Award IDRecipientAwarding agencyAmountStartEndNAICSDescription
SPRAL117C0009BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$654.59K
2017-02-092017-12-063342208503946338!PWR AMP HPA LNA
SPE7M518C0045BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$643.6K
2018-08-312019-12-023342208505808076!ANTENNA
80LARC21F0023BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$637.68K
2020-11-232021-11-22541330TASK ORDER #1 CLOUD-AEROSOL LIDAR AND INFRARED PATHFINDER SATELLITE OBSERVATION (CALIPSO) SUSTAINING ENGINEERING 12-MONTH TASK ORDER
SPM7M514C0007BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$607.2K
2013-11-142015-02-073333164525973187!ANTENNA
NNA11AA09TBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$605.8K
2010-11-102017-11-09541712INNOVATION, ARCHITECTURE, AND STANDARDS TASK ORDER UNDER THE MSV MULTI-AWARD IDIQ. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER DIRECT COSTS, AND FEES, NECESSARY TO ACCOMPLISH THE REQUIREMENTS CONTAINED IN THE ATTACHED TASK ORDER.
NNC11CA29CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$600K
2011-08-152011-12-27541712MISSION CONCEPT STUDY CONTRACT WHICH SHALL ADDRESS MISSION JUSTIFICATION, IDENTIFICATION OF REQUIRED TECHNOLOGIES, TECHNOLOGY DEVELOPMENT PLANS, DEFINITION OF THE MISSION CONCEPT, AND FLIGHT DEMONSTRATIONS REQUIRED TO ACHIEVE CAPABILITIES TO SUPPORT FUTURE SPACE EXPLORATION MISSIONS. TO SUPPORT PROJECT FORMULATION, NASA REQUIRES A MISSION COST ESTIMATE, A SCHEDULE FOR SYSTEM DEVELOPMENT, AND DISCUSSION OF GOVERNMENT-INDUSTRY PARTNERSHIPS TO MAXIMIZE TECHNICAL OBJECTIVES OF THE MISSION WHILE REDUCING OVERALL MISSION COSTS. OFFERORS MAY PROPOSE TO CONDUCT A STUDY ON ONE OR MORE MISSION CONCEPTS, BUT MUST PROVIDE THE REQUIRED CONTENT FOR ALL PROPOSED CONCEPTS. WITHIN EACH MISSION CONCEPT, THERE ARE LIKELY TO BE OPTIONS THAT SIGNIFICANTLY INCREASE BENEFIT FOR A RELATIVELY MODEST INCREASE IN COST. NASA IS INTERESTED IN THESE OPTIONS. MISSION COSTS AT THE HIGHER END OF THE RANGE MAY BE CONSIDERED IF THE PROPOSED EFFORT PRESENTS A COMPELLING NEW TECHNOLOGICAL CAPABILITY THAT WARRANTS A HIGHER FUNDING LEVEL, WHICH MUST BE SUPPORTED WITH A COST/BENEFIT ANALYSIS. A PRELIMINARY MISSION CONCEPT STUDY, TO BE DEVELOPED AND MATURED THROUGH AWARD OF THIS STUDY CONTRACT.
140G0122C0004BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of the Interior$599.8K
2022-02-032027-02-02541990USGS LANDSAT 9 INSTRUMENT ENGINEERING SUPPORT SERVICES
SPE7M115C0007BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$574.62K
2014-11-212015-12-313333168501560092!ANTENNA
NNG14VE04DBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$560K
2013-11-152014-03-19336414JPSS-2 SPACECRAFT ACCOMMODATION STUDY
SPE7M517C0015BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$557.29K
2017-02-032018-03-053333168503797919!ANTENNA
80GSFC21C0077BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$550K
2021-04-272021-08-27336414NASA GODDARD SPACE FLIGHT CENTER GEOSPACE DYNAMICS CONSTELLATION SPACECRAFT STUDY.
0006BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$547.45K
2008-11-132010-04-30541330SAFIRE SUPPORT - OPTION YEAR 3/4
80LARC22F0010BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$545.55K
2021-11-232022-11-22541330PROVIDE SUSTAINING ENGINEERING SUPPORT NECESSARY TO SUPPORT THE CLOUD-AEROSOL LIDAR AND INFRARED PATHFINDER SATELLITE OBSERVATION (CALIPSO) MISSION 2021.
SPM7M912M2018BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$531.88K
2012-02-292012-12-253342204520557743!ANTENNA
NNG06HX06CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$517.06K
2006-03-212008-05-05541710THE CONTRACTOR SHALL CONDUCT THE STUDY ENTITLED: LIGHTWEIGHT, LOW-POWER, HIGH-SPEED DIGITAL SIGNAL DISTRIBUTION TECHNOLOGY FOR THINNED APERATURE RADIOMETER
80GSFC26C0023BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2026-06-012027-02-28541330SPACE WEATHER GEOSTATIONARY (SW GEO) PHOTOSPHERIC MAGNETOGRAPH IMAGER (PHOMI) PHASE A STUDY
NNG16VW00DBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2016-01-042016-03-18336414LANDSAT 9 SPACECRAFT ACCOMMODATION STUDY. THE SCOPE OF WORK INCLUDES DESIGN, BUILD AND TEST, PAYLOAD INTEGRATION AND TEST, LAUNCH VEHICLE INTEGRATION AND SUPPORT AND ON-ORBIT CHECKOUT AND ACCEPTANCE.
NNG16PJ21CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2016-03-112016-07-10541330IGF::OT::IGF WFIRST WIDE-FIELD INSTRUMENT (WFI) INDUSTRY CONCEPT STUDY. THIS STUDY ACTIVITY IS INTENDED TO DETERMINE FEASIBLE WFI IMPLEMENTATION APPROACHES FOR THE PRELIMINARY WFIRST SCIENCE REQUIREMENTS, ASSESS THE CRITICAL THERMAL, OPTICAL, MECHANICAL AND INTERFACES THAT DRIVE THE WFIRST WFI DESIGN, AND ADDRESS THE DEVELOPMENT AND VERIFICATION APPROACH OF THE WFI. THE STUDY WILL ALSO ASSESS THE CRITICAL COST, SCHEDULE, TECHNICAL PERFORMANCE AND RISK DRIVERS AND DEVELOP COST AND SCHEDULE ESTIMATES FOR THE DESIGN, BUILD AND TEST OF THE WFI.
NNG14HZ22PBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2014-08-252015-03-15541712IGF::OT::IGF SUSTAINABLE LAND IMAGING (SLI) - REDUCED INSTRUMENT ENVELOPE STUDY: THE CONTRACTOR SHALL PERFORM ONE OR MORE CONCEPTUAL DESIGNS OF IMAGER INSTRUMENTS TARGETING A REDUCED VOLUME, MASS, AND POWER ENVELOPE THAT CAN SATISFY LAND IMAGING PERFORMANCE REQUIREMENTS AND MEET NPR 8705.4 RISK CLASS B STANDARDS. THE CONTRACTOR SHALL ASSUME THE CONCEPT OF OPERATIONS FOR THE INSTRUMENT. THE CONTRACTOR SHALL PROVIDE IMAGING ALL LAND AND COASTAL AREA IN THE INSTRUMENTS FIELD OF VIEW, EVERY ORBIT. THE CONTRACTOR SHALL ASSUME AGILITY, MECHANICAL INTERFACE TO S/C, THERMAL INTERFACE TO S/C, AND ELECTRICAL INTERFACE TO SPACECRAFT (S/C). AS PART OF THIS DESIGN, THE CONTRACTOR SHALL PERFORM ANALYSIS AND PROVIDE STUDY PRODUCTS ADDRESSING AT A MINIMUM SLI PERFORMANCE REQUIREMENTS TO IDENTIFY THE DRIVERS FOR MASS, VOLUME, AND POWER, AND COST FOR FUTURE MID-TERM INSTRUMENT DESIGNS. THE CONTRACTOR SHALL PROVIDE A DETAILED ASSESSMENT OF OPTICAL DESIGN AND FOCAL PLANE PERFORMANCE RELATIVE TO SLI PERFORMANCE REQUIREMENTS. THE CONTRACTOR SHALL PERFORM ANALYSIS AND PROVIDE STUDY PRODUCTS ADDRESSING EMERGING TECHNOLOGIES AND TECHNIQUES TO FURTHER ENABLE IMPLEMENTATION EFFICIENCIES AND A SCHEDULE FOR POTENTIAL INFUSION INTO SLI. THE CONTRACTOR SHALL ACCOMMODATE ON-BOARD REFLECTIVE AND THERMAL BAND CALIBRATION SOURCES TO SATISFY PERFORMANCE REQUIREMENTS. THE CONTRACTOR SHALL DISCUSS CALIBRATION APPROACH AND DEVELOP A CALIBRATION ERROR BUDGET. THE CONTRACT SHALL ASSESS THERMAL CONTROL, INCLUDING TECHNIQUES AND TECHNOLOGIES FOR DETECTOR COOLING AND STABILIZATION, ACCOMMODATION OF POTENTIALLY LARGE RADIATOR AREAS ON A SMALLSAT PLATFORM, ASSESSMENT OF PASSIVE VS. ACTIVE COOLING ON A SMALLSAT PLATFORM. THE CONTRACTOR SHALL IDENTIFY SPACECRAFT INTERFACE ASSUMPTIONS, INCLUDING THOSE FOR ATTITUDE CONTROL AND LINE OF SIGHT STABILITY, AND RATIONALE FOR SATISFYING IMAGING REQUIREMENTS. THE CONTRACTOR SHALL DELIVER BRIEF MONTHLY UPDATED STATUS PACKAGES. THE CONTRACTOR SHALL HOST A KICKOFF MEETING. THE CONTRACTOR SHALL SUPPORT A PRELIMINARY RESULTS (MIDTERM) REVIEW. THE CONTRACTOR SHALL HOST A FINAL RESULTS REVIEW. SPECIFIC ACTIVITIES SHALL BE PRIMARILY PERFORMED AT THE CONTRACTOR S LOCATION.
NNG10HS07CBAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2010-03-052010-07-05541330DECADAL SURVEY MISSION IS FOR A STUDY TO DETERMINE THE FEASIBLITY OF A COMMON SPACECRAFT FOR MANY DIFFERENT MISSIONS.
80GSFC21CA013BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2021-07-012021-12-31541715LANDSAT NEXT INSTRUMENT STUDY
80GSFC21CA012BAE SYSTEMS SPACE & MISSION SYSTEMS INC.National Aeronautics and Space Administration$500K
2021-07-012021-12-31541715LANDSAT NEXT INSTRUMENT STUDY
W911SR25F0044BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$497.02K
2025-09-152026-07-31334220REDBRICK TRANSMIT (TX) ANTENNA SYSTEM
0016BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$494.08K
2003-06-062010-10-01541710200309!000482!5700!GS03 !DET 8, AFRL/PK (SUPPORTS DE) !F2960100D0010 !A!N! !N!0016 !20030606!20040906!926451519!926451519!006419147!N!BALL AEROSPACE & TECHNOLOGIES !1600 COMMERCE STREET !BOULDER !CO!80306!07850!013!08!BOULDER !BOULDER !COLORADO !+000000450000!N!N!000000000000!AC53!RDTE/WEAPONS-ADV TECH DEV !A2 !MISSILE AND SPACE SYSTEMS !3000!NOT DISCERNABLE OR CLASSIFIED !541710!E! !5!B!S! ! ! !99990909!B! ! !A! !A!N!U!1!002!E! !Z!Y!Z! ! !N!C!N! ! ! !Z!Z!A!A!000!A!B!N! ! ! ! ! ! !0001! !
0007BAE SYSTEMS SPACE & MISSION SYSTEMS INC.Department of Defense$486.47K
2003-05-152010-09-16541690200308!000392!5700!GU72 !ASC/RWKR !F3365700G4048 !A!N! !N!0007 !20030515!20040522!926451519!926451519!006419147!N!BALL AEROSPACE & TECHNOLOGIES !1600 COMMERCE STREET !BOULDER !CO!80306!07850!013!08!BOULDER !BOULDER !COLORADO !+000000493865!N!N!000000000000!B599!OTHER SPECIAL STUDIES & ANALYSES !C9E!ALL OTHER SUPPLIES AND EQUIPME!3000!NOT DISCERNABLE OR CLASSIFIED !541690!E! !4! ! ! ! ! !99990909!B! ! !N!Z!D!N!U!1!001!N!6A!Z!Y!Z! ! !N!C!N! ! ! !B!B!A!A!000!A!B!N! ! ! ! ! ! !0001! !