INTEGRATION AND TEST OF THE PROPULSION PAYLOAD FLIGHT SYSTEM. OPTION II INCLUDES SYSTEM LEVEL INTEGRATION AND TEST OF THE FULL SPACE VEHICLE, LAUNCH PREPARATION AND OPERATIONS AND FLIGHT DEMONSTRATION OF THE PROPULSION PAYLOAD.
80GSFC24CA035BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$50M
2024-05-232049-11-01336414GEOXO OCEAN COLOR INSTRUMENT IMPLEMENTATION CONTRACT
GSFC0199901DNAS599089BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$46.29M
1999-10-152009-11-30334516MANUFACTURE, TEST & INTEGRATE COS SCIENCE INSTRUMENT
0002BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$45.86M
2009-03-252016-04-01541710SPACE VEHICLE AND ALL ASSOCIATED WORK
FA865022C6441BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$43.88M
2022-08-042027-05-04541715RESEARCH FOR ENHANCING AIRMAN & COGNITIVE HEALTH (REACH)
FA945119C0001BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$35.44M
2018-10-242026-10-24541715IGF::OT:: IGF SOLID STATE LASER EFFECTS AND MODELING (SSLEM)
NNA09DA82CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$35.36M
2009-05-122019-09-30541712KEPLER OPERATIONS ON-ORBIT (PHASE E)
GSFC0199804DNAS598040BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$34.23M
1999-10-012010-01-31541330HUBBLE SPACE TELESCOPE (HST) INSTRUMENT SERVICING (HIS) CONTRACT THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, AND FACILITIES, EXCEPT AS OTHERWISE PROVIDED IN THE CONTRACT, NECESSARY TO MAXIMIZE LONG-TERM HST SCIENCE RETURN THROUGH RE-USE OF SPARE FLIGHT AD NON-FLIGHT HARDWARE AND SOFTWARE.
N0002414C5412BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$32.01M
2014-04-302017-09-29334511SLREOSS DIRECTOR MOUNT (DM) PROD CONFIG