Awards for “GRANITE CONSTRUCTION COMPANY”
25 awards on this page · sorted by amount · page 9
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 0025 | GRANITE CONSTRUCTION COMPANY GUAM | Department of Defense | $98.67K | 2017-05-26 | 2017-11-25 | 237310 | IGF::OT::IGF REPAIR ACTIVE LOADING ZONE AND DRIVEWAY B462 |
| AG9A63P090063 | GRANITE CONSTRUCTION COMPANY | Department of Agriculture | $96.22K | 2009-09-08 | 2009-09-30 | 423320 | AGGREGATE AND COLD MIX ASPHALT |
| 0074 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $95.06K | 2013-08-08 | 2013-12-31 | 237310 | STATEMENT OF WORK PLANT 42 SPALL REPAIR PALMDALE, CA CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM JET FUEL/BLAST RESISTANT JOINT REPAIR, CONTRACT LINE ITEM 3026AB, AND PARTIAL DEPTH SPALL/PATCH REPAIR, CONTRACT LINE ITEM 3027AA, ON AIRFIELD PAVEMENTS, TO INCLUDE RUNWAYS, TAXIWAYS, RAMPS, APRONS AND PADS. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH UFC 3-270-03 USING MATERIALS LISTED AS APPROVED BY THE GOVERNMENT. EXPECTED TOTAL JET FUEL/BLAST RESISTANT JOINT REPAIR IS 266 LF AND EXPECTED PARTIAL DEPTH SPALL/PATCH REPAIR IS 445 SF. REPAIRS WILL BE IN VARIOUS LOCATIONS THROUGHOUT THE AIRFIELD, MARKED IN ORANGE PAINT BY AIR FORCE PLANT 42/CE AND AIRFIELD MANAGEMENT. OPTION YEAR 3 - LINE ITEMS 3001AA - 3031AJ GRANITE CONSTRUCTION CO. .00 THE PERFORMANCE PERIOD IS FORTY-FIVE (45) CALENDAR DAYS FROM THE TIME THE CONTRACTOR RECEIVES THE FORMAL NOTICE TO PROCEED. DAVIS BACON IS CA130033 FOR CALIFORNIA LOS ANGELES COUNTY EFFECTIVE UPON THE DATE OF AWARD. LIQUIDATED DAMAGES ARE $1,350.00 PER DAY. |
| 70B01C23F00000722 | GRANITE CONSTRUCTION COMPANY | Department of Homeland Security | $95.06K | 2023-07-17 | 2023-12-01 | 236220 | MESH DESIGN REPORT |
| 0065 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $92.48K | 2012-09-28 | 2013-12-31 | 237310 | TASK ORDER SCOPE OF WORK AABP CAEA-1288 PROJECT NAME&LOCATION: REPAIR GLIDESLOPE ROAD WITH PARKING AREAS AND STORAGE YARD, EDWARDS AFB, CA NEW TASK ORDER CONTRACT NO: W912PL-09-D-0032 CONTRACTOR: GRANITE CONSTRUCTION CO. 1. SCOPE OF WORK: REPAIR GLIDESLOPE ROAD WITH PARKING AREAS AND STORAGE YARD, EDWARDS AFB, CA PULVERIZE EXISTING PAVEMENT AND REBUILD THE AM STORAGE YARD ROAD 12 FEET WIDE BY 210 FEET LONG WITH 4 OF ASPHALT WEST FROM TAXIWAY LIMA AND PULVERIZE EXISTING PAVEMENT AND REBUILD THE STORAGE PARKING PAD 100 FEET BY 120 FEET WITH 3 OF ASPHALT. PULVERIZED MATERIALS TO BE USED FOR 6 INCH BASE PREPARATION. AFTER COMPLETION OF ALL ASPHALT WORK ERECT AN 8 FOOT FENCE WITH TWO ROLLING VEHICLE GATES AND A PEDESTRIAN GATE. FENCED AREA WILL BE 406 LIN. FEET. EAST AND WEST PERIMETER FENCING WILL INCLUDE 15 FOOT ROLLING GATE ON BOTH THE EAST AND WEST. THE NORTH AND SOUTH SIDE PERIMETER FENCING WILL BE100 FEET WITH A 4 FOOT WALK THROUGH GATE ON THE SOUTH SIDE. COMPLETE 6 INCH SUB-GRADE PREPARATION, LAY 6 INCH BASE AND PAVE 3 INCH 12 FOOT BY 315 FOOT GLIDESLOPE ROADWAY SOUTH FROM THE ALZ AND END AT GLIDE SLOPE BUILDING WITH A 35 X 25 FOOT PARKING AREA WITH 3 OF ASPHALT. NO FLIGHTLINE TRAINING REQUIRED FOR THIS PROJECT PER AIRFIELD MANAGEMENT, NO FLIGHLINE ESCORTING. 2. TASK ORDER PRICE: - $92,481.10 3. PERFORMANCE TIME: THE CONTRACTOR SHALL PERFORM ALL WORK INCLUDED IN THIS TASK ORDER WITHIN 60 CALENDAR DAYS OF RECEIPT OF NOTICE TO PROCEED. 4. WAGE DETERMINATION: 2010031 KERN CO, DATED 08.03.2012, CA31 WILL BE IN EFFECT. 5. LIQUIDATED DAMAGES: $1,060.00/DAY 6. ADMINISTERED BY: EDWARDS RESIDENT OFFICE, EDWARDS, AFB, CA |
| 0008 | GRANITE CONSTRUCTION COMPANY GUAM | Department of Defense | $91.09K | 2015-09-25 | 2016-02-14 | 237310 | IGF::OT::IGF N40192-14-D-2830-0008, AJJY 15-6017 CONSTRUCT ACCESS POINTS, ATHLETIC FIELD, B-1604, ANDERSEN AIR FORCE BASE, GUAM |
| N4019218F4413 | GRANITE CONSTRUCTION COMPANY GUAM | Department of Defense | $90.41K | 2018-09-29 | 2019-01-27 | 237310 | IGF::OT::IGF WON1578271 -- PAINT FFSC PARKING AREAS |
| W9123817F0026 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $87.38K | 2017-03-03 | 2017-07-25 | 237990 | IGF::CT::IGF R1 SITE 108 ROAD RESTORATION |
| FA500018P0124 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $83.95K | 2018-07-16 | 2018-07-18 | 324121 | HOT MIX ASPHALT 3/4" MOA CLASS E |
| 0060 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $79.77K | 2012-09-27 | 2013-12-31 | 237310 | THIS SCOPE OF WORK IS FOR THE HOLD SHORT LINES, EDWARDS AFB, CA THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, EQUIPMENT, MATERIALS, SUPPLIES, TRANSPORTATION, SUPERVISION, AND LABOR NECESSARY TO REPAIR AND REPLACE THE HOLD SHORT LINES, EDWARDS AFB, CA. A. REMOVE EXISTING MAIN BASE RUNWAY NON-LEAD BASED PAINTED HOLD-SHORT LINES AND REPLACE WITH ENHANCED, 12 WIDE HOLD-SHORT LINES WITH AIRFIELD-GRADE RETRO-REFLECTIVE BEADS, TEN TOTAL. A. THE EXISTING HOLD-SHORT LINE SOUTH OF THE MAIN RUNWAY IS AT AN OBLIQUE TO THE RUNWAY. AFTER REMOVAL OF THIS LINE REPLACE IT WITH ONE COMMENCING FROM ITS CURRENT WEST-MOST LOCATION BUT PARALLEL TO THE MAIN RUNWAY. THIS WILL MAKE THE LINE LONGER THAN CURRENTLY. B. INSTALL 12 THERMOPLASTIC STOP LINES AND STOP TEXT ACROSS VEHICLE LANES. APPLY THIS THERMOPLASTIC MATERIAL ONLY WITHIN THE ROADWAY SURFACES. C. PROVIDE TAXIWAY EDGE LINE MARKINGS AT HAMMERHEADS 04 AND 22. PERFORMANCE PERIOD IS THIRTY (30) CALENDAR DAYS FROM THE TIME THE CONTRACTOR RECEIVES THE FORMAL NOTICE TO PROCEED FROM THE CONTRACTING OFFICER S REPRESENTATIVE. DAVIS-BACON WAGE RATE DECISION CA120031, CA31, EFFECTIVE UPON EXERCISE OF OPTION YEAR 3. FOR KERN COUNTY CALIFORNIA. LIQUIDATED DAMAGES ARE CALCULATED AT $1,060.00 PER DAY. |
| AG9360C080014 | GRANITE CONSTRUCTION COMPANY | Department of Agriculture | $78.71K | 2008-09-23 | 2008-11-15 | 237310 | LOVELL CANYON ROAD REPAIRS |
| FA500018F0057 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $76.73K | 2018-08-17 | 2018-09-21 | 324121 | ASPHALT - GIBSON AVE PROJECT |
| 0011 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $75.1K | 2009-09-30 | 2009-10-13 | 237310 | TASK ORDER 0011 EA STRIPING RAMP I |
| 0009 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $74.4K | 2009-09-28 | 2013-11-30 | 237310 | MAINTAIN AIRFIELD STRIPING, MAIN BASE |
| 0004 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $73.94K | 2014-04-21 | 2014-07-09 | 324121 | MUNI E MIX/STATE TYPE II A |
| 0035 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $72.88K | 2011-05-23 | 2011-09-30 | 237310 | RUBBER REMOVAL, PLANT 42, PALMDALE, CA |
| 0006 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $72.48K | 2015-05-11 | 2015-07-09 | 324121 | HOT MIX ASPHALT, AVIATION STATE TYPE IIA |
| W912PL08P0010 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $70.8K | 2008-01-03 | 2008-06-03 | 237990 | SANTA PAULA DEBRIS REMOVAL |
| 0029 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $69.52K | 2010-09-30 | 2010-11-30 | 237310 | SLURRY SEAL B1020 AND B1030, EAFB, CA |
| 0019 | GRANITE CONSTRUCTION COMPANY GUAM | Department of Defense | $68.45K | 2016-08-10 | 2016-12-05 | 237310 | IGF::OT::IGF CONTRACT NO. N40192-14-D-2830-0019, AJJY 15-6013 CONSTRUCT ASPHALT PAVEMENT AREA BEHIND B25001, ANDERSEN AFB, GUAM |
| 0036 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $61.42K | 2011-08-05 | 2011-10-31 | 237310 | MAINTAIN SCHOOL STRIPING, EAFB, CA |
| 0006 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $60.37K | 2009-09-26 | 2009-11-30 | 237310 | REPAIR CURBS & DRIVEWAYS AT FITZGERALD AND BAILEY, EAFB, CA |
| 0008 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $59.08K | 2009-09-28 | 2013-11-30 | 237310 | REPAIR BIKE PATH, EAFB, CA |
| 0079 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $58.22K | 2013-09-16 | 2014-01-17 | 237310 | MAINTAIN PAINT PARKING&TAXI LINES |
| FA500018P0078 | GRANITE CONSTRUCTION COMPANY | Department of Defense | $56.25K | 2018-05-21 | 2018-05-29 | 324121 | ASPHALT MIX: 3/4" MOA CLASS E (WITH RAP) |