Awards for “THE AEROSPACE CORPORATION”
25 awards on this page · sorted by amount · page 16
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 80KSC023F0059 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $365.51K | 2023-10-01 | 2027-04-15 | 541715 | NASA SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES (NSEETS) TASK ORDER FOR COMMERCIAL CREW PROGRAM (CCP) SYSTEMS ENGINEERING AND INTEGRATION (SE&I) SUPPORT. |
| NNH12CF95D | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $364.05K | 2012-08-27 | 2013-01-31 | 541712 | IGF::OT::IGF OTHER FUNCTIONS. TECHNICAL AND ADVISORY SERVICES FOR THE SATELLITE LASER RANGING (SLR) MITIGATION STUDY PHASE I. THE AEROSPACE CORPORATION WILL PROVIDE AN INDEPENDENT, TOP LEVEL ASSESSMENT OF THE RISKS AND IMPACTS TO THE U.S. NUCLEAR DETONATION (NUDET DETECTION SYSTEM (USNDS)) THAT COULD RESULT FROM THE INTERNATIONAL LASER RANGING SERVICE (ILRS) LASER TRACKING OF THE GPS-III/9+SATELLITES. THE AEROSPACE EFFORT IS INTENDED TO COMPLEMENT AN ONGOING MITIGATION STUDY BY STAKEHOLDER AGENCIES AND OVERSEEN BY A SENIOR ADVISORY GROUP (SAG). ACCORDINGLY, THE PHASE I PRODUCTS OF THIS AEROSPACE STUDY IS INTENDED TO INFORM THE FORMULATION OF A SAG RECOMMENDATION AND THEREFOR IS SCHEDULED TO BE DELIVERED IN ACCORDANCE WITH THE SAG SCHEDULE WITH A DELIVERY DATE OF OCTOBER 15TH OR EARLIER. IN PERFORMING THIS STUDY, AEROSPACE WILL LEVERAGE EXPERTISE IN VARIOUS ORGANIZATIONS WITHIN THE CORPORATION, PRIMARILY, PROJECT WEST WING (PWW), THE PHYSICAL SCIENCE S LABORATORY (PSL), THE ENGINEERING AND TECHNOLOGY GROUP (ETG), AND THE GPS PROGRAM OFFICE'S SYSTEMS ENGINEERING TEAM (GPS/ST). AEROSPACE'S PROJECT WEST WING WILL UTILIZE EXISTING IN-HOUSE ALL-SOURCE INTELLIGENCE DATA AND DRAW UPON UP TO DATE ILRS CHARACTERIZATION STUDIES, INFORMATION PROVIDED BY NASA, THE GLOBAL GEODETIC OBSERVING SYSTEM (GGOS) MANAGEMENT ACTIVITIES, AND OTHER EXTERNAL SOURCE INFORMATION (WHERE AVAILABLE) TO DOCUMENT THE CURRENT GLOBAL SOURCE ENVIRONMENT, INCLUDING GROUND, AIR, AND SPACE-BASED ILLUMINATION SOURCES ASSOCIATED WITH ILRS COOPERATIVE LASING. AEROSPACE WILL EVALUATE THE POTENTIAL IMPACT ON EXPECTED GPS/III USNDS SENSOR TECHNOLOGIES RESULTING FROM THE CURRENT AND FUTURE ILRS AND ASSOCIATED ENVIRONMENTS. AEROSPACE USNDS-RELATED ELECTRONICS AND SYSTEMS EXPERTS ALONG WITH INSTRUMENTATION AND EFFECTS PHENOMENOLOGY EXPERTS WILL PROVIDE AN ASSESSMENT (QUALITATIVE AND QUANTITATIVE) OF THE IMPACT OF VARIOUS CLASSES OF SOURCES ON SENSOR AND VALIDATED MISSION, PERFORMANCE REQUIREMENTS. THEY WILL ALSO IDENTIFY A SUBSET OF GREATEST CONCERN, HIGHLIGHTING THE TECHNOLOGICAL AND OPERATIONAL CHARACTERISTICS THAT DRIVE THIS CONCERN. AEROSPACE WILL REVIEW AND EVALUATE SOLUTIONS TO ADDRESS THESE IMPACTS AS PROPOSED BY THE MATERIEL AND NON-MATERIEL SOLUTIONS WORKING GROUPS AND EVALUATED BY THE ASSESSMENT OF THE EFFECTIVENESS AND RISKS OF EACH PROPOSED MATERIEL SOLUTION FOR USE IN IDENTIFYING PREFERRED OPTIONS FOR MATERIEL SOLUTIONS. |
| 80AFRC19F0024 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $362.21K | 2019-02-01 | 2020-05-31 | 541712 | EXECUTION OF COMMERCIAL CAPABILITIES FOR SUBORBITAL AND SMALL ORBITAL PAYLOAD INTEGRATION FOR ADVANCING NASA FUTURE MISSION NEEDS A KEY ASPECT OF NASA'S STRATEGY TO STIMULATE SPACE INDUSTRY AND SPARK ECONOMIC GROWTH, WHILE LEVERAGING THE INDUSTRY'S COMMERCIAL CAPABILITIES, IS TO DELIVER TECHNOLOGIES AND CAPABILITIES NEEDED FOR FUTURE NASA, OTHER GOVERNMENT AGENCY, AND COMMERCIAL MISSIONS. IN SUPPORT OF THAT STRATEGY, THE FLIGHT OPPORTUNITIES PROGRAM IS HELPING TO FOSTER DEVELOPMENT AND OPERATIONAL READINESS OF SUBORBITAL AND SMALL ORBITAL LAUNCH VEHICLES AND PAYLOAD TECHNOLOGIES TO ACCELERATE MATURATION OF COMMERCIAL FLIGHT OPPORTUNITIES FOR THE RAPID DEVELOPMENT OF SPACE TECHNOLOGY. TO FACILITATE OPTIMIZATION OF THE NASA SPACE TECHNOLOGY MISSION DIRECTORATE INVESTMENT OPPORTUNITIES WITH U.S. INDUSTRY, THE FLIGHT OPPORTUNITIES PROGRAM IS TASKING THE AEROSPACE CORPORATION TO CONTINUE PROVIDING TECHNICAL AND COMMERCIAL SPACE ANALYSIS TO ONGOING AND FUTURE PROJECTS. |
| 80LARC21F0020 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $360.98K | 2020-12-01 | 2025-11-30 | 541715 | SYSTEMS ENGINEERING TECHNICAL DISCIPLINE TEAM SUPPORT |
| NNM12AA24T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $360.56K | 2011-12-29 | 2015-04-13 | 541690 | AEROSPACE TASK #1,"INDEPENDENT ASSESSMENT OF LAUNCH OPERATIONS ARCHITECTURES" |
| 80ARC019F0088 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $359.49K | 2019-10-01 | 2020-09-30 | 541715 | THE CONTRACTOR SHALL PROVIDE ENGINEERING SERVICES IN SUPPORT OF SPECTRUM MANAGEMENT AND GLOBAL POSITIONING SYSTEM/POSITION NAVIGATION AND TIMING (GPS/PNT) PROJECT |
| 80KSC019F0276 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $359.11K | 2019-10-01 | 2020-09-30 | 541715 | THE COMMERCIAL CREW PROGRAM IS REQUESTING TECHNICAL SUPPORT TO CCP SYSTEMS ENGINEERING AND INTEGRATION (SE&I) FOR BOEING AND SPACEX LED CERTIFICATION TEAMS IN EVALUATION AND REFINEMENT OF PROVIDER CERTIFICATION PRODUCTS. |
| 19AQMM19C0179 | THE AEROSPACE CORPORATION | Department of State | $356.39K | 2019-09-30 | 2020-12-31 | 541715 | SUPPORT- PROFESSIONAL: PROGRAM MANAGEMENT/SUPPORT |
| 80JSC020F0294 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $355.63K | 2020-02-25 | 2020-11-30 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS. |
| 80MSFC25F7038 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $355.22K | 2025-08-21 | 2026-08-30 | 541715 | SUPPORT FOR THERMAL & MECHANICAL ANALYSIS |
| NNG12VN20T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $354.89K | 2012-02-21 | 2013-02-20 | 541712 | ICESAT-2/ATLAS SYSTEM SUPPORT: THE ATLAS INSTRUMENT FOR THE ICESAT-2 MISSION UNDERWENT PDR IN NOVEMBER 2011. THE CUSTOMER REQUIRES SUPPORT FROM AEROSPACE TO ASSIST IN ADVANCING THE DESIGN AND DEVELOPMENT OF THE ATLAS INSTRUMENT. THE AEROSPACE CORPORATION WILL PROVIDE TECHNICAL EXPERTISE TO THE ICESAT-2/ATLAS PROJECT IN THE AREAS OF INSTRUMENT AND ELECTRONICS INTEGRATION AND TEST AS WELL AS GUIDANCE, NAVIGATION AND CONTROL (GN&C) AND SYSTEMS ENGINEERING. IN ADDITION AEROSPACE WILL PROVIDE SUBJECT MATTER EXPERTS AS REQUESTED FOR PEER AND MILESTONE REVIEWS AND SPECIAL STUDIES. THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE PROJECT AND MULTIDISCIPLINARY ENGINEERING SERVICES, INDEPENDENT TESTING, CONTRACTOR-ON-SITE MONITORING, AND INDEPENDENT EVALUATION OF PROJECTS AND/OR PROGRAMS, INCLUDING COST, SCHEDULE, AND AFFORDABILITY ANALYSES, IN ANY PHASE OF THE LIFE-CYCLE. THE CONTRACTOR SHALL ALSO PROVIDE LEADERSHIP OR STAFFING FOR FOCUSED SCIENCE AND TECHNOLOGY STUDIES, ADVANCED SYSTEMS ARCHITECTURE, SYSTEMS ENGINEERING AND INDEPENDENT REVIEWS OF ALL ABOVE ACTIVITIES PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. ASSESSMENTS MAY INCLUDE SUPPORT (DIRECT OR INDIRECT) TO ARCHITECTURE AND SYSTEMS DEFINITION; STRATEGIC PLANNING AND TECHNOLOGY ROAD-MAPPING; PERFORMANCE EVALUATION OR TRADES STUDIES (INCLUDING TECHNICAL, COST, SCHEDULE, AND/OR RISK); ACQUISITION AND PROJECT MANAGEMENT; SYSTEMS ENGINEERING; DESIGN ANALYSIS (PRELIMINARY OR DETAILED DESIGN); ASSEMBLY, INTEGRATION, AND TEST; REQUIREMENTS VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; MISSION ASSURANCE (INCLUDING LAUNCH VERIFICATION); SYSTEMS SAFETY; RESEARCH AND TECHNOLOGY; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; SPECTRUM MANAGEMENT; CONFIGURATION MANAGEMENT, AND OTHERS. INDEPENDENT INSPECTION, ANALYSIS (INCLUDING MODELING AND SIMULATION), AND/OR TEST SHALL BE USED IN EXECUTION OF THIS SUPPORT. TYPES OF NASA ENDEAVORS MAY INCLUDE, BUT ARE NOT LIMITED TO, SPACECRAFT; INSTRUMENTS OR OTHER PAYLOADS; OBSERVATORIES; LAUNCH VEHICLES (FOR SUB-ORBITAL, ORBITAL, LUNAR, OR INTERPLANETARY MISSIONS); LAUNCH ABORT SYSTEMS; ROVERS, LANDERS, OR IMPACT VEHICLES; GROUND SYSTEMS (INCLUDING MISSION OPERATIONS, DATA PROCESSING AND DISSEMINATION, LAUNCH OPERATIONS, ETC.); FACILITIES (E.G. RESEARCH, TEST, LAUNCH); SPACE AND GROUND NETWORKS; BALLOONS; GROUND SUPPORT EQUIPMENT; SIMULATORS; AND NON-FLIGHT MODELS OR PROTOTYPES. |
| 80HQTR26F7037 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $350K | 2026-03-01 | 2027-03-31 | 541715 | ORGANIZATIONAL SUPPORT FOR SPACE ENVIRONMENTS TESTING MANAGEMENT OFFICE (SETMO) |
| NNM13AA16T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $349.98K | 2013-03-15 | 2014-04-23 | 541690 | IGF::OT::IGF AEROSPACE, ROCKET PROPULSION SUPPLIER CHAIN MAPPING |
| NNL13AC65T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $349.38K | 2013-09-27 | 2014-03-31 | 541330 | IGF::OT::IGF "DEVELOPMENT OF MISSION OPERATIONS (PHASE E) COST MODEL FOR THE EARTH SCIENCE AND EXPLORER PROGRAMS" - THIS STUDY WILL ASSESS HOW TO BUILD A PHASE E COST MODEL TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) TECHNICAL, MANAGEMENT AND COST REVIEW OF SMD ANNOUNCEMENT OF OPPORTUNITY (AO) PROPOSALS. THERE IS LIMITED PHASE E COST DATA AVAILABLE ON NASA PROPOSALS FOR STEP 1 BASED ON ANALYSIS OR VERIFICATION OF EARTH SCIENCE AND EXPLORER MISSIONS. PHASE E ENTAILS SPLITTING MISSION OPERATIONS DOWN TO A LOWER LEVEL THAT INCLUDES: THE CRUISE (OUTBOUND), ORBITAL (INSERTION TO TARGET), ORBITAL OPERATIONS, AND DATA ANALYSIS/SAMPLE ARCHIVING (PROCESSING). IN ADDITION, THE PHASE E COST MODEL WILL INCLUDE INTERNATIONAL SPACE STATION (ISS) INSTRUMENTS, CUBESATS, AND HIGH ALTITUDE BALLOONS. THE ISS IS A COMPLEX OF RESEARCH LABORATORIES IN LOW-EARTH ORBIT IN WHICH U.S. AND INTERNATIONAL ASTRONAUTS CONDUCT SCIENTIFIC AND TECHNOLOGICAL INVESTIGATIONS IN A SPACE ENVIRONMENT. NASA ALSO PLANS TO SEND CUBESATS INTO SPACE OVER THE NEXT THREE YEARS. NASA PLACES THE CUBESATS AS SECONDARY PAYLOADS ON ROCKET LAUNCHES THAT ARE ALREADY SCHEDULED. HIGH ALTITUDE BALLOONS PROVIDE A COST-EFFECTIVE PLATFORM TO ENABLE TECHNOLOGY DEVELOPMENT PAYLOADS TO BE TESTED IN A REALISTIC, SPACE-LIKE OPERATIONAL ENVIRONMENT. |
| 693KA924F00203 | THE AEROSPACE CORPORATION | Department of Transportation | $347.86K | 2024-09-20 | 2025-08-06 | 541715 | TASK 2 SUBTASK 07 PERMITTING, LICENSING, SAFETY ELEMENT APPROVAL, AND EXPERT TECHNICAL PRODUCTS |
| NNM13AA12T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $347.55K | 2013-02-01 | 2018-11-30 | 541690 | SERVICE CODE IGF::OT::IGF AEROSPACE TASK # 16,"STATE OF THE ART AND STATE OF IMPLEMENTATION OF COST AND SCHEDULE ANALYSIS ENGINEERING SUPPORT)" |
| 80LARC21F0096 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $347.42K | 2021-05-29 | 2026-05-31 | 541715 | PROPULSION TECHNICAL DISCIPLINE TEAM SUPPORT (FY21) |
| 80HQTR26F7022 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $344.87K | 2026-01-01 | 2026-09-30 | 541715 | SPACE TECHNOLOGY MISSION DIRECTORATE (STMD) SPACE TRANSPORTATION GO DOMAIN PROGRAMMATIC AND TECHNICAL SUPPORT SERVICES. |
| SAQMMA16M2894 | THE AEROSPACE CORPORATION | Department of State | $339.3K | 2016-09-30 | 2017-09-29 | 541611 | COUNTER SPACE TECHNOLOGIES LIST. IGF::OT::IGF |
| 80GRC017F0086 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $339.28K | 2017-09-25 | 2019-05-31 | 541712 | IGF::OT::IGF |
| 80AFRC20F0133 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $338.02K | 2020-10-01 | 2022-08-25 | 541715 | PROJECT MANAGEMENT AND PROJECT PLANNING SUPPORT FOR AFRC PROGRAMS&PROJECTS OFFICE |
| NNC12TA51T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $333K | 2012-02-24 | 2015-09-30 | 541712 | SEETS DELIVERY ORDER |
| NNL13AC10T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $332.69K | 2013-08-09 | 2016-01-31 | 541330 | IGF::OT::IGF "ASSESSING RISKS OF FRANGIBLE JOINT DESIGNS" - THE COMMERCIAL CREW CHIEF ENGINEER (CCP CE) HAS REQUESTED SUPPORT FROM THE NESC TO PERFORM RISK ANALYSES ON PARTNER DESIGNS OF FRANGIBLE JOINTS. THE ANALYSES WILL RESULT IN A PROPOSED FRANGIBLE JOINT DESIGN THAT WILL BE USED IN A ROM FEASIBILITY STUDY FOR DEVELOPMENT OF AN ANALYTICAL MODEL (TO INCLUDE TESTING REQUIRED TO VALIDATE THE MODEL IF POSSIBLE). THE NESC ASSESSMENT TEAM (THE TEAM) WILL NEED TO COLLECT AND ANALYZE DATA ON THE HISTORY OF FRANGIBLE JOINTS, FROM MULTIPLE LAUNCH VEHICLE VENDORS AND USERS, AS USED IN MANNED/UNMANNED FLIGHTS IN ORDER TO OBTAIN A COMPREHENSIVE UNDERSTANDING OF EACH DESIGN AND ITS FAILURE MODES; SUCCESSES AND FAILURES OF THE DESIGNS AND ANY MITIGATIONS USED; LESSONS LEARNED; DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING PERFORMED; ANALYSIS AND MODELING TOOLS THAT EXIST; AND MAKE A DETERMINATION OF WHAT DESIGNS CAN BE COMPARED (STATISTICALLY OR OTHERWISE) WITH OTHER PARTNER DESIGNS. BASED ON THE ANALYSES OF THE FRANGIBLE JOINT DATA, THE TEAM WILL PROPOSE A FRANGIBLE JOINT DESIGN TO THE CCP CE FOR USE IN A FEASIBILITY STUDY. THE TEAM WILL PERFORM THE FEASIBILITY STUDY FOR DEVELOPMENT OF AN ANALYTICAL MODEL (TO INCLUDE TESTING REQUIREMENTS TO VALIDATE THE MODEL IF POSSIBLE). THE STUDY SHOULD CONSIDER: UTILITY, COMPLEXITY AND CONFIDENCE OF THE MODEL, TIME TO COMPLETE, COST, AND TYPE AND NUMBER OF TESTS NECESSARY TO VALIDATE THE MODEL. THE TEAM WILL ALSO DETERMINE THE EMPIRICAL TEST PROGRAM FOR SINGLE MILD DETONATING FUSE (MDF) HIGH-LOAD FRANGIBLE JOINT SYSTEMS TO PROVIDE CONFIDENCE FOR USE IN HUMAN SPACEFLIGHT. THE TEAM WILL NEED TO IDENTIFY THE GENERAL TEST REQUIREMENTS BASED ON NASA AND EXTERNAL TO NASA SPECIFICATIONS AND STANDARDS; IDENTIFY PYRO TEST REQUIREMENTS; IDENTIFY SPECIFIC SENSITIVITIES IN ALL COMMERCIAL CREW APPLICABLE FRANGIBLE JOINT DESIGNS IN ORDER FOR THE IDENTIFICATION OF CONTROLS EITHER IN MANUFACTURING, ASSEMBLY, INSTALLATION AND TEST AND CHECKOUT; AND MERGE THE GENERAL AND SPECIFIC TEST REQUIREMENTS. |
| SAQMMA09M2390 | THE AEROSPACE CORPORATION | Department of State | $329.86K | 2009-09-28 | 2010-10-29 | 541712 | COUNTERSPACE SENSITIVE TECHNOLOGIES LIST |
| NNG11VN01T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $329.64K | 2011-06-17 | 2016-05-31 | 541712 | MARS ORGANIC MOLECULE ANALYZER (MOMA) WIDE RANGE PUMP (WRP) BEARINGS CONSULTATION - TO PROVIDE ENGINEERING CONSULTATION ON BEARINGS USED IN THE WIDE RANGE PUMP (WRP) THE MARS ORGANIC MOLECULE ANALYZER (MOMA) INSTRUMENT IS A COMBINED GAS CHROMATOGRAPH/MASS SPECTROMETER (GC/MS) PAYLOAD ON A LANDED MARS ROVER BEING DEVELOPED BY ESA AND IS PART OF THE EXOMARS PROGRAM. MOMA IS A JOINT COLLABORATION BETWEEN THE US AND THE MAX PLANCK INSTITUTE FOR SOLAR SYSTEM RESEARCH (MPS) IN GERMANY, WITH MPS AS THE LEAD INSTITUTION RESPONSIBLE FOR DELIVERING MOMA TO THE EUROPEAN SPACE AGENCY. THE US MOMA FLIGHT HARDWARE IS CURRENTLY SCHEDULED FOR DELIVERY TO MPS IN JULY 2014, WITH LAUNCH CURRENTLY SCHEDULED IN 2018. THE NASA GODDARD SPACE FLIGHT CENTER (GSFC) MANAGES THE DEVELOPMENT OF THE U.S. HARDWARE PORTION OF THE MOMA INSTRUMENT FOR THE PROJECT SCIENTIST, DR. WILL BRINCKERHOFF, ALSO OF GSFC. THE ROLE OF THE CONTRACTOR ON THE MOMA INSTRUMENT IS TO PROVIDE ENGINEERING CONSULTATION ON BEARINGS USED IN THE WIDE RANGE PUMP (WRP) WHICH IS BEING DEVELOPED BY CREARE, INC OF NEW HAMPSHIRE. THE CONTRACTOR SHALL PROVIDE ENGINEERING ASSESSMENT AND RECOMMENDATIONS ON THE DESIGN, DEVELOPMENT, FABRICATION AND TESTING OF BEARINGS PROCURED BY CREARE AND USED IN THE WRP FOR MOMA. IN ADDITION, THE CONTRACTOR SHALL PERFORM TESTING, EVALUATION AND INSPECTION ON THE BEARINGS USED IN THE VARIOUS TEST AND FLIGHT UNIT WRPS. THE CONTRACTOR SHALL PROVIDE WRITTEN REPORTS ON THE OUTCOME OF ANY TESTS, EVALUATIONS AND INSPECTIONS. THE CONTRACTOR SHALL PARTICIPATE IN WEEKLY WRP STATUS TELECONS, SPECIAL TOPIC TELECONS AS NEEDED, EVALUATE&INSPECT BEARINGS AT VARIOUS STAGES OF WRP DEVELOPMENT AT CREARE S FACILITY AND PROVIDE A TECHNICAL INTERFACE FOR THE SAM PROJECT AT THE BEARING VENDOR(S). THE EFFORT SHALL BE COORDINATED WITH THE MOMA INSTRUMENT. THE CONTRACTOR SHALL DELIVER MONTHLY PROGRESS AND FINANCIAL REPORTS. |