Awards for “THE AEROSPACE CORPORATION”
25 awards on this page · sorted by amount · page 13
| Award ID | Recipient | Awarding agency | Amount | Start | End | NAICS | Description |
|---|---|---|---|---|---|---|---|
| 80GRC020F0075 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $599.86K | 2020-02-13 | 2021-12-31 | 541715 | RADIOISOTOPE POWER SYSTEMS (RPS) PROGRAM SUPPORT |
| NNM13AA20T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $599.61K | 2013-06-28 | 2015-12-30 | 541690 | IGF::OT::IGF SPACE LAUNCH SYSTEM (SLS) AERODYNAMICS AND LOADS SUPPORT. |
| 80ARC024F0055 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $599.28K | 2024-08-22 | 2025-06-30 | 541715 | THE CONTRACTOR SHALL PROVIDE SPECIALIZED ENG SERVICES TO INCLUDE TRADE STUDIES, DESIGN, AND SYSTEMS ENG SUPPORT FOR THE SPINSAT SPACECRAFT TO MATURE THE DEVELOPMENT OF THIS EXPERIMENTAL PLATFORM TOWARDS A POINT DESIGN LEVEL OF MATURITY. |
| 80HQTR25F7170 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $597.7K | 2025-10-11 | 2027-01-10 | 541715 | ELEMENT DEVELOPMENT AND INTEGRATION PROGRAM PLANNING SUPPORT FOR THE STRATEGY AND ARCHITECTURE OFFICE |
| DOCT0027 | THE AEROSPACE CORPORATION | Department of Commerce | $597.11K | 2016-03-21 | 2016-12-31 | 541712 | IGF::OT::IGF FFRDC SUPPORT. FOLLOW-ON TASK ORDER AWARD. |
| NNG13VN44T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $596.28K | 2013-07-26 | 2015-03-31 | 541712 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE EXPERIENCED SYSTEMS ENGINEERING SUPPORT FOR ALL PHASES OF THE FREE-FLYER PROJECT; MONITOR AND REPORT PROGRESS AND CONFORMANCE TO APPROPRIATE PRACTICES AND SPECIFICATIONS. THE CONTRACTOR PERSONNEL WILL ASSIST IN THE FOLLOWING: .PROVIDE SYSTEM ENGINEERING SUPPORT TO THE PFFP (MISSION, SPACECRAFT, INSTRUMENT SUITE, AND GROUND) .SUPPORT THE DEVELOPMENT OF MISSION, SPACECRAFT, OBSERVATORY AND SYSTEMS ENGINEERING REQUIREMENTS AND ASSIST IN THE GENERATION AND EVALUATION OF DOCUMENTATION; .SUPPORT THE PLANNING, ORGANIZING, SCHEDULING, MANAGING AND DIRECTING OF EFFORTS FROM PROCUREMENT, DEVELOPMENT, FABRICATION AND ASSEMBLY, INTEGRATION AND TEST, LAUNCH AND ON-ORBIT ACTIVATION OF THE PFFP SPACECRAFT/OBSERVATORY(S); .SUPPORT REQUIREMENTS DEFINITION, FLOW DOWN, VALIDATION AND VERIFICATION; .PREPARE INTERFACE CONTROL DOCUMENTS AND VERIFYING PROPER IMPLEMENTATION FOR INSTRUMENTS, SPACE AND GROUND SEGMENTS; .MONITOR AND CONTROL EXTERNAL INTERFACE DOCUMENTATION AND REQUIREMENTS; .PARTICIPATE IN INSTRUMENT, SUBSYSTEM, SPACE AND GROUND SEGMENT DESIGN REVIEWS/MEETING AND WORKING GROUPS, FOREIGN AND DOMESTIC; .REVIEW PROJECT DOCUMENTATION AND SUBMIT COMMENTS AND RECOMMENDATIONS; .PREPARE AND PRESENT TECHNICAL INFORMATION FOR TECHNICAL MEETINGS/REVIEWS/BRIEFINGS; .ANALYZE CONFIGURATION, DESIGN, AND PROCEDURAL CHANGES SUBMITTED TO CHANGE CONTROL BOARDS; .IDENTIFY RISK ELEMENTS, DEVELOP AND EXECUTE MITIGATION STEPS; PARTICIPATE IN THE PFFP RISK BOARD; .PREPARE AND OR REVIEW HARDWARE AND SOFTWARE BUILD AND INTEGRATION PLANS, PROCEDURES, AND WITNESS EXECUTION; .PREPARE AND OR REVIEW DETAILED FUNCTIONAL AND ENVIRONMENTAL TEST PLANS AND PROCEDURES FOR INSTRUMENT, SPACE AND GROUND SEGMENTS AND WITNESS TEST EXECUTION; .ANALYZE TEST DATA AND PROVIDE ASSESSMENT; .PROVIDE SUPPORT TO THE DEVELOPMENT, TEST AND IMPLEMENTATION OF THE PFFP GROUND SEGMENT, MISSION OPERATIONS CENTER, COMMUNICATION NETWORKS, SCIENCE DATA PROCESSING AND STORAGE; .PARTICIPATE IN TEST/FAILURE REVIEW BOARDS; .SUPPORT THE PREPARATION FOR SHIPMENT OF THE OBSERVATORY AND GSE TO THE LAUNCH SITE; . SUPPORT THE LAUNCH SITE CHECKOUT, INTEGRATION AND TEST OF FLIGHT AND GROUND SYSTEMS, INCLUDING ADEQUACY OF LAUNCH SITE FACILITY |
| 80HQTR22F0099 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $594.18K | 2022-07-01 | 2023-06-30 | 541715 | OSMA MISSION AND PROGRAM ASSESSMENT DIVISION SUPPORT MPAD |
| 80GSFC18F0023 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $594.16K | 2017-10-29 | 2019-09-30 | 541712 | THE NASA CONJUNCTION ASSESSMENT RISK ANALYSIS CARA GROUP PROVIDES SUPPORT TO MISSION CUSTOMERS TO ANALYZE COLLISION THREATS TO THEIR ASSETS AND TO DEVELOP PROCESSES FOR REACTING TO THOSE THREATS. THE ROLE OF THE CARA CHIEF ENGINEER IS TO SERVE AS THE TASKS PRINCIPAL TECHNICAL SUBJECT MATTER EXPERT REPRESENT THE TASK TO EXTERNAL AGENCIES ON TECHNICAL MATTERS GUIDE THE TASKS OVERALL PHILOSOPHY AND TECHNICAL DIRECTION AND PROVIDE SYSTEM ENGINEERING SUPPORT TO ALL ASPECTS OF THE CAA PROGRAM. THE PURPOSE OF THIS TASK IS TO STAFF THE CHIEF ENGINEER POSITION. |
| NNL15AB48T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $589.75K | 2015-06-08 | 2016-12-31 | 541330 | IGF::OT::IGF " NESC (NASA ENGINEERING AND SAFETY CENTER) MOLDED AVCOAT BLOCK BOND VERIFICATION " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO PROVIDE ASSISTANCE IN THE DEVELOPMENT OF A BOND VERIFICATION PLAN FOR THE NEW ORION HEATSHIELD ARCHITECTURE WHICH USES INDIVIDUAL MOLDED BLOCKS OF ABLATOR MATERIAL (AVCOAT) ADHESIVELY BONDED TO THE CARRIER STRUCTURE. MAJOR ELEMENTS OF THE BOND VERIFICATION PLAN WILL INCLUDE 1) PROCESS CONTROLS; 2) EFFECTS OF DEFECTS; 3) PROOF TESTING; AND 4) NON-DESTRUCTIVE EVALUATION (NDE). |
| DOCT0012 | THE AEROSPACE CORPORATION | Department of Commerce | $586.91K | 2013-11-12 | 2015-05-15 | 541712 | IGF::OT::IGF -- NCDC ADVICE AND ASSISTANCE IN PROGRAM AND PROJECT MANAGEMENT. |
| 80MSFC19F0013 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $586.71K | 2018-10-31 | 2019-12-31 | 541712 | THE TDM PO IS CHARGED WITH PROVIDING PROGRAM-LEVEL OVERSIGHT TO A SERIES OF FLIGHT PROJECTS THAT WILL DEMONSTRATE NEW TECHNOLOGIES IN SPACE. |
| NNL06AD39T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $586.02K | 2006-09-28 | 2007-07-31 | 541330 | ROCKET PROPULSION TEST CAPABILITY ALIGNMENT STUDY |
| 80MSFC24F0141 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $574.86K | 2024-09-27 | 2026-05-31 | 541715 | SUPPORT FOR STABLE COMBUSTION IN ROCKET ENGINES (SCORE) |
| 80ARC024F0050 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $562.49K | 2024-10-01 | 2026-10-30 | 541715 | THE CONTRACTOR SHALL PROVIDE SPECIALIZED ENGINEERING SERVICES FOR THE HELIOSWARM FLIGHT MISSION TO INCLUDE REQUIREMENTS DEFINITION, CONTAMINATION PLANNING FOR THE SCIENCE INSTRUMENTS AND SPACECRAFT, RF SPECTRUM PLANNING, AND ANALYSIS SUPPORT. |
| 80KSC020F0177 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $561.86K | 2020-10-01 | 2023-09-30 | 541715 | NASA SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES (NSEETS) EXPLORATION GROUND SYSTEMS (EGS) MODELING AND ANALYSIS TASK ORDER FOR FY21 |
| 80KSC023F0091 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $555.93K | 2023-10-01 | 2026-09-30 | 541715 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES FOR EXPLORATION GROUND SYSTEMS MODELING AND ANALYSIS SUPPORT. |
| 80KSC022F0081 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $549.78K | 2022-10-01 | 2023-09-30 | 541715 | NASA SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES SUPPORT FOR HUMAN LANDING SYSTEMS GROUND OPERATIONS. |
| NNM15AA27T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $547.31K | 2015-06-11 | 2016-08-15 | 541690 | IGF::OT::IGF PROVIDE INTEGRATED SUPPORT FOR THE TECHNOLOGY DEMONSTRATION MISSION PROGRAM OFFICE |
| NND17AA37T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $547.08K | 2017-03-21 | 2018-12-31 | 541712 | IGF::OT::IGF TASK ORDER NO. NND17AA37T ULTRA AIRBORNE FIELD MILL (ABFM) THE FY17 AIRBORNE FIELD MILL (ABFM) FLIGHT DEMO WILL COLLECT CLOUD ELECTRIFICATION MEASUREMENTS AT ALTITUDES OF 15KFT TO 45KFT USING A MANNED AIRCRAFT. FLIGHTS WILL BE CONDUCTED BETWEEN JUN 2017 AND AUG 2017 ON A NON-INTERFERENCE BASIS WITH THE SCHEDULED RANGE OPERATIONS. THE GOAL OF THIS DEMONSTRATION IS TO SHOW THAT NEAR REAL-TIME CLOUD ELECTRIFICATION DATA CAN BE USED TO SIGNIFICANTLY REDUCE THE NUMBER OF SCRUBS OR HOLDS THAT WOULD OTHERWISE HAVE OCCURRED WITHOUT THE AIRBORNE DATA. THE EASTERN AND WESTERN RANGES CURRENTLY USE GROUND FIELD MILL SENSORS TO QUANTIFY ELECTRIC FIELD POTENTIAL OF CLOUDS. THIS DATA IS ESSENTIAL TO THE LAUNCH WEATHER OFFICER (LWO) IN MAKING LAUNCH SCRUBS/HOLD DECISIONS. POST-LAUNCH RESEARCH AND DATA ANALYSIS CONDUCTED BY AEROSPACE CORP SHOWS THAT 80-90% OF LAUNCHES DELAYED THAT ARE DUE TO VIOLATION OF THE GROUND-BASED LIGHTNING LAUNCH COMMIT CRITERIA (LLCC) WOULD ACTUALLY HAVE NO ADVERSE IMPACTS TO LAUNCH AND THAT AIRBORNE LLCCS WOULD PROVIDE THE LWO WITH MORE ACCURATE DATA THAN THE GROUND LLCCS WHICH COULD SIGNIFICANTLY REDUCE THE NUMBER OF HOLD/SCRUBS FOR FUTURE MISSIONS. SPACE&MISSILES CENTER, RANGE&NETWORK DIVISION (SMC/RN) INTENDS TO EXECUTE A PROOF OF CONCEPT DEMO TO BE CONDUCTED ON THE EASTERN RANGE (CAPE CANAVERAL, FL) TO DEMONSTRATE THE CAPABILITY OF PROVIDING REAL-TIME AIRBORNE ELECTRIC FIELD MILL SENSOR DATA TO THE MORRELL OPERATIONS CENTER (MOC) LOCATED AT NASA KENNEDY SPACE CENTER. THIS CAPABILITY WILL ASSIST LAUNCH WEATHER OPERATORS IN MAKING MISSION WEATHER ASSESSMENTS. SMC/RN HAS ENLISTED THE SUPPORT OF NASA IN THE CONDUCT OF THIS DEMONSTRATION. NASA IN TURN IS SEEKING SUPPORT FROM THE AEROSPACE CORP. GIVEN THEIR EXTENSIVE BACKGROUND AND KNOWLEDGE IN THIS AREA. |
| 693KA924F00204 | THE AEROSPACE CORPORATION | Department of Transportation | $544.42K | 2024-09-20 | 2025-08-06 | 541715 | MISHAP INVESTIGATION TECHNICAL SUPPORT |
| 80MSFC18F0058 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $543.77K | 2018-02-28 | 2019-09-30 | 541712 | TECHNICAL ANALYSES AND ASSESSMENTS SERVICES FOR THE SPACE LAUNCH SYSTEM |
| 80LARC21F0102 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $543.17K | 2021-05-27 | 2025-05-31 | 541715 | PROGRAMMATIC EXPERTISE AND SYSTEMS ENGINEERING SUPPORT. THE GAME CHANGING DEVELOPMENT PROGRAM OFFICE PROGRAM ELEMENT MANAGERS CONDUCT REGULAR TECHNICAL ASSESSMENT AND PROGRAMMATIC REVIEWS. |
| NNL16AA64T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $542.19K | 2016-02-04 | 2019-02-28 | 541330 | IGF::OT::IGF " ASSESSING RISKS OF FRANGIBLE JOINT DESIGNS " - THE SCOPE OF THIS EFFORT IS FOR THE CONTRACTOR TO (1) REDUCE ENGINEERING UNCERTAINTY IN THE MECHANICS OF FRANGIBLE JOINT OPERATION BY DETERMINING THE SENSITIVITIES IN THE FRANGIBLE JOINT DESIGN, (2) UNDERSTAND WHAT DRIVERS (FACTOR SENSITIVITIES) IMPACT RELIABILITY SO THAT DESIGNS CAN BE BETTER EVALUATED IN REGARD TO CREW RISK, AND (3) MAKE RECOMMENDATIONS FOR IMPROVING ROBUSTNESS OF FRANGIBLE JOINT DESIGNS AS NECESSARY. |
| 80MSFC21F0100 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $541.57K | 2021-04-20 | 2023-09-30 | 541715 | THE AEROSPACE CORPORATION WILL PROVIDE SUPPORT TO THE PROGRAM INTEGRATION PROJECT, PLANNING & CONTROL (PP&C) PLANETARY MISSIONS PROGRAM OFFICE (PMPO). |
| NNL10AB70T | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $535.54K | 2010-04-14 | 2010-07-30 | 541330 | THE PURPOSE OF THIS TASK IS TO PROVIDE EXPERTISE IN TECHNICAL, MANAGEMENT, AND COST TO SOMA FOR EVALUATIONS OF PROPOSALS SOLICITED THROUGH PROGRAM ELEMENT APPENDIX (PEA) H6 OF THE 2008 STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON) ANNOUNCEMENT OF OPPORTUNITY (AO). |