FedTALLY

Awards for “THE AEROSPACE CORPORATION

25 awards on this page · sorted by amount · page 9

Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
1332KP26F0058THE AEROSPACE CORPORATIONDepartment of Commerce$1.25M
2026-08-012027-03-31541715SSES TO OFFICE OF COMMON SERVICES (OCS) TO 14
DJF171200P0000925THE AEROSPACE CORPORATIONDepartment of Justice$1.24M
2016-11-142019-05-31541611IGF::OT::IGF
NNL16AA49TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.23M
2015-12-102017-12-31541330IGF::OT::IGF " MAINTAINING MISSION OPERATIONS COST ESTIMATION TOOL (MOCET), HOW TO MEASURE LEVEL OF HERITAGE IN COMPLEX SPACE SYSTEMS, AND APPROACH TO VALIDATING PROPOSED MASS AND POWER MARGIN " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE TRAINING TO HQ AND ADDITIONAL AREAS OF THE NASA SCIENCE MISSION DIRECTORATE (SMD) FOR TECHNICAL, MANAGEMENT AND COST REVIEW OF SMD ANNOUNCEMENT OF OPPORTUNITY (AO) PROPOSALS, ALONG WITH PROVIDING 1 YEAR OF TECHNICAL SUPPORT. THE EFFORT WILL ALSO CHECK COST ESTIMATE RELATIONSHIPS (CERS) FOR CONSISTENCY ON ADDITIONAL MISSIONS. FINALLY, THIS TASK WILL ALSO (I) CREATE A PROCESS OF ASSESSING RISK OF PROPOSED HERITAGE ITEMS IN PRE-PHASE A AND PHASE-A, (II) CREATE A PROCESS TO VALIDATE PROPOSED MASS AND POWER, CONTINGENCY, AND MARGIN IN PRE-PHASE A AND PHASE-A, AND (III) DEVELOP A CONCEPT FOR ESTIMATING NASA STANDARD WBS 4, 7, AND 9 COSTS FOR THE PRE-PHASE E TIME PERIOD.
NNL11AD27TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.22M
2011-09-302012-11-30541330THIS STUDY WILL ASSESS THE VARIOUS PUBLIC AND PROPRIETARY COST MODELS AVAILABLE TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) TECHNICAL, MANAGEMENT AND COST (TMC) REVIEW OF SMD ANNOUNCEMENT OF OPPORTUNITY (AO) PROPOSALS TO DETERMINE WHICH COST TOOLS ARE MOST APPROPRIATE AND HAVE THE SMALLEST ERROR BANDS FOR DIFFERENT TYPES OF SMD TMC PANELS. THIS STUDY MUST ACCOUNT FOR THE LIMITED COST DATA AVAILABLE IN NASA PROPOSALS FOR STEP ONE AND STEP TWO AND BASED ON ANALYSIS OR VERIFICATION DETERMINE THE BEST FOUR COST MODELS FOR EARTH SCIENCE MISSIONS, EXPLORER PROGRAM, PLANETARY MISSIONS, INSTRUMENT PROPOSALS, AND OTHER CATEGORIES OF SMD PROPOSALS. THE UNCERTAINTY BAND FOR EACH RECOMMENDED COST TOOL MUST BE DETERMINED. ANY DIFFERENCES BETWEEN THE PUBLIC AND PROPRIETARY VERSION OF THE TOOL MUST BE QUANTIFIED. THIS STUDY MUST RECOMMEND COST SAVINGS APPROACHES FOR COST ANALYSIS ON STEP ONE AND TWO SMD AO PROPOSALS. IN ADDITION, THE STUDY WILL ASSESS HOW THE COST MODELS ARE USED IN THE TMC COST RISK ASSESSMENT PROCESS AND HOW THE INFORMATION IS BEST SUMMARIZED AND USED IN THE SELECTION PROCESS. RECOMMEND THE OPTIMUM USE OF THESE COST MODEL TOOLS TO DIFFERENTIATE BETWEEN PROPOSALS ON THE BASIS OF COST RISK.
1332KP22FNEEB0023THE AEROSPACE CORPORATIONDepartment of Commerce$1.21M
2022-06-302023-03-31541712AERONAUTICAL ENGINEERING
NNM16AA20TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.2M
2016-10-012018-11-30541690IGF::OT::IGF THE AEROSPACE CORPORATION SHALL SUPPORT THE SPACE LAUNCH SYSTEM PROGRAM (SLSP) AS DEFINED IN THE STATEMENT OF WORK. AEROSPACE SHALL PROVIDE AN OBJECTIVE, NON-ADVOCATE ASSESSMENT OF THE INFORMATION REVIEWED IN SUPPORT OF THIS TASK ORDER. AEROSPACE SHALL PROVIDE TECHNICAL ANALYSIS, CONSULTATION AND EVALUATION IN SUPPORT OF THE SLSP.
DOCT0016THE AEROSPACE CORPORATIONDepartment of Commerce$1.2M
2015-04-012017-01-31541712IGF::OT::IGF ADVISORY SERVICES
DOCT0013THE AEROSPACE CORPORATIONDepartment of Commerce$1.18M
2015-02-272016-04-29541712IGF::OT::IGF ADVISORY SERVICES
DJFX8N802898THE AEROSPACE CORPORATIONDepartment of Justice$1.17M
2008-01-012008-12-31541711SENTINEL PMO SUPPORT
80GRC022F0020THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.16M
2022-01-032024-01-31541715RESEARCH SUPPORT FOR THE COGNITIVE COMMUNICATIONS PROJECT AT THE NASA GLENN RESEARCH CENTER
19AQMM21C0023THE AEROSPACE CORPORATIONDepartment of State$1.16M
2021-07-272022-07-31541715SUPPORT- PROFESSIONAL: PROGRAM MANAGEMENT/SUPPORT
DOCT0019THE AEROSPACE CORPORATIONDepartment of Commerce$1.15M
2015-06-222016-01-21541712IGF::OT::IGF ADVISORY SERVICES
NNG17VN82TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.13M
2017-04-202019-09-30541712IGF::OT::IGF LANDSAT 9 OBSERVATORY MANAGEMENT SUPPORT PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED THE LANDSAT 9 L9 MISSION IS THE SUCCESSOR MISSION TO LANDSAT DATA CONTINUITY MISSION LDCM RENAMED LANDSAT 8 AFTER COMMISSIONING IN MAY 2013. LANDSAT SATELLITES HAVE CONTINUOUSLY ACQUIRED MULTISPECTRAL IMAGES OF THE GLOBAL LAND SURFACE SINCE THE LAUNCH OF LANDSAT 1 IN 1972. THE LANDSAT DATA ARCHIVE CONSTITUTES THE LONGEST CONTINUOUS MODERATE-RESOLUTION RECORD OF THE GLOBAL LAND SURFACE AS VIEWED FROM SPACE. THE LANDSAT 9 MISSION OBJECTIVE IS TO EXTEND THE ABILITY TO DETECT AND QUANTITATIVELY CHARACTERIZE CHANGES ON THE GLOBAL LAND SURFACE AT A SCALE WHERE NATURAL AND HUMAN-INDUCED CAUSES OF CHANGE CAN BE DETECTED AND DIFFERENTIATED. ONCE OPERATIONAL, DATA ACQUISITION, REPORTING, OPERATIONS, AND ARCHIVAL WILL BE ACCOMPLISHED AT THE U.S. GEOLOGICAL SURVEY (USGS) EARTH RESOURCES OBSERVATION SYSTEMS EROS FACILITY IN SOUTH DAKOTA WHERE THE CURRENT DATA IS MANAGED. THE L9 OBSERVATORY INSTRUMENT SUITE CONSISTS OF TWO MATURE INSTRUMENTS, WHICH ARE NEAR-COPIES OF THE INSTRUMENTS FLOWN ON LANDSAT 8. THEY ARE THE OPERATIONAL LAND IMAGER OLI AND THE THERMAL INFRARED SENSOR TIRS. THESE INSTRUMENTS WILL BE DESIGNATED OLI 2 AND TIRS 2 FOR LANDSAT 9, AND THE TIRS 2 INSTRUMENT WILL BE UPGRADED TO RISK CLASS B TIRS IS CLASS C ON LANDSAT 8. THE OLI 2 WILL BE BUILT BY BALL AEROSPACE TECHNOLOGY CORPORATION BATC OF BOULDER, CO. THE TIRS 2 IS BEING DEVELOPED AS A GSFC IN-HOUSE EFFORT. THE L9 SPACECRAFT BUS WILL BE BUILT BY ORBITAL ATK IN GILBERT, AZ. L9 INSTRUMENT DEVELOPMENT ACTIVITIES ARE WELL UNDERWAY, WITH BOTH INSTRUMENTS PAST CDR. THE L9 SPACECRAFT BUS IS BEING BUILT BY ORBITAL ATK IN GILBERT, AZ, UNDER A RAPID SPACECRAFT DEVELOPMENT OFFICE-III DELIVERY ORDER AWARDED IN OCTOBER 2016. ORBITAL ATK IS ALSO RESPONSIBLE FOR INSTRUMENT INTEGRATION, OBSERVATORY-LEVEL TESTING, LAUNCH SITE SUPPORT, AND OPERATIONS SUPPORT. THE TARGETED LANDSAT 9 LAUNCH READINESS DATE (LRD) IS CURRENTLY DECEMBER 2020 THE PURPOSE OF THIS TASK IT TO SUPPORT MANAGING THE DEVELOPMENT OF THE LANDSAT 9 SPACECRAFT AND OBSERVATORY. 3. DESCRIPTION OF WORK TO BE PERFORMED: 3.1. THE CONTRACTOR SHALL PROVIDE SYSTEM ENGINEERING AND TECHNICAL MANAGEMENT SUPPORT TO OBSERVATORY MANAGEMENT ACTIVITIES. THIS INCLUDES: INTEGRATED BASELINE ESTABLISHMENT AND MAINTENANCE, STATUS ASSESSMENT AND REPORTING OF COST, SCHEDULE AND TECHNICAL PERFORMANCE IDENTIFICATION, ASSESSMENT, AND MANAGEMENT OF ISSUES AND RISKS, AND ESTIMATION OF PROJECT COST/SCHEDULE IMPACTS PROVIDING PROJECT CONTROL SUPPORT, INCLUDING BUDGET AND SCHEDULE DEVELOPMENT, EXECUTION AND TRACKING, AND PROJECT MANAGEMENT PREPARATIONS FOR INTERNAL AND EXTERNAL REPORTING, REVIEWS, AND MILESTONE ACTIVITIES PROVIDING TECHNICAL AND PROGRAMMATIC OVERSIGHT/INSIGHT INTO SPACECRAFT/OBSERVATORY DEVELOPMENT CONTRACTOR TECHNICAL PROGRESS AND STATUS, SCHEDULE, AND RISKS ASSESSING PERFORMANCE OF THE SPACECRAFT/OBSERVATORY DEVELOPMENT CONTRACTOR INCLUDING ASSESSMENT OF PERFORMANCE AGAINST PAYMENT MILESTONE CRITERIA SUPPORTING EVALUATION OF CHANGE PROPOSAL MATERIALS RELATED TO EXISTING PROCUREMENTS SUPPORTING REVIEW OF SPACECRAFT/OBSERVATORY CONTRACTOR DELIVERABLE DOCUMENTS AND MATERIALS PLANNING AND PREPARATIONS FOR PROJECT AND OBSERVATORY LIFE CYCLE MILESTONE REVIEWS AND KEY DECISION MEETINGS PROVIDING SPACECRAFT/OBSERVATORY TECHNICAL AND SYSTEM ENGINEERING SUPPORT INCLUDING MISSION CONCEPT DEVELOPMENT, REQUIREMENTS DEVELOPMENT AND MANAGEMENT, DESIGN SOLUTION EVALUATION AND TRADES ANALYSES, INTERFACE MANAGEMENT, SPACECRAFT AND OBSERVATORY INTEGRATION AND TESTING, LAUNCH VEHICLE INTEGRATION, VERIFICATION AND VALIDATION, RISK MANAGEMENT, TECHNICAL DATA AND CONFIGURATION MANAGEMENT, TECHNICAL REVIEWS, REQUIREMENTS COMPLIANCE, SOFTWARE ENGINEERING MANAGEMENT, OPERATIONS READINESS/TESTING, MISSION ASSURANCE, PRE- AND POST-LAUNCH CALIBRATION, AND TECHNICAL OVERSIGHT/INSIGHT ASSISTING THE L9 OBSERVATORY MANAGER
DOCT0014THE AEROSPACE CORPORATIONDepartment of Commerce$1.11M
2018-01-252019-04-30541712IGF::OT::IGF FFRDC SUPPORT. TASK ORDER AWARD.
80MSFC24F0106THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.11M
2024-07-262026-09-30541715NEW TASK ORDER FOR SUPPORT TO EV70 SYSTEMS ENGINEERING AND INTEGRATION DIVISION MOON TO MARS (M2M) ANALYSIS INTEGRATION
NNG17VN79TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.09M
2017-02-102019-09-30541712IGF::OT::IGF SEETS II CONTRACT #NNG11VH00B, TASK ORDER #NNG17VN79T ENTITLED: "JOINT POLAR SATELLITE SYSTEM (JPSS) COMMAND, COMMUNICATION, AND CONTROL SEGMENT (C3S) SYSTEM ENGINEERING."
80HQTR26F7024THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.08M
2026-01-012026-12-31541715ON-SITE PROGRAMMATIC AND TECHNICAL SUPPORT SERVICES FOR SPACE TECHNOLOGY MISSION DIRECTORATE (STMD) STRATEGIC PLANNING AND INTEGRATION (SPI)
DOCDG133E07CQ0005T0026THE AEROSPACE CORPORATIONDepartment of Commerce$1.08M
2012-05-242012-11-30927110PROFESSIONAL TECHNICAL SERVICES
NNH11CD74DTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.06M
2011-08-152014-09-30541712TO PROVIDE SYSTEMS ENGINEERING AND ANALYSIS SUPPORT TO THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) HEADQUARTERS THE CONTRACTOR SHALL PROVIDE THE RESOURCES, PERSONNEL, AND FACILITIES TO PERFORM THE WORK AND PROVIDE THE FOLLOWING SYSTEM ENGINEERING SERVICES, AND ANALYSIS SUPPORT IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) TO THE NASA HEADQUARTERS OFFICE OF THE CHIEF ENGINEER: THE AEROSPACE CORPORATION SHALL PROVIDE QUALIFIED TECHNICAL EXPERTISE TO THE OFFICE OF THE CHIEF ENGINEER (OCE) TO CONDUCT THE FOLLOWING ASSESSMENTS OF NASA PROGRAMS AND PROJECTS INCLUDING, BUT NOT LIMITED TO THE, HEAVY LIFT VEHICLE, SPACE SHUTTLE AND INTERNATIONAL SPACE STATION PROGRAMS AS WELL AS NASA MISSIONS UNDER ASSESSMENT: NUMBER (1); CONDUCT ANALYSES OF ALTERNATIVES AND COST ESTIMATES; NUMBER (2) - EVALUATE THE SYSTEM ARCHITECTURE AND MISSION DEFINITION, AND THE SYSTEM ENGINEERING AND INTEGRATION PLANS; AND NUMBER (3) - CONTRIBUTE TO THE CONFIGURATION AND RISK MANAGEMENT OF THE MISSIONS. THE AEROSPACE CORPORATION SHALL PRESENT THE RESULTS OF ITS TASKS TO THE NASA CHIEF ENGINEER TO ALLOW HIM TO DETERMINE WHETHER THE PROGRAMS ARE ON A TRACK TOWARD SUCCESSFULLY MEETING THE AGENCY LEVEL 1 REQUIREMENTS. DEPENDING ON THE INDIVIDUAL ANALYSIS, THE NASA OFFICE OF CHIEF ENGINEER MAY REQUEST ADDITIONAL ANALYSIS OR RECOMMENDATIONS FROM THE AEROSPACE CORPORATION TO BRING THE PROGRAM INTO COMPLIANCE WITH THE AGENCY REQUIREMENTS. THE SCHEDULING OF TASKS AS LISTED ABOVE WILL BE COMPLETED DURING THE REMAINDER OF FISCAL YEAR (FY11) 2011; AND FISCAL YEAR (FY12) 2012. ALL DELIVERABLES WILL BE MADE NO LATER THAN ONE YEAR AFTER THE TASK IS IN PLACE.
80ARC023F0051THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.06M
2023-10-012024-09-30541715THE CONTRACTOR SHALL PROVIDE ENGINEERING/SCIENTIFIC SERVICES ON BEHALF OF THE USSF SSC/DCI FOR SPECTRUM MANAGEMENT IN ACCORDANCE WITH THE AUTHORIZING INTERAGENCY AGREEMENT.
1332KP21FNEEA0027THE AEROSPACE CORPORATIONDepartment of Commerce$1.05M
2021-05-262023-01-31541712AERONAUTICAL ENGINEERING
NNG12VN16TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.03M
2012-02-292015-06-30541712NASA LANDSAT DATA CONTINUITY MISSION GROUND SYSTEM PROJECT AND SYSTEMS MANAGEMENT SUPPORT: THIS TASK PROVIDES GROUND SYSTEM PROJECT LEADERSHIP AND SYSTEMS ENGINEERING SUPPORT TO THE LANDSAT DATA CONTINUITY MISSION (LDCM). THE LDCM IS A REMOTE SENSING SATELLITE MISSION PROVIDING COVERAGE OF THE EARTH'S LAND SURFACES. THIS MISSION CONTINUES THE 30+ YEARS OF GLOBAL DATA COLLECTION AND DISTRIBUTION PROVIDED BY THE LANDSAT SERIES OF SATELLITES. THE LDCM IS A JOINT MISSION BETWEEN THE NASA AND THE USGS. NASA IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACE SEGMENT, LAUNCH SEGMENT, AND THE MISSION OPERATIONS ELEMENT (MOE) OF THE GROUND SYSTEM; USGS IS RESPONSIBLE FOR THE DEVELOPMENT OF THE GROUND SYSTEM, EXCLUDING PROCUREMENT OF THE MOE. NASA SERVES AS THE SYSTEM INTEGRATOR FOR THE MISSION, LEADS THE MISSION AND GROUND SYSTEMS ENGINEERING EFFORTS, AND IS RESPONSIBLE FOR OVERALL MISSION SUCCESS THROUGH THE COMPLETION OF ON-ORBIT COMMISSIONING AND TRANSITION OF MISSION OPERATIONS TO USGS. THIS TASK DESCRIPTION DEFINES THE WORK TO BE PERFORMED BY THE CONTRACTOR TO EFFECTIVELY CARRY OUT GROUND SYSTEM PROJECT, SYSTEMS ENGINEERING, AND OPERATIONS READINESS SUPPORT ACTIVITIES THROUGH THE LAUNCH OF THE LDCM OBSERVATORY. THE CONTRACTOR SHALL SERVE AS A TRUSTED AGENT OF THE NASA TO PROVIDE PROJECT MANAGEMENT AND LEADERSHIP SUPPORT TO THE NASA LDCM GROUND SYSTEM AND OPERATIONS TEAM AND THE LDCM PROJECT. THE CONTRACTOR SHALL SERVE AS A TRUSTED AGENT OF THE NASA TO PROVIDE SYSTEMS ENGINEERING SUPPORT TO THE NASA LDCM GROUND SYSTEM AND OPERATIONS ACTIVITIES WITHIN THE LDCM PROJECT. THE CONTRACTOR SHALL ALSO PROVIDE THE FOLLOWING SUPPORT: REVIEW AND PROVIDE INPUT TO LDCM MISSION AND GROUND SYSTEM AND OPERATIONS DOCUMENTATION INCLUDING, BUT NOT LIMITED TO, AGREEMENTS, PLANS, OPERATIONS CONCEPTS, REQUIREMENTS DOCUMENTS, AND, PROCEDURES; AND ASSIST IN TRACKING THE STATUS AND REVIEW OF DOCUMENTS AND DELIVERABLES REVIEW AND PROVIDE INPUT TO PROGRAMMATIC AND TECHNICAL PRESENTATIONS SUPPORT MISSION AND GROUND SYSTEM/OPS CONFIGURATION MANAGEMENT AND RISK MANAGEMENT PROCESSES ASSIST IN DEFINING EXPECTATIONS AND IN PREPARATIONS FOR/PARTICIPATION IN PRE-LAUNCH OPERATIONS READINESS REVIEWS ATTEND AND PARTICIPATE IN PRE- AND POST-TEST REVIEWS FOR THE GROUND SYSTEM ELEMENTS, AND FOR GROUND SYSTEM, OPERATIONS, AND MISSION-LEVEL TESTS PROVIDE SUBJECT MATTER EXPERT SUPPORT ON AN AS-NEEDED BASIS FOR TO SUPPORT LDCM GROUND AND OPERATIONS ACTIVITIES (INDEPENDENT REVIEWS, ANALYSES, ETC) AS REQUESTED BY THE LDCM GROUND SYSTEM AND OPERATIONS MANAGER.
NNG12VN32TTHE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.02M
2012-06-252019-09-30541712IGF::OT::IGF OTHER FUNCTIONS. MEOSAR/GPS I&T AND O&M SUPPORT 1. PURPOSE, OBJECTIVE, AND BACKGROUND OF WORK TO BE PERFORMED: THE SAR/GPS PAYLOAD PROVIDES A NEAR-REAL-TIME "BENT-PIPE" REPEATER FUNCTION FOR THE DETECTION AND LOCATION OF COMPLIANT 406 MHZ DISTRESS BEACONS. SAR/GPS WILL BE ONE COMPONENT OF THE INTERNATIONAL COSPAS-SARSAT SEARCH AND RESCUE (SAR) SYSTEM AND WILL BE A HOSTED PAYLOAD ON ALL GPS IIIB AND GPS IIIC SVS. EACH SAR-EQUIPPED GPS IIIB AND GPS IIIC SATELLITE WILL RECEIVE ALERT SIGNALS FROM AIRCRAFT-BASED EMERGENCY LOCATOR TRANSMITTERS (ELTS), MARITIME EMERGENCY POSITION-INDICATING RADIO BEACONS (EPIRBS), OR TERRESTRIAL PERSONAL LOCATOR BEACONS (PLBS), AND WILL RELAY THEM TO SPECIALIZED GROUND STATIONS FOR LOCATION DETERMINATION AND DISSEMINATION TO RESCUE PERSONNEL. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) IS CONDUCTING AN INDEPENDENT ASSESSMENT OF THE SAR/GPS SYSTEM TO EVALUATE COMPLIANCE WITH MISSION ASSURANCE REQUIREMENTS. 2. DESCRIPTION OF WORK TO BE PERFORMED: THE CONTRACTOR SHALL SUPPORT THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) SAR/GPS INDEPENDENT ASSESSMENT AS FOLLOWS: . PROVIDE MANAGEMENT AND COORDINATION SUPPORT FOR THE SAR/GPS INDEPENDENT ASSESSMENT TEAM. O ACT AS INTERFACE TO THE AEROSPACE CORPORATION GPS TEAM. O PROVIDE GUIDANCE ON TEST AND EVALUATION CRITERIA. . PROVIDE SYSTEMS ENGINEERING SUPPORT FOR THE SAR/GPS INDEPENDENT ASSESSMENT TEAM. TRAVEL TO UNITED STATES AND CANADIAN CONTRACTOR LOCATIONS IN SUPPORT OF THIS WORK SHALL BE REQUIRED. THE CONTRACTOR SHALL PROVIDE ON AND OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER (CO). THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS.
80GRC021F0022THE AEROSPACE CORPORATIONNational Aeronautics and Space Administration$1.02M
2020-12-042025-06-13541715PROJECT MANAGEMENT AND RESEARCH SUPPORT FOR THE SOLAR ELECTRIC PROPULSION PROJECT INTEGRATION AT THE NASA GLENN RESEARCH CENTER
DJFA2C1217400THE AEROSPACE CORPORATIONDepartment of Justice$1M
2012-07-272012-07-29541712ITED POST-FOC SENTINEL SUPPORT